Schedule comparison report

Beechline Beechline

Baseline: E8P02 Update No. 11

Update: E8P02 Update No 36

Schedule Comparison

This table represents progress recorded since E8P02 Update No. 11.

Legend

Completed activities Current percent complete is not a round number Progress was decreased since previous update

Activity IDActivity DescriptionOld Complete %New Complete %Change %
GC-GCN130PH MS - Start Phase IIA Construction0%100%100%
GC-GCN140PH MS - Start Phase II B Construction0%100%100%
GC-GCN150PH MS - Start Phase II C Construction0%100%100%
GC-GCN160PH MS - Start Phase IV Construction0%100%100%
GC-GCN170PH MS - Start Phase III B Construction0%100%100%
GC-GCN180PH MS - Start Phase III C Construction0%100%100%
GC-GCN190PH MS - Start Phase II D Construction0%100%100%
GC-GCN200PH MS - Start Phase III A Construction0%100%100%
GC-GCN220Written Suspend order - FOC related to pending change0%100%100%
IAWBO-SP110PH IA - Drainage (42") @ JYP Interchange - WB Outside Widening Area (SR528)0%100%100%
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)0%100%100%
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)0%100%100%
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)0%100%100%
IBEBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening50%100%50%
IBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening20%100%80%
IBEBM-RW220PH IB - Grade (I4-International Drive) - EB Median Widening0%100%100%
IBEBM-RW230PH IB - Grade (International Drive - Universal) - EB Median Widening0%100%100%
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening0%100%100%
IBEBM-RW250PH IB - Stabilization (I4-international Drive) - EB Median Widening0%100%100%
IBEBM-RW260PH IB - Stabilization (International Drive - Universal) - EB Median Widening0%100%100%
IBEBM-RW270PH IB - Stabilization (Universal - JYP) - EB Median Widening0%100%100%
IBEBM-RW280PH IB - Base (I4-International Drive) - EB Median Widening70%100%30%
IBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening0%100%100%
IBEBM-RW300PH IB - Base (Universal - JYP) - EB Median Widening0%100%100%
IBEBM-RW310PH IB - Guard Rail Removal - EB Median Widening90%100%10%
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0%100%100%
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0%100%100%
IBEBM-ST450PH IB - Set Beams - EB Median Widening (Bridge over International Drive)0%100%100%
IBEBM-ST460PH IB - Superstructure Deck - EB Median Widening (Bridge over International Drive)0%100%100%
IBEBM-ST550PH IB - Approach Slabs - EB Median Widening (Bridge over International DR)0%100%100%
IBEBM-ST580PH IB - Lighting Conduit - EB Median Widening (Bridge over International DR)0%100%100%
IBEBM-ST590PH IB - Traffic Railing (32") - EB Median Widening (Bridge over International DR)0%100%100%
IBEBM-ST600PH IB - Grind and Groove - EB Median Widening (Bridge over International DR)0%100%100%
IBEBM-ST660PH IB - Set Beams - EB Median Widening (Bridge over John Young PKWY)0%100%100%
IBEBM-ST670PH IB - Superstructure Deck - EB Median Widening (Bridge over John Young PKWY)0%100%100%
IBEBM-ST730PH IB - Approach Slabs - EB Median Widening (Bridge over John Young PKWY)0%100%100%
IBEBM-ST750PH IB - Set Beams - EB Median Widening (Bridge over Universal BLVD)0%100%100%
IBEBM-ST760PH IB - Superstructure Deck - EB Median Widening Bridge over Universal BLVD)0%100%100%
IBEBM-ST770PH IB - Lighting Conduit - EB Median Widening (Bridge over John Young PKWY)0%100%100%
IBEBM-ST780PH IB - Traffic Railing (32") - EB Median Widening (Bridge over John Young PKWY)0%100%100%
IBEBM-ST790PH IB - Grind and Groove - EB Median Widening (Bridge over John Young PKWY)0%100%100%
IBEBM-ST840PH IB - Approach Slabs - EB Median Widening (Bridge over universal BLVD)0%100%100%
IBEBM-ST860PH IB - Lighting Conduit - EB Median Widening (Bridge over universal BLVD)0%100%100%
IBEBM-ST870PH IB - Traffic Railing (32") - EB Median Widening (Bridge over universal BLVD)0%100%100%
IBEBM-ST880PH IB - Grind and Groove - EB Median Widening (Bridge over universal BLVD)0%100%100%
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0%100%100%
IBEBM-W100PH IB - Median Wall - Grading (JYP to TPK)75%100%25%
IBEBM-W110PH IB - Median Wall - FFP Footing/Stem (JYP to TPK)70%100%30%
IBEBO-EW120PH IB - Pond Excav/Embank I-4 to Int. Dr. - EB Outside Widening0%100%100%
IBEBO-EW130PH IB - Pond Excav/Embank JYP to Universal - WB Outside Widening84%100%16%
IBEBO-EW140PH IB - Pond Excav/Embank Universal to Int. Dr. - WB Outside Widening84%100%16%
IBEBO-EW150PH IB - Pond Excav/Embank Universal to Int. Dr. - EB Outside Widening90%100%10%
IBEBO-EW160PH IB - Pond Excav/Embank Universal to JYP - EB Outside Widening70%100%30%
IBEBO-EW170PH IB - Pond Excav/Embank Int. Dr. to I-4 - WB Outside Widening45%100%55%
IBEBO-SP150PH IB - Drainage (Pond 5C @ John Young) - EB Outside Widening (Ponds)10%100%90%
IBR-AP120PH IB - Asphalt - Structural - Ramp C (Redundant)0%100%100%
IBR-EW100PH IB - Embankment - Ramp B/C Gore0%100%100%
IBR-EW110PH IB - Embankment - Ramp C (Redundant)0%100%100%
IBR-GC120PH IB - Guardrail (Roadway) - Ramp B/C Gore (Activity Not Req'd)0%100%100%
IBR-GC130PH IB - Clear & Grub/Demo - Ramp C (Redundant)0%100%100%
IBR-GC150PH IB - Performance Turf, SOD - Ramp C (Redundant)0%100%100%
IBR-GC160PH IB - Guardrail (Roadway) - Ramp C (Redundant)0%100%100%
IBR-IHM300PH IB - Install High Mast/Service (1-3)75%100%25%
IBR-RW100PH IB - Stabilization - Ramp B/C Gore0%100%100%
IBR-RW110PH IB - Base - Ramp B/C Gore0%100%100%
IBR-RW120PH IB - Stabilization - Ramp C (Redundant)0%100%100%
IBR-RW130PH IB - Base - Ramp C (Redundant)0%100%100%
IBR-TC100PH IB - Set Temp Traffic Barriers - Ramp B/C Gore0%100%100%
IBR-TC110PH IB - Set Temp Traffic Barriers - Ramp C (Redundant)0%100%100%
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening0%100%100%
IBWBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening50%100%50%
IBWBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening20%100%80%
IBWBM-RW130PH IB - Grade (JYP-Universal) - WB Median Widening0%100%100%
IBWBM-RW140PH IB - Stabilization (JYP-Universal) - WB Median Widening0%100%100%
IBWBM-RW150PH IB - Base (JYP-Universal) - WB Median Widening0%100%100%
IBWBM-RW160PH IB - Grade (Universal-International Drv.) - WB Median Widening0%100%100%
IBWBM-RW170PH IB - Stabilization (Universal-International Drv.) - WB Median Widening0%100%100%
IBWBM-RW180PH IB - Base (Universal-International Drv.) - WB Median Widening0%100%100%
IBWBM-RW190PH IB - Grade (International Drive-I4) - WB Median Widening0%100%100%
IBWBM-RW200PH IB - Stabilization (International Drv.-I4) - WB Median Widening0%100%100%
IBWBM-RW210PH IB - Base (International Drv.-I4) - WB Median Widening0%100%100%
IBWBM-RW220PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening0%100%100%
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening0%100%100%
IBWBM-SP100PH IB - Drainage for JYP Interchange (Sta 354 +04)90%100%10%
IBWBM-SP120PH IB - Drainage for JYP to Int. Dr. (Sta 354+04 to 234+50)85%100%15%
IBWBM-ST350PH IB - Set Beams - WB Median Widening (Bridge over International Drive)0%100%100%
IBWBM-ST360PH IB - Superstructure Deck - WB Median Widening (Bridge over International Drive)0%100%100%
IBWBM-ST390PH IB - Approach Slabs - WB Median Widening (Bridge over International DR)0%100%100%
IBWBM-ST430PH IB - Lighting Conduit - WB Median Widening (Bridge over International DR)0%100%100%
IBWBM-ST440PH IB - Traffic Railing (32") - WB Median Widening (Bridge over International DR)0%100%100%
IBWBM-ST470PH IB - Grind and Groove - WB Median Widening (Bridge over International DR)0%100%100%
IBWBM-ST560PH IB - Set Beams - WB Median Widening (Bridge over John Young PKWY)0%100%100%
IBWBM-ST580PH IB - Superstructure Deck - WB Median Widening (Bridge over John Young PKWY)0%100%100%
IBWBM-ST590PH IB - Set Beams - WB Median Widening (Bridge over Universal BLVD)0%100%100%
IBWBM-ST600PH IB - Superstructure Deck - WB Median Widening Bridge over Universal BLVD)0%100%100%
IBWBM-ST610PH IB - Approach Slabs - WB Median Widening (Bridge over John Young PKWY)0%100%100%
IBWBM-ST630PH IB - Lighting Conduit - WB Median Widening (Bridge over John Young PKWY)0%100%100%
IBWBM-ST640PH IB - Traffic Railing (32") - WB Median Widening (Bridge over John Young PKWY)0%100%100%
IBWBM-ST650PH IB - Approach Slabs - WB Median Widening (Bridge over universal BLVD)0%100%100%
IBWBM-ST660PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over universal BLVD)40%100%60%
IBWBM-ST670PH IB - Grind and Groove - WB Median Widening (Bridge over John Young PKWY)0%100%100%
IBWBM-ST680PH IB - Lighting Conduit - WB Median Widening (Bridge over universal BLVD)0%100%100%
IBWBM-ST690PH IB - Traffic Railing (32") - WB Median Widening (Bridge over universal BLVD)0%100%100%
IBWBM-ST700PH IB - Grind and Groove - WB Median Widening (Bridge over universal BLVD)0%100%100%
IBWBM-TC150PH IB - Construct Diversion at I-Drive - WB Median Widening0%100%100%
IBWBM-W100PH IB - Median Wall - Construct/ slip Top (JYP to TPK)60%100%40%
IBWBO-SP100PH IB - Jack & Bore JYP Interchange (Sta 354 +04)90%100%10%
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)40%100%60%
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)0%100%100%
IIAEBO-AP100PH IIA - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0%100%100%
IIAR-AP100PH IIB - Asphalt - Structural - Ramp O0%100%100%
IIAR-EW100PH IIB - Embankment - Ramp O75%100%25%
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O0%100%100%
IIAR-RW100PH IIB - Stabilization - Ramp O0%100%100%
IIAR-RW110PH IIB - Base - Ramp O0%100%100%
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)0%100%100%
IIAR110PH IIA - Construct Ramp O Diversion - Ramp O (Tie in to EB)90%100%10%
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive0%100%100%
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0%100%100%
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)0%100%100%
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)0%100%100%
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3200%100%100%
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320%100%100%
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0%100%100%
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening0%100%100%
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening20%100%80%
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening0%100%100%
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility0%100%100%
IIBEBO-GC100PH IIB - MISC. Demo - EB Outside Widening0%100%100%
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening0%100%100%
IIBEBO-IE20PH IIB - Install 2 Ea Mast Arms at Jyp0%100%100%
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening0%100%100%
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0%100%100%
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)0%100%100%
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening0%100%100%
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR0%100%100%
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)0%100%100%
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA0%100%100%
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0%100%100%
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)0%100%100%
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)0%100%100%
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)0%100%100%
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)0%100%100%
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)0%100%100%
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)0%100%100%
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)0%100%100%
IIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)0%100%100%
IIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)0%100%100%
IIBEBO-ST10PH IIB - Test Pile - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST11PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST110PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST12PH IIB - Production Pile - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST120PH IIB - Wall Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST130PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST14PH IIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)0%100%100%
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST150PH IIB - End Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST16PH IIB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)0%100%100%
IIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST17PH IIB - Removal of Concrete Forms Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLV0%100%100%
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST18PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST180PH IIB - Wall Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST200PH IIB - End Bent 3 - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST210PH IIB - Curing Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST220PH IIB - End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST23PH IIB - Production Pile (H Piles) (32-62) -EB Outside Widening (Bridge 750629 Ramp S over JYP)60%100%40%
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr0%100%100%
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST25PH IIB - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST250PH IIB - Set Beams - EB Outside Widening (Bridge over International Drive)0%100%100%
IIBEBO-ST26PH IIB - Remove of Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S ov65.97%100%34.03%
IIBEBO-ST260PH IIB - End Bent 1 - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST270PH IIB - Superstructure Deck - EB Outside Widening (Bridge over International Drive)0%100%100%
IIBEBO-ST280PH IIB - Set Beams - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST290PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST31PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)20%100%80%
IIBEBO-ST310PH IIB - End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST320PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST340PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST350PH IIB - Superstructure Deck Finish Rebar\Set screed\Pouring - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST360PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST370PH IIB - Lighting Conduit - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST380PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)55%100%45%
IIBEBO-ST400PH IIB - End Bent 1 - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST420PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST430PH IIB - Approach Slabs - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST440PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST450PH IIB - End Bent 3 - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST460PH IIB - Lighting Conduit - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST470PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST480PH IIB - Set Beams - EB Outside Widening (Bridge over Universal BLVD)0%100%100%
IIBEBO-ST490PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST500PH IIB - Superstructure Deck SIP / Overhangs / Edges - EB Outside Widening (Bridge over Universal BLVD)0%100%100%
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST520PH IIB - Superstructure Deck Rebar - EB Outside Widening (Bridge over Universal BLVD)0%100%100%
IIBEBO-ST530PH IIB - Approach Slabs - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST550PH IIB - Lighting Conduit - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST560PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST570PH IIB - Superstructure Deck Pour - EB Outside Widening (Bridge over Universal BLVD)0%100%100%
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST600PH IIB - Lighting Conduit - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST610PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST630PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST640PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST650PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST660PH IIB - Remove Beams - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST670PH IIB - Demo Pile Cap - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST680PH IIB - Extract Piles - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST690PH IIB - Pier 2, 3, 4 (F/R/P)(Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)95%100%5%
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-ST710PH IIB - Curing for End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)0%100%100%
IIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)0%100%100%
IIBEBO-ST730PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over universal BLVD)0%100%100%
IIBEBO-ST740PH IIB - Curing for End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside Widening0%100%100%
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive0%100%100%
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive0%100%100%
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive0%100%100%
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0%100%100%
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)0%100%100%
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening0%100%100%
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside0%100%100%
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E0%100%100%
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C0%100%100%
IIBR-AP130PH IIB - Asphalt - Structural - Ramp I-10%100%100%
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H0%100%100%
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-20%100%100%
IIBR-AP160PH IIB - Asphalt - Structural - Ramp I4- Interstate0%100%100%
IIBR-AP170PH IIB - Asphalt - Structural - Ramp L0%100%100%
IIBR-AP180PH IIB - Asphalt - Structural - Ramp U0%100%100%
IIBR-EC10PH IIB - Erect Cantilevers (1-3)0%100%100%
IIBR-EHM340PH IIB - Existing High Mast Removal (1-8)0%100%100%
IIBR-EHM350PH IIB - Existing High Mast Removal (9-18)0%100%100%
IIBR-EHM360PH IIB - Existing High Mast Removal (19-27)0%100%100%
IIBR-EW110PH IIB - Embankment - Ramp E50%100%50%
IIBR-EW120PH IIB - Embankment - Ramp S-133%100%67%
IIBR-EW130PH IIB - Embankment - Ramp R-10%100%100%
IIBR-EW140PH IIB - Embankment - Ramp C0%100%100%
IIBR-EW150PH IIB - Embankment - Ramp I-10%100%100%
IIBR-EW160PH IIB - Embankment - Ramp H0%100%100%
IIBR-EW170PH IIB - Embankment - Ramp R-20%100%100%
IIBR-EW180PH IIB - Embankment - Ramp I4- Interstate0%100%100%
IIBR-EW190PH IIB - Embankment - Ramp L0%100%100%
IIBR-EW200PH IIB - Embankment - Ramp U33%100%67%
IIBR-EW210PH IIB - Embankment - Ramp D0%100%100%
IIBR-GC110PH IIB - Demo - Ramp E0%100%100%
IIBR-GC130PH IIB - Demo - Ramp R-10%100%100%
IIBR-GC140PH IIB - Demo - Ramp I-10%100%100%
IIBR-GC150PH IIB - Demo - Ramp S-10%100%100%
IIBR-GC170PH IIB - Demo - Ramp C0%100%100%
IIBR-GC220PH IIB - Guardrail (Roadway) - Ramp E0%100%100%
IIBR-GC240PH IIB - Demo - Ramp H0%100%100%
IIBR-GC260PH IIB - Guardrail (Roadway) - Ramp I-10%100%100%
IIBR-GC290PH IIB - Demo - Ramp R-20%100%100%
IIBR-GC300PH IIB - Demo - Ramp I4- Interstate0%100%100%
IIBR-GC310PH IIB - Demo - Ramp L0%100%100%
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R0%100%100%
IIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate0%100%100%
IIBR-GC350PH IIB - Demo - Ramp U0%100%100%
IIBR-GC390PH IIB - Guardrail (Roadway) - Ramp R0%100%100%
IIBR-GC400PH IIB - Guardrail (Roadway) - Ramp I4- Interstate0%100%100%
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U0%100%100%
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R0%100%100%
IIBR-IDS20PH IIB - Install Drilled Shafts (14-35)45%100%55%
IIBR-IDS30PH IIB - Install Drilled Shafts (36-57)0%100%100%
IIBR-IHM310PH IIB - Install High Mast/Service (4-6)0%100%100%
IIBR-ITS30PH IIB - Install Conduit/Boxes (Univ to JYP)50%100%50%
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)25%100%75%
IIBR-ITS50PH IIB - Install ITS Poles (1-20)0%100%100%
IIBR-ITS60PH IIB - Install ITS Poles (21-41)0%100%100%
IIBR-ITS70PH IIB - Install CCTV's (1-8)0%100%100%
IIBR-ITS80PH IIB - Install CCTV's (9-16)0%100%100%
IIBR-ITS90PH IIB - Install CCTV's (17-22)0%100%100%
IIBR-RES120PH IIB - Remove Existing Sign Structures (2-4)0%100%100%
IIBR-RW120PH IIB - Stabilization - Ramp E0%100%100%
IIBR-RW130PH IIB - Base - Ramp E0%100%100%
IIBR-RW140PH IIB - Stabilization - Ramp C0%100%100%
IIBR-RW150PH IIB - Stabilization - Ramp I-10%100%100%
IIBR-RW160PH IIB - Base - Ramp C0%100%100%
IIBR-RW170PH IIB - Base - Ramp I-10%100%100%
IIBR-RW180PH IIB - Stabilization - Ramp H0%100%100%
IIBR-RW190PH IIB - Base - Ramp H0%100%100%
IIBR-RW200PH IIB - Stabilization - Ramp R-20%100%100%
IIBR-RW210PH IIB - Stabilization - Ramp I4- Interstate0%100%100%
IIBR-RW220PH IIB - Base - Ramp R-20%100%100%
IIBR-RW230PH IIB - Base - Ramp I4- Interstate0%100%100%
IIBR-RW240PH IIB - Stabilization - Ramp L0%100%100%
IIBR-RW250PH IIB - Base - Ramp L0%100%100%
IIBR-RW260PH IIB - Stabilization - Ramp U0%100%100%
IIBR-RW270PH IIB - Base - Ramp U0%100%100%
IIBR-RW290PH IIB - Shoulder Gutter - Ramp C0%100%100%
IIBR-SM380PH IIB - Shoulder Mount Light Pole/Service (I-4 to International) (14 EA)0%100%100%
IIBR-SM390PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)0%100%100%
IIBR-SM400PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)0%100%100%
IIBR-SM410PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (C)0%100%100%
IIBR-SM420PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (14 EA)0%100%100%
IIBR-SM430PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (7 EA)0%100%100%
IIBR-SM440PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (A)35%100%65%
IIBR-SM450PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (19 EA)0%100%100%
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)0%100%100%
IIBR-SM470PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)40%100%60%
IIBR-SM480PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)40%100%60%
IIBR-SM490PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)0%100%100%
IIBR-SP110PH IIB - Drainage - Ramp E0%100%100%
IIBR-SP120PH IIB - Drainage (Temp) - Ramp R-10%100%100%
IIBR-SP130PH IIB - Drainage - Ramp I-10%100%100%
IIBR-SP140PH IIB - Drainage (Temp) - Ramp S-10%100%100%
IIBR-SP150PH IIB - Drainage - Ramp C0%100%100%
IIBR-SP160PH IIB - Drainage (Temp) - Ramp H0%100%100%
IIBR-SP170PH IIB - Drainage (Temp) - Ramp R-20%100%100%
IIBR-SP180PH IIB - Drainage (Temp) - Ramp I4 Interstate0%100%100%
IIBR-SP190PH IIB - Drainage (Temp) - Ramp L0%100%100%
IIBR-SP200PH IIB - Drainage (Temp) - Ramp U0%100%100%
IIBR-SP210PH IIB - Drainage - Ramp D0%100%100%
IIBR-SP240PH IIB - Drainage - Ramp R-10%100%100%
IIBR-SP250PH IIB - Drainage - Ramp R-20%100%100%
IIBR-TC170PH IIB - Temp Striping for New Ramp Alignment - Ramp B0%100%100%
IIBR-TC220PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp E0%100%100%
IIBR-TC230PH IIB - Temp Striping New Ramp Alignment - Ramp E0%100%100%
IIBR-TC250PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp C0%100%100%
IIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C0%100%100%
IIBR-TC280PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I-10%100%100%
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate0%100%100%
IIBR-TC300PH IIB - Temp Striping New Ramp Alignment - Ramp I-10%100%100%
IIBR-TC310PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp H0%100%100%
IIBR-TC320PH IIB - Temp Striping New Ramp Alignment - Ramp H0%100%100%
IIBR-TC330PH IIB - Temp Striping New Ramp Alignment - Ramp R-20%100%100%
IIBR-TC340PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp R-20%100%100%
IIBR-TC360PH IIB - Temp Striping New Ramp Alignment - Ramp I4- Interstate0%100%100%
IIBR-TC370PH IIB - MOT Shift New Ramp Alignment - Ramp I4- Interstate0%100%100%
IIBR-TC380PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp L0%100%100%
IIBR-TC390PH IIB - Temp Striping New Ramp Alignment - Ramp L0%100%100%
IIBR-TC400PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp U0%100%100%
IIBR-TC410PH IIB - Temp Striping New Ramp Alignment - Ramp U0%100%100%
IIBR-TC440PH IIB - Temp Striping New Ramp Alignment - Ramp D0%100%100%
IIBR-TC450PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp D0%100%100%
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E0%100%100%
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-10%100%100%
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-10%100%100%
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20%100%100%
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0%100%100%
IIBR151PH IIB - Construct Ramp L Diversion - Ramp L90%100%10%
IIBR170PH IIB - Construct Ramp U Diversion - Ramp U0%100%100%
IICR-AP100PH IIC - Asphalt - Structural - Ramp S-20%100%100%
IICR-AP120PH IIC - Asphalt - Structural - Ramp M0%100%100%
IICR-EW100PH IIC - Embankment - Ramp S-20%100%100%
IICR-EW120PH IIC - Embankment - Ramp M0%100%100%
IICR-GC100PH IIC - Demo - Ramp S-20%100%100%
IICR-GC110PH IIC - Performance Turf, SOD - Ramp S-20%100%100%
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S0%100%100%
IICR-GC170PH IIC - Demo - Ramp M0%100%100%
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-20%100%100%
IICR-RW100PH IIC - Stabilization - Ramp S-20%100%100%
IICR-RW110PH IIC - Base - Ramp S-20%100%100%
IICR-RW140PH IIC - Base - Ramp M0%100%100%
IICR-RW150PH IIC - Stabilization - Ramp M0%100%100%
IICR-RW330PH IIC - Complete Widening - Ramp E0%100%100%
IICR-RW340PH IIC - Complete Widening - Ramp H0%100%100%
IICR-RW360PH IIC - Complete Widening - Ramp L0%100%100%
IICR-SP100PH IIC - Drainage - Ramp S-20%100%100%
IICR-SP120PH IIC - Drainage - Ramp M0%100%100%
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In0%100%100%
IICR-TC1000PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp M0%100%100%
IICR-TC1020PH IIC - Temp Striping New Ramp Alignment - Ramp M0%100%100%
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E0%100%100%
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O0%100%100%
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0%100%100%
IICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-10%100%100%
IICR-TC160PH IIC - Temp Striping New Ramp Alignment - Ramp S-20%100%100%
IICR-TC170PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp S-20%100%100%
IICR-TC180PH IIC - MOT Shift New Ramp Alignment - Ramp H0%100%100%
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20%100%100%
IICR-TC200PH IIC - MOT Shift New Ramp Alignment - Ramp L0%100%100%
IICR-TC210PH IIC - MOT Shift New Ramp Alignment - Ramp U0%100%100%
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20%100%100%
IICR120PH IIC - Construct Ramp M Diversion - Ramp M0%100%100%
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 3690%100%100%
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)75%100%25%
IIDEBO-ST150PH IID - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST160PH IID - Remove Concrete form for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over JYP)32.99%100%67.01%
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST230PH IID - Set Beams - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST260PH IID - Concrete Slope Pavement - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST270PH IID - Lighting Conduit - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)0%100%100%
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST310PH IID - Pier 2, 3, 4 (F/R/P) ( Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)95%100%5%
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDEBO-ST340PH IID - Curing for End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0%100%100%
IIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-10%100%100%
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)0%100%100%
IIIAR110PH IIIA - Construct Ramp T Diversion - Ramps T0%100%100%
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0%100%100%
IIIAWBO-AP100PH IIIA - Mill & Resurface (sacrificial) - WB Outside Widening Area (SR528)0%100%100%
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)0%100%100%
IIIAWBO-ST111PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST120PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST130PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST140PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST150PH IIIA - Set Beams - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST160PH IIIA - Superstructure Deck - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST170PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST171PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST181PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST19PH IIIA - Production Pile (H Piles) (33-65) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)50%100%50%
IIIAWBO-ST191PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST200PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST201PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST21PH IIIA - Curing for Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST22PH IIIA - Remove Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T32.99%100%67.01%
IIIAWBO-ST230PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIAWBO-ST290PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST31PH IIIA - Production Pile (H Piles) - WB Outside Widening Area (Bridge over John Young PKWY)91%100%9%
IIIAWBO-ST33PH IIIA - Curing of Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIIAWBO-ST330PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST34PH IIIA - Remove Concrete Form for Pier 2, 3, 4(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John32.99%100%67.01%
IIIAWBO-ST340PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST410PH IIIA - Set Beams - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST420PH IIIA - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST520PH IIIA - Superstructure Deck Finish Rebar\Set Screed\ Pour - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST570PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST580PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST590PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST600PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0%100%100%
IIIAWBO-ST690PH IIIA - Pier 2, 3, 4 (F/R/P)(Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)95%100%5%
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIAWBO-ST710PH IIIA - Pier 2, 3, 4 (F/R/P) (Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)95%100%5%
IIIAWBO-TC100PH IIIA - Install Sign & Traffic Control Devices - WB Outside Widening Area0%100%100%
IIIAWBO-TC110PH IIIA - Temp Striping for Phase - WB Outside Widening Area (SR528)0%100%100%
IIIAWBO-TC120PH IIIA - MOT Shift for Phase - WB Outside Widening Area0%100%100%
IIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area0%100%100%
IIIBR-AP110PH IIIB - Asphalt - Structural - Ramp J0%100%100%
IIIBR-AP120PH IIIB - Asphalt - Structural - Ramp V0%100%100%
IIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K0%100%100%
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T0%100%100%
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle0%100%100%
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q0%100%100%
IIIBR-EC20PH IIIB - Erect Cantilevers (4-9)0%100%100%
IIIBR-ET40PH IIIB - Erect Trusses (1-8)0%100%100%
IIIBR-EW100PH IIIB - Embankment - Ramp G0%100%100%
IIIBR-EW110PH IIIB - Embankment - Ramp J0%100%100%
IIIBR-EW120PH IIIB - Embankment - Ramp V0%100%100%
IIIBR-EW130PH IIIB - Embankment - Ramp K0%100%100%
IIIBR-EW140PH IIIB - Embankment - Ramp T75%100%25%
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle0%100%100%
IIIBR-EW160PH IIIB - Embankment - Ramp Q0%100%100%
IIIBR-GC100PH IIIB - Demo - Ramp G0%100%100%
IIIBR-GC140PH IIIB - Demo - Ramp J0%100%100%
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J0%100%100%
IIIBR-GC180PH IIIB - Demo - Ramp V0%100%100%
IIIBR-GC190PH IIIB - Demo - Ramp K0%100%100%
IIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K0%100%100%
IIIBR-GC250PH IIIB - Demo - Ramp P0%100%100%
IIIBR-GC260PH IIIB - Guardrail (Roadway) - Ramp K0%100%100%
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P0%100%100%
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle0%100%100%
IIIBR-GC340PH IIIB - Demo - Ramp Q0%100%100%
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0%100%100%
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0%100%100%
IIIBR-IDS40PH IIIB - Install Drilled Shafts (58-63)0%100%100%
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 160%100%100%
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)0%100%100%
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)0%100%100%
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)50%100%50%
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal0%100%100%
IIIBR-RW100PH IIIB - Stabilization - Ramp G0%100%100%
IIIBR-RW120PH IIIB - Stabilization - Ramp J0%100%100%
IIIBR-RW130PH IIIB - Base - Ramp J0%100%100%
IIIBR-RW140PH IIIB - Stabilization - Ramp V0%100%100%
IIIBR-RW150PH IIIB - Base - Ramp V0%100%100%
IIIBR-RW160PH IIIB - Stabilization - Ramp K0%100%100%
IIIBR-RW170PH IIIB - Base - Ramp K0%100%100%
IIIBR-RW180PH IIIB - Stabilization - Ramp T0%100%100%
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle0%100%100%
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle0%100%100%
IIIBR-RW220PH IIIB - Stabilization - Ramp Q0%100%100%
IIIBR-RW230PH IIIB - Base - Ramp Q0%100%100%
IIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0%100%100%
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0%100%100%
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T0%100%100%
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T0%100%100%
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)0%100%100%
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0%100%100%
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)0%100%100%
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0%100%100%
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)0%100%100%
IIIBR-SM610PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)0%100%100%
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)0%100%100%
IIIBR-SM630PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (D)0%100%100%
IIIBR-SP100PH IIIB - Drainage (Temp) - Ramp G0%100%100%
IIIBR-SP110PH IIIB - Drainage - Ramp J0%100%100%
IIIBR-SP120PH IIIB - Drainage (Temp) - Ramp V0%100%100%
IIIBR-SP130PH IIIB - Drainage (Temp) - Ramp K0%100%100%
IIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T0%100%100%
IIIBR-SP150PH IIIB - Drainage - Ramp P0%100%100%
IIIBR-SP160PH IIIB - Drainage (Temp) - Ramp Q0%100%100%
IIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)0%100%100%
IIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)0%100%100%
IIIBR-TC120PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp G0%100%100%
IIIBR-TC130PH IIIB - Temp Striping New Ramp Alignment - Ramp G0%100%100%
IIIBR-TC160PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp J0%100%100%
IIIBR-TC170PH IIIB - Temp Striping New Ramp Alignment - Ramp J0%100%100%
IIIBR-TC180PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp V0%100%100%
IIIBR-TC190PH IIIB - Temp Striping New Ramp Alignment - Ramp V0%100%100%
IIIBR-TC200PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp K0%100%100%
IIIBR-TC210PH IIIB - Temp Striping New Ramp Alignment - Ramp K0%100%100%
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T0%100%100%
IIIBR-TC250PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp P0%100%100%
IIIBR-TC260PH IIIB - Temp Striping New Ramp Alignment - Ramp P0%100%100%
IIIBR-TC270PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp Q0%100%100%
IIIBR-TC280PH IIIB - Temp Striping New Ramp Alignment - Ramp Q0%100%100%
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0%100%100%
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0%100%100%
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G0%100%100%
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J0%100%100%
IIIBR120PH IIIB - Construct Ramp V Diversion - Ramp V0%100%100%
IIIBR130PH IIIB - Construct Ramp K Diversion/Temp Pavement - Ramp K0%100%100%
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q0%100%100%
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0%100%100%
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive0%100%100%
IIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0%100%100%
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening0%100%100%
IIIBWBO-EW100PH IIIB - Surcharge/ Embankment 1 - WB Outside Widening Area0%100%100%
IIIBWBO-EW101PH IIIB - Surcharge/ Embankment 2 - WB Outside Widening Area0%100%100%
IIIBWBO-EW102PH IIIB - Surcharge/ Embankment 3 - WB Outside Widening Area0%100%100%
IIIBWBO-EW103PH IIIB - Surcharge/ Embankment 4 - WB Outside Widening Area0%100%100%
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area90%100%10%
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area70%100%30%
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area0%100%100%
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening0%100%100%
IIIBWBO-GC100PH IIIB - MISC. Demo - WB Outside Widening Area0%100%100%
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge0%100%100%
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area0%100%100%
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0%100%100%
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area0%100%100%
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area0%100%100%
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area0%100%100%
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area0%100%100%
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening0%100%100%
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area0%100%100%
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)80%100%20%
IIIBWBO-SP110PH IIIB - Drainage (Universal - International) - WB Outside Widening Area (SR528)0%100%100%
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)0%100%100%
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)0%100%100%
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)0%100%100%
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)0%100%100%
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)0%100%100%
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)0%100%100%
IIIBWBO-ST10PH IIIB - Production Pile - WB Outside Widening Area (Bridge over universal BLVD)40%100%60%
IIIBWBO-ST100PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over Universal BLVD)0%100%100%
IIIBWBO-ST11PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)0%100%100%
IIIBWBO-ST12PH IIIB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)0%100%100%
IIIBWBO-ST120PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST13PH IIIB - Removal for Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Uni0%100%100%
IIIBWBO-ST130PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST14PH IIIB - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST180PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)0%100%100%
IIIBWBO-ST220PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST240PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST260PH IIIB - Wall Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST28PH IIIB - Rip Rap Under Bridge - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST300PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST320PH IIIB - Curing for Pier 2, 3, (Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST330PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST340PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Universal BLVD)0%100%100%
IIIBWBO-ST350PH IIIB - Superstructure Deck SIB & Start Rebar - WB Outside Widening (Area Bridge over Universal BLVD)0%100%100%
IIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl0%100%100%
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)0%100%100%
IIIBWBO-ST390PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over International Drive)0%100%100%
IIIBWBO-ST4PH IIIB - Production Pile - WB Outside Widening Area (Bridge over International DR)41%100%59%
IIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST460PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST470PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST480PH IIIB - End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST490PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST5PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over International DR)80%100%20%
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST520PH IIIB - Curing for End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST530PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST540PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST631PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-ST640PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST690PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over International Drive)0%100%100%
IIIBWBO-ST7PH IIIB - Test Pile - WB Outside Widening Area (Bridge over universal BLVD)30%100%70%
IIIBWBO-ST700PH IIIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - WB Outside Widening Area (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)0%100%100%
IIIBWBO-ST8PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over universal BLVD)0%100%100%
IIIBWBO-TC110PH IIIB - Set Temp Traffic Barriers - WB Outside Widening Area0%100%100%
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area0%100%100%
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive0%100%100%
IIIBWBO-W101PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over Universal BLVD)0%100%100%
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0%100%100%
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)0%100%100%
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive0%100%100%
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman0%100%100%
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive0%100%100%
IIIC-CP10PH IIIC - Construct Ped. Signalization at Ramps G&F0%100%100%
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F0%100%100%
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N0%100%100%
IIICR-EW100PH IIIC - Embankment - Ramp F10%100%90%
IIICR-EW110PH IIIC - Embankment - Ramp N0%100%100%
IIICR-GC110PH IIIC - Demo - Ramp N0%100%100%
IIICR-GC160PH IIIC - Guardrail (Roadway) - Ramp N0%100%100%
IIICR-RW100PH IIIC - Stabilization - Ramp F0%100%100%
IIICR-RW110PH IIIC - Base - Ramp F0%100%100%
IIICR-RW120PH IIIC - Stabilization - Ramp N0%100%100%
IIICR-RW130PH IIIC - Base - Ramp N0%100%100%
IIICR-SP100PH IIIC - Drainage - Ramp F0%100%100%
IIICR-SP110PH IIIC - Drainage - Ramp N0%100%100%
IIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F0%100%100%
IIICR-TC140PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp N0%100%100%
IIICR-TC150PH IIIC - Temp Striping New Ramp Alignment - Ramp N0%100%100%
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F0%100%100%
IIICR110PH IIIC - Construct Ramp N Diversion - Ramp N0%100%100%
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J0%100%100%
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N0%100%100%
IIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K0%100%100%
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0%100%100%
IIICWBO-ST100PH IIIA - Demo Bridge - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
IIICWBO-ST220PH IIIA - Demo Bridge Deck - WB Outside Widening Area (Bridge over John Young PKWY)0%100%100%
ITS10-1000Issue Identification0%100%100%
ITS10-1010NOI submitted - Potential Delay to Project Schedule0%100%100%
ITS10-1020Plan Revision 10 Officially transmitted0%100%100%
ITS10-1030Plan Revision 10 - Review and Procurement0%100%100%
ITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings0%100%100%
ITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings0%100%100%
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express0%100%100%
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)0%100%100%
IVEBM-TC100PH IV - Shift EB traffic to outside I-Drive through Station 3120%100%100%
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0%100%100%
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 3110%100%100%
IVEBM-W180PH IV - Median Wall - FFP Stem - Station 259+50 to 3110%100%100%
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 3110%100%100%
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3320%100%100%
IVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 3320%100%100%
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520%100%100%
IVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 3520%100%100%
IVEBO-SS100PH IV - Install OT Structures - East of JYP0%100%100%
IVR-ET50PH IV - Erect Trusses (9-17)0%100%100%
IVR-ET60PH IV - Erect Trusses (18-24)0%100%100%
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express0%100%100%
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express0%100%100%
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express0%100%100%
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express0%100%100%
IVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express0%100%100%
IVWBM-RW240PH IV - Stabilization - Station 259+50 to 311 EB Express0%100%100%
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express0%100%100%
IVWBM-SP100PH IV - Drainage - Median Widening (East of 311)0%100%100%
PRE-FA-001Fabricate and Deliver 506 Bridge Drainage System0%100%100%
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)95%100%5%
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)95%100%5%
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)95%100%5%
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)95%100%5%
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems95%100%5%
PRE-FA-016Fabricate and Deliver 641 Prestressed Concrete Poles50%100%50%
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles0%100%100%
PRE-FA-018Fabricate and Deliver 650 Traffic Signals0%100%100%
PRE-FA-019Fabricate and Deliver 700 Highway Signing (Single, Multi, Panel, and Overhead)0%100%100%
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting0%100%100%
PRE-FA-021Fabricate and Deliver 05500 Metal Fabrications0%100%100%
PRE-FA-022Fabricate and Deliver 133420 Pre-Engineered Precast Concrete Structure0%100%100%
PRE-FA-023Fabricate and Deliver 263213 Engine Generator0%100%100%
PRE-FA-024Fabricate and Deliver 633 Communication Cable50%100%50%
PRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes75%100%25%
PRE-FA-026Fabricate and Deliver 653 Pedestrian Signals0%100%100%
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems0%100%100%
PRE-FA-028Fabricate and Deliver 665 Pedestrian Detector0%100%100%
PRE-FA-029Fabricate and Deliver 033000 Cast-In-Place Concrete0%100%100%
PRE-FA-030Fabricate and Deliver 042200 Masonry0%100%100%
PRE-FA-031Fabricate and Deliver 081100 Metal Doors and Frames0%100%100%
PRE-FA-032Fabricate and Deliver 099100 Painting Product Data and Sample0%100%100%
PRE-FA-033Fabricate and Deliver 101400 Signage0%100%100%
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping0%100%100%
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping0%100%100%
PRE-FA-036Fabricate and Deliver 232000 Piping and Specialties0%100%100%
PRE-FA-037Fabricate and Deliver 233113 Ductwork Product Data and Shop Drawing0%100%100%
PRE-FA-038Fabricate and Deliver 238119 Packaged Air Conditioners0%100%100%
PRE-FA-039Fabricate and Deliver 260536 Cable Trays0%100%100%
PRE-FA-040Fabricate and Deliver 264113 Lighting Protection System Product Data and Shop Drawing0%100%100%
PRE-FA-041Fabricate and Deliver 682 CCTV Camera50%100%50%
PRE-FA-042Fabricate and Deliver 781 DMS0%100%100%
PRE-FA-044Fabricate and (Ready to) Deliver 783 ITS Fiber Optic Cable50%100%50%
PRE-FA-045Fabricate and Deliver 786 ITS Vehicle Detection System50%100%50%
PRE-FA-046Fabricate and Deliver 784 ITS Managed Ethernet Hub Switch50%100%50%
PRE-FA-047Fabricate and Deliver 685 ITS Uninterruptible Power Source (UPS)50%100%50%
PRE-FA-049Fabricate and Deliver 262913 ITS Standby Generator Product Data and Shop Drawing50%100%50%
PRE-PS-001Prepare and Submit 506 Bridge Drainage System75%100%25%
PRE-PS-006Prepare and Submit Precast Erection75%100%25%
PRE-PS-017Prepare and Submit 646 Aluminum Pedestal Poles0%100%100%
PRE-PS-018Prepare and Submit 650 Traffic Signals50%100%50%
PRE-PS-019Prepare and Submit 700 Highway Signing (Single, Multi, Panel, and Overhead)85%100%15%
PRE-PS-020Prepare and Submit 992 Under deck Lighting0%100%100%
PRE-PS-022Prepare and Submit 133420 Pre-Engineered Precast Concrete Structure75%100%25%
PRE-PS-023Prepare and Submit 263213 Engine Generator0%100%100%
PRE-PS-026Prepare and Submit 653 Pedestrian Signals0%100%100%
PRE-PS-027Prepare and Submit 663 Signal Priority and Preemption Systems85%100%15%
PRE-PS-028Prepare and Submit 665 Pedestrian Detector0%100%100%
PRE-PS-029Prepare and Submit 033000 Cast-In-Place Concrete0%100%100%
PRE-PS-030Prepare and Submit 042200 Masonry0%100%100%
PRE-PS-031Prepare and Submit 081100 Metal Doors and Frames0%100%100%
PRE-PS-032Prepare and Submit 099100 Painting Product Data and Sample0%100%100%
PRE-PS-033Prepare and Submit 101400 Signage0%100%100%
PRE-PS-034Prepare and Submit 231113 Fuel Oil Piping0%100%100%
PRE-PS-035Prepare and Submit 231323 Aboveground Diesel Storage Tank and Piping0%100%100%
PRE-PS-036Prepare and Submit 232000 Piping and Specialties0%100%100%
PRE-PS-037Prepare and Submit 233113 Ductwork Product Data and Shop Drawing0%100%100%
PRE-PS-038Prepare and Submit 238119 Packaged Air Conditioners0%100%100%
PRE-PS-039Prepare and Submit 260536 Cable Trays0%100%100%
PRE-PS-040Prepare and Submit 264113 Lighting Protection System Product Data and Shop Drawing0%100%100%
PRE-RA-001Review and Approve 506 Bridge Drainage System0%100%100%
PRE-RA-017Review and Approve 646 Aluminum Pedestal Poles0%100%100%
PRE-RA-018Review and Approve 650 Traffic Signals0%100%100%
PRE-RA-019Review and Approve 700 Highway Signing (Single, Multi, Panel, and Overhead)90%100%10%
PRE-RA-020Review and Approve 992 Under deck Lighting0%100%100%
PRE-RA-021Review and Approve 05500 Metal Fabrications90%100%10%
PRE-RA-022Review and Approve 133420 Pre-Engineered Precast Concrete Structure0%100%100%
PRE-RA-023Review and Approve 263213 Engine Generator0%100%100%
PRE-RA-026Review and Approve 653 Pedestrian Signals0%100%100%
PRE-RA-027Review and Approve 663 Signal Priority and Preemption Systems40%100%60%
PRE-RA-028Review and Approve 665 Pedestrian Detector0%100%100%
PRE-RA-029Review and Approve 033000 Cast-In-Place Concrete0%100%100%
PRE-RA-030Review and Approve 042200 Masonry0%100%100%
PRE-RA-031Review and Approve 081100 Metal Doors and Frames0%100%100%
PRE-RA-032Review and Approve 099100 Painting Product Data and Sample0%100%100%
PRE-RA-033Review and Approve 101400 Signage0%100%100%
PRE-RA-034Review and Approve 231113 Fuel Oil Piping0%100%100%
PRE-RA-035Review and Approve 231323 Aboveground Diesel Storage Tank and Piping0%100%100%
PRE-RA-036Review and Approve 232000 Piping and Specialties0%100%100%
PRE-RA-037Review and Approve 233113 Ductwork Product Data and Shop Drawing0%100%100%
PRE-RA-038Review and Approve 238119 Packaged Air Conditioners0%100%100%
PRE-RA-039Review and Approve 260536 Cable Trays0%100%100%
PRE-RA-040Review and Approve 264113 Lighting Protection System Product Data and Shop Drawing0%100%100%
PRE-RA-042Review and Approve 781 DMS90%100%10%
TF-CO-001Foundation (FRP SOG)0%100%100%
TF-CO-002Install Upright 1 D.S.0%100%100%
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)0%100%100%
TF-CO-004Precast Erection0%100%100%
TF-CO-005Install Upright 2 D.S.0%100%100%
TF-CO-006FRP Conc. Roof Dec/c0%100%100%
TF-CO-007Install Upright 3 D.S.0%100%100%
TF-CO-008Constr. Pedestal0%100%100%
TF-CO-009Const. Roof System0%100%100%
TF-CO-010FRP Conc. Pad (Generator)0%100%100%
TF-CO-011AS Build D.S.0%100%100%
TF-CO-012Install Frames & Doors0%100%100%
TF-CO-013Const. Screen Wall (Con.)0%100%100%
TF-CO-014Pull Wire & Install Light Fixtures0%100%100%
TF-CO-015Install HVAC0%100%100%
TF-CO-016F+1 Generator0%100%100%
TF-CO-017F+1 Fuel Tank0%100%100%
TF-CO-018Install Lighting0%100%100%
TF-CO-019Install Security System0%100%100%
TF-CO-020Install Lightning Protection0%100%100%
TF-CO-022Construct Sidewalk0%100%100%
TF-CO-023Erect Truss0%100%100%
TF-CO-024Wall Treatments (Ply)0%100%100%
TF-CO-025Install Equip. Arm Supports0%100%100%
TF-CO-027Cont. HVAC0%100%100%
TF-FA-001Fabricate and Deliver Precast Erection0%100%100%
TF-RA-001Review and Approve Precast Erection0%100%100%
USDED-CO-002Duke Energy Distribution (B)50%100%50%
IAWBO-EW100PH IA - Pond EXCAVATION (Shape 4A & 5A) - WB Outside Widening Area100%99%-1%
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M0%98.02%98.02%
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E0%97.92%97.92%
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)0%96%96%
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)0%96%96%
IBWBO-EW100PH IB - Pond Excav/Embank JYP to TPK - WB Outside Widening92%95%3%
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp C0%95%95%
IICR-RW350PH IIC - Complete Widening - Ramp I-10%95%95%
IIIBR-RW110PH IIIB - Base - Ramp G0%95%95%
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)0%90%90%
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-10%90%90%
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)0%90%90%
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)0%90%90%
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)0%90%90%
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware0%90%90%
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)0%90%90%
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening0%88.01%88.01%
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)0%85%85%
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0%85%85%
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V0%83.33%83.33%
IIBR-RW320PH IIB - Stabilization - Ramp D0%80%80%
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0%80%80%
IVR-EC30PH IV - Erect Cantilevers (10-15)0%80%80%
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)0%75%75%
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)0%75%75%
IIIBR-RW190PH IIIB - Base - Ramp T0%75%75%
IIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G0%75%75%
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0%75%75%
TF-CO-026Cont. Lightning0%75%75%
TF-CO-029Install Conduit/Raceways0%75%75%
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G0%70%70%
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area0%70%70%
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)0%60%60%
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)0%60%60%
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)0%60%60%
IIBR-SP100PH IIB - Drainage - Ramp B0%50%50%
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)0%50%50%
IIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)0%50%50%
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)0%50%50%
IVWBM-TC100PH IV - Set Temp Traffic Barriers - WB Median Widening0%50%50%
TF-CO-031Toll Facility Finishes and Punchlist0%50%50%
IVWBM-GC100PH IV - Demo Temporary - WB Express0%30%30%
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B0%25%25%
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)0%25%25%
TF-CO-030Pull Wire0%25%25%
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 3320%20%20%

The following issues were found:

IAWBO-EW100
Activity completion decreased from 100% to 99% since last schedule update

This table represents activities added since E8P02 Update No. 11

Activity IDActivity DescriptionOriginal Duration
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)5
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F15
IIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G12
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J12
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N15
IIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K12
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P15
IIICR180PH IIIC - Remove Diversion - Ramp T2
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q12
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V12
GC-GCN220Written Suspend order - FOC related to pending change50
IVR-SM710PH IV - Allow for TEC Install and Test21
IIBR-SP240PH IIB - Drainage - Ramp R-17
IIBR-SP250PH IIB - Drainage - Ramp R-24
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-210
IICR-RW330PH IIC - Complete Widening - Ramp E8
IICR-RW340PH IIC - Complete Widening - Ramp H8
IICR-RW350PH IIC - Complete Widening - Ramp I-18
IICR-RW360PH IIC - Complete Widening - Ramp L8
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In15
ITS10-1000Issue Identification0
ITS10-1010NOI submitted - Potential Delay to Project Schedule0
ITS10-1020Plan Revision 10 Officially transmitted0
ITS10-1030Plan Revision 10 - Review and Procurement14
ITS10-1040Fabrication and Delivery - Conduits40
ITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings7
ITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings45
ITS10-1070Fabrication & Delivery - ITS Standby Generators55
ITS10-1080Furnish & Install ITS Standby Generators19
ITS10-1090Furnish & Install - Conduit40
ITS10-1100ITS Generator Stand AloneTesting19
ITS10-1110Fabrication and Delivery - Conductors20
ITS10-1120Modify existing cabinets to incorporate additional conduit3
ITS10-1130Furnish & Install - Conductors26
ITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers15
ITS10-1150Furnish & Install - Step Up / Step Down Transformers12
ITS10-1160Furnish & Install - FOC Drops26
ITS10-1170Splice / Terminate FOC Drops12
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3322
IVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 33210
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 3325
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3524
IVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 35212
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 3525
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V8
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)3
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)2
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive1
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside10
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)2
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)10
IIIBR-GC390PH IIIB - Guardrail - Median Widening STA 2030+00 to STA 217+002
IIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T2
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 1625
IIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)20
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)6
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T8
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T5
IIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)15
IIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)15
IIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)15
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P1
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge1
IIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive2
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express4
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express4
IVEBM-PM110PH IV - Tubular Delineators - EB Express Divider8
IVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening5
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P8
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP6
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express6
IVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express4
IVWBM-PM110PH IV - Tubular Delineators - WB Express Divider8
IVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening5
IVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express2
IVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express2
IVWBM-RW300PH IV - Base - Station 311 to 332 EB Express5
IVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express2
IVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express2
IVWBM-RW320PH IV - Base - Station 335 to 352 EB Express5
IVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express2
IVWBM-RW340PH IV - Base - Station 311 to 332 WB Express5
IVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express2
IVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express2
IVWBM-RW370PH IV - Base - Station 335 to 352 WB Express5
IVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express2
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-45
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)8
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3204
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3324
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)3
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)8
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)8
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)10
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)3
IIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)8
IIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)6
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 36922
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB2
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive10
IIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)10
IIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)10
IIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)10
IIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)10
IIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)6
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening2
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening15
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening4
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area4
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)10
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)3
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)4
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)5
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)5
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)5

This table represents activities deleted since E8P02 Update No. 11

Activity IDActivity Description
IIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F
IIIBR-SM580PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (B)
PRE-PS-043Prepare and Submit 782 ITS CCTV Camera
PRE-PS-048Prepare and Submit 785 ITS Infrastructure
PRE-FA-048Fabricate and Deliver 785 ITS Infrastructure
PRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera
PRE-RA-048Review and Approve 785 ITS Infrastructure
PRE-RA-043Review and Approve 782 ITS CCTV Camera
IIIBR-TC220PH IIIB - Set Temp Traffic Barriers (Shoulder) - RampT

The following predecessor relationships were added since E8P02 Update No. 11.

Legend

Logic tie related to activities added since previous update

Activity IDActivity DescriptionLagRelationship TypePredecessor Activity ID
GC-GCN220Written Suspend order - FOC related to pending change0FSITS10-1000
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)0FSIBEBM-RW290
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)0FSIBEBM-RW300
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive0FSIIBEBO-AP110
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)0FSIIBEBO-RW150
IIBEBO-ST580
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3200FSIIBEBO-RW140
IIBEBO-RW160
IIBEBO-SP120
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIIBEBO-RW180
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0FSIIBEB-TC110
IIBEBO-AP110
IIBEBO-GC110
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)0FSIBEBM-AP120
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)0FSIIBEBO-RW170
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)0FSIIBEBO-EW100
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)0FSIIBEBO-EW101
IIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)0FSIIBEBO-EW101
IIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)0FSGC-GCN140
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside0FSIIIBWBO-W110
IIBR-SP240PH IIB - Drainage - Ramp R-10FSIIBR-EW130
IIBR-SP250PH IIB - Drainage - Ramp R-20FSIIBR-EW170
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-20FSIICR-GC100
IICR-RW330PH IIC - Complete Widening - Ramp E0FSIIBR-AP110
IICR-TC120
IICR-RW340PH IIC - Complete Widening - Ramp H0FSIIBR-AP140
IICR-TC180
IICR-RW350PH IIC - Complete Widening - Ramp I-10FSIICR-TC150
IICR-RW360PH IIC - Complete Widening - Ramp L0FSIICR-TC200
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In0FSIIBEBO-AP140
IIBEBO-ST620
IICR-TC130
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 3690FSIIBEBO-W150
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0FSIBEBM-RW330
IBEBM-TC220
IBWBM-RW230
IIIAR100
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIBEBO-AP145
IIBR-AP120
IIBR-TC430
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW240
IIIBR-RW250
IIIBR-GC390PH IIIB - Guardrail - Median Widening STA 2030+00 to STA 217+000FSIIIBWBO-AP110
IIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T0FSIIIBR-AP140
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 160SSIVEBO-SS100
IIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)0FSGC-GCN220
IIIBR-ITS90
IIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)0FSIIIBR-ITS1030
IIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)0FSIIIBR-ITS1040
IIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)0FSIIIBR-ITS1050
IIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW250
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC370
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T0FSIIIBR-RW270
IIIBWBO-SP170
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T0FSIIIBR-GC210
IIICR170
IIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)0FSIIIAWBO-SP100
IIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)0FSIIIBR-SP170
IIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)0FSIIIBR-SP180
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIAWBO-ST211
IIIBR-GC300
IIIBR-GC320
IIIBWBO-AP100
IIIBWBO-ST150
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIIIBR-GC400
IIIBR-TC230
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0FSIIBEBO-AP145
IIBR-SM460
IIIBR-SM550
IIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC380
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening0FSIIIBWBO-RW150
IIIBWBO-RW180
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening0FSGC-GCN170
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening0FSIIBEBO-W160
IIIBWBO-W110
IIIBWBO-W140
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area0FSIIIBWBO-RW170
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)0FSIIIBWBO-EW110
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)0FSIIIBWBO-EW110
IIIBWBO-RW100
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)0FSIIIBWBO-EW120
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)0FSIIIBWBO-RW110
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)0FSIIBR-EHM370
IIIBR-RW270
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)0FSIIIBWBO-ST26
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive0FSIIIBWBO-W130
IIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive0FSIIICR-TC130
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F0FSIIICR-AP100
IIICR-AP120
IIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G0FSIIIBR-AP100
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J0FSIIIBR-AP110
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N0FSIIICR-AP110
IIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K0FSIIIBR-AP130
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0FSIIIBR-AP150
IIIBR-TC290
IIIBWBO-ST150
IIICR180PH IIIC - Remove Diversion - Ramp T0FSIIIBR-TC230
IIIBR-TC300
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0FSIIIBR-AP160
IIIBR-GC350
IIIBR-GC360
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V0FSIIIBR-AP120
ITS10-1000Issue Identification0FSGC-DP100
ITS10-1010NOI submitted - Potential Delay to Project Schedule0FSITS10-1000
ITS10-1020Plan Revision 10 Officially transmitted0FSGC-GCN220
ITS10-1010
ITS10-1030Plan Revision 10 - Review and Procurement0FSITS10-1020
ITS10-1040Fabrication and Delivery - Conduits0FSITS10-1030
ITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings0FSITS10-1020
ITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings0FSITS10-1050
ITS10-1070Fabrication & Delivery - ITS Standby Generators0FSITS10-1060
ITS10-1080Furnish & Install ITS Standby Generators0FSITS10-1070
ITS10-1090Furnish & Install - Conduit0FSITS10-1040
ITS10-1100ITS Generator Stand AloneTesting0FSITS10-1080
ITS10-1110Fabrication and Delivery - Conductors0FSITS10-1030
ITS10-1120Modify existing cabinets to incorporate additional conduit0FSITS10-1090
ITS10-1130Furnish & Install - Conductors0FSITS10-1110
ITS10-1120
ITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers0FSITS10-1030
ITS10-1150Furnish & Install - Step Up / Step Down Transformers0FSITS10-1130
ITS10-1140
ITS10-1160Furnish & Install - FOC Drops0FSITS10-1090
ITS10-1170Splice / Terminate FOC Drops0FSITS10-1160
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express0FSIVWBM-RW250
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express0FSIVWBM-RW300
IVWBM-RW320
IVEBM-PM110PH IV - Tubular Delineators - EB Express Divider0FSIVEBO-AP120
IVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening0FSIVEBM-PM110
IVEBO-AP120
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3320FSIVEBM-TC120
IVWBM-RW290
IVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 3320FSIVEBM-W230
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 3320FSIVEBM-W240
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIIIBR-TC300
IVEBM-TC120
IVEBM-W230
IVWBM-RW310
IVWBM-RW360
IVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 3520FSIVEBM-W260
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 3520FSIVEBM-W270
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIAR-GC100
IIBR-GC210
IIBR-GC320
IIBR-GC330
IIBR-GC370
IIBR-GC470
IICR-GC180
IICR-RW350
IIIBR-CP10
IIIBR-CP170
IIIBR-GC110
IIIBR-GC150
IIIBR-GC220
IIIBR-GC350
IIIBR-GC390
IIICR-GC100
IIICR-GC120
IIICR-GC130
IIICR120
IIICR150
IIICR170
IIICR180
IIICR190
IVR-IPM100
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP3FFIIBEBM-GC110
IIIBWBM-GC110
IVEBM-AP100
IVEBM-AP110
IVEBM-AP120
IVEBM-TC110
IVR-ET50
IVR-ET60
IVWBO-AP100
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIBR-GC460
IICR-GC110
IIIAWBO-ST211
IIIBR-GC200
IIIBR-GC280
IIIBR-SM640
IIICR180
IIICR200
IVEBO-SS100
IVR-SM710PH IV - Allow for TEC Install and Test0FSIVEBM-AP110
IVWBM-AP110
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express0FSIVWBM-RW170
IVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express0FSIVWBM-RW340
IVWBM-RW370
IVWBM-PM110PH IV - Tubular Delineators - WB Express Divider0FSIVWBO-AP110
IVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening10FSIVWBO-AP110
IVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express0FSIVEBM-TC120
IVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express0FSIVWBM-RW285
IVWBM-RW300PH IV - Base - Station 311 to 332 EB Express0FSIVEBM-W250
IVWBM-RW290
IVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express0FSIVEBM-TC120
IVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express0FSIVWBM-RW305
IVWBM-RW320PH IV - Base - Station 335 to 352 EB Express0FSIVEBM-W280
IVWBM-RW310
IVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express0FSIVWBM-RW350
IVWBM-RW340PH IV - Base - Station 311 to 332 WB Express0FSIVWBM-RW330
IVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express0FSIIIBR-TC300
IVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express0FSIVWBM-RW380
IVWBM-RW370PH IV - Base - Station 335 to 352 WB Express0FSIVEBM-W280
IVWBM-RW360
IVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express0FSIIIBR-TC300
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FSIVWBM-AP100
IVWBM-AP110
IVWBM-AP130
IVWBM-TC110
GC-GC110PH MS - Substantial Completion0FSIVEBM-PM120
IVR-SM710
IVWBM-PM130
NA-GC100
GC-GCN140PH MS - Start Phase II B Construction0FSIBEBM-AP100
GC-GCN160PH MS - Start Phase IV Construction0FSIBWBO-SP160
IBWBO-SP190
IICR-RW340
IICR-RW360
IICR-TC140
GC-GCN170PH MS - Start Phase III B Construction0FSIIBEBO-SP160
GC-GCN210PH MS - Punch List/Acceptance0FSIVEBO-AP100
IVEBO-AP110
IVEBO-AP120
IVML-AP130
IVWBM-PM110
IVWBO-AP100
IVWBO-AP110
NA-GC110
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening0FSIBEBM-RW310
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0FSIBEBM-TC110
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-TC130
IBEBM-TC210
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSIIBEBO-AP140
IIBEBO-ST620
IICR-SP130
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)0FSIIBR-EW140
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)0FSIIAR-TC120
IIBR-TC160
IIBEBM-GC110PH IV - Rumble Strips - EB Median0FSIVEBM-AP120
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)0FSIIBEBO-RW120
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening0FSIIBEBO-AP120
IIBEBO-AP140
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening0FSIBEBM-AP100
IIBEBO-SP100
IIBEBO-SP130
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0FSIBEBM-AP110
IIBEBO-SP140
IIBEBO-SP150
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)0FSIBEBM-AP120
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0FSIIBEBO-RW112
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)0FSGC-GCN120
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSGC-GCN120
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST240
IIBEBO-ST300
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST4
IIBEBO-W120
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST4
IIBEBO-W110
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)0FSIIBEBO-W120
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST32
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)0FSIIBEBO-W130
IIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST160
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive0FSIIBEBO-W100
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FSIIBEBO-EW101
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)0FSIIBEBO-ST510
IICR-GC120
PRE-FA-015
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C0FSIIIBWBO-RW160
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I0FSUSDED-CO-001
IIBR-GC150PH IIB - Demo - Ramp S-10FSGC-GCN110
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-10FFIICR-RW350
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U0FSIIBR-GC450
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R0FSGC-GCN140
IIBR-ITS50PH IIB - Install ITS Poles (1-20)0FSIIIBR-ITS1010
IIBR-RW200PH IIB - Stabilization - Ramp R-20FSIIBR-SP240
IIBR-SP250
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)0FSIIBEBO-W150
IIDEBO-ST280
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E0FSGC-GCN120
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-10FSGC-GCN120
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-10FSGC-GCN120
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSGC-GCN120
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0FSGC-GCN120
IICR-RW110PH IIC - Base - Ramp S-20FSIICR-GC190
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O0FSIIBEBO-AP140
IIBEBO-ST620
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0FSIIBR-AP120
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20FSGC-GCN120
IICR-TC190
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST100
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)0FSGC-GCN140
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST200
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST220
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST130
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST320
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)0FSIICR-GC120
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST190
IIDEBO-ST210
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)0FSGC-GCN120
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0FSGC-GCN120
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSIIIBWBO-ST150
IIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area0FSIIBR-GC340
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T0FSIIIBR-RW260
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle0FSIIIBR-GC250
IIIBR-GC210PH III C - Demo - old temp Ramp T gore0FSIIIBR-GC280
IIIBR-TC290
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)0FSIIBR-ITS40
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)0FSGC-GCN220
IIIBR-ITS1020
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)0FSIIIBR-ITS90
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)0FSIIIBR-ITS90
IIIBR-ITS1020
IIIBR-ITS190PH IIIB - Splice/Terminate FOC0FSIIIBR-ITS140
IIIBR-ITS150
IIIBR-ITS1060
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)0FSGC-GCN120
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS1000
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle0FSIIIBR-SP150
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle0FSIIIBWBO-RW140
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)0SSIIIBR-SM570
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)0FSIIIBWBO-EW110
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0FSIIIBR-SM620
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0FSIIIBWBO-EW110
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)0SSIIIBWBO-EW110
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0FSIIIBR-SM570
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)0FSIIIBWBO-EW110
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T0FSIIIBR-AP140
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G0FSGC-GCN120
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J0FSGC-GCN120
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q0FSGC-GCN140
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive0FSIIIBWBO-RW140
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area4FFIIIBWBO-SP100
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area0FSIBWBM-TC150
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSIIIBWBO-EW140
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge0FSIIIBWBO-AP120
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area0FSGC-GCN170
IIBEBO-AP130
IIBEBO-AP140
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0FFGC-GCN170
IIBEBO-AP120
IIIBWBO-SP150
IIIBWBO-ST490
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area0FSIIIBWBO-EW130
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area1FFIIIBWBO-SP140
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area0FFIIIBWBO-RW110
IIIBWBO-SP160
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area0FSIIIBWBO-RW120
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)0FSGC-GCN120
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)0FSIIIBWBO-SP130
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)0FSIIBEBO-ST390
IICR-RW330
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)0FSIBEBM-TC220
IIIAR120
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)0FSIIIBWBO-ST250
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST310
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST310
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST2
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST26
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)0FSIIIBWBO-ST211
IIIBWBO-ST280
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST250
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST26
IIIBWBO-ST750
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area0FSIBWBM-AP100
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIICR-RW330
IIIBR-RES130
IIIBWB-TC100
IIIBWBO-SP120
IIIBWBO-W100
IIIBWBO-W111
IIIBWBO-W130
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-W130
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman0FSIIIBWB-TC100
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N0FSIICR-AP120
IIICR-GC100PH IIIC - Demo - Old Ramp F0FSIVWBO-TC100
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F0FSIIICR-AP100
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F0FSGC-GCN120
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express0FSIIIBR-SP190
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)0FSIVWBM-GC100
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIIBR-SM500
IIDEBO-RW150
IIIBR-IDS50
IVEBO-TC100
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 2170FSIVWBM-RW180
IVWBM-RW210
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 3110FSIVEBM-GC100
IVEBM-SP100
IVWBM-RW160
IVWBM-RW240
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+503SSIVEBM-GC100
IVEBM-SP100
IVWBM-RW270
IVWBO-TC100
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIIBR-EHM370
IIDEBO-ST290
IIIBWBO-GC110
IVEBO-AP110
IVR-SM670
IVR-SM680
IVR-SM690
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening0FSIIBR-IB10
IVR-ET60PH IV - Erect Trusses (18-24)0FSIIIBR-IDS50
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)0FSPRE-FA-020
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)0FSPRE-FA-020
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)0FSPRE-FA-020
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)0FSPRE-FA-020
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express3SSIVWBM-SP100
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express0FSIVWBM-GC100
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express0FSIVEBM-W190
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express0FSIVEBM-W160
IVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express0FSIVEBM-GC100
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express0FSIVEBM-W190
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express0FSIVEBM-GC100
IVWBO-TC100
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express0FSIVEBM-W220
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIBR-AP110
IBR-GC110
IIAR-TC120
IIAR-TC130
IIBR-AP120
IIBR-GC200
IIBR-TC420
IIIAWBO-ST211
IIIAWBO-ST620
IIIBWBO-ST150
IIIBWBO-ST510
IIIBWBO-ST550
IIICR120
IIICR130
IIICR140
IIICR150
IIICR160
IIICR190
IIICR200
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBR-SM510
IIIBR-SM520
IIIBR-SM540
IIIBR-SM560
IIIBR-SM590
IIIBWBO-AP120
IIIBWBO-GC110
IIIBWBO-GC120
IIICR-AP120
IIICR-GC140
IIICR-TC130
IIICR150
NA-GC100TEC Install and Test0FSIVEBM-AP100
IVWBM-AP100
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSITS10-1100
ITS10-1150
ITS10-1170
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)0FSIIBEBO-EW112
TF-CO-017F+1 Fuel Tank0FSPRE-FA-034

The following predecessor relationships were deleted since E8P02 Update No. 11.

Legend

Logic tie related to activities added since previous update

Activity IDActivity DescriptionLagRelationship TypePredecessor Activity ID
IIIBR-SM580PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (B)0FSIIIBR-SM570
IIIBR-TC220PH IIIB - Set Temp Traffic Barriers (Shoulder) - RampT0FSGC-GCN170
IIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F0FSIIIBR-AP100
IIICR-AP100
PRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera0FSPRE-RA-043
PRE-FA-048Fabricate and Deliver 785 ITS Infrastructure0FSPRE-RA-048
PRE-PS-043Prepare and Submit 782 ITS CCTV Camera0FSGC-GC100
PRE-PS-048Prepare and Submit 785 ITS Infrastructure0FSGC-GC100
PRE-RA-043Review and Approve 782 ITS CCTV Camera0FSPRE-PS-043
PRE-RA-048Review and Approve 785 ITS Infrastructure0FSPRE-PS-048
GC-GC110PH MS - Substantial Completion0FSIIIBWBO-RW140
GC-GCN140PH MS - Start Phase IIB Construction0FSIBEBM-TC130
IBWBM-RW230
IBWBO-SP160
IBWBO-SP190
USDED-CO-001
GC-GCN160PH MS - Start Phase IV Construction0FSIIAR-GC100
IIBEBM-GC110
IIBEBO-GC110
IIBR-SM500
IIDEBO-ST290
IIIAWBO-ST211
IIIAWBO-ST620
IIIBR-AP130
IIIBR-AP160
IIIBR-CP10
IIIBR-CP170
IIIBR-GC110
IIIBR-GC150
IIIBR-GC200
IIIBR-GC220
IIIBR-GC350
IIIBR-IHM330
IIIBWBM-GC110
IIIBWBO-GC110
IIIBWBO-ST150
IIIBWBO-ST510
IIIBWBO-ST550
IIIC-AP170
IIICR-GC120
IIICR-GC130
IIICR-TC130
GC-GCN170PH MS - Start Phase IIIB Construction0FSGC-GCN200
IIBR-AP100
IIBR-EHM370
IIBR-GC210
IIBR-GC320
IIBR-GC330
IIBR-GC340
IIBR-GC370
IIBR-GC450
IIBR-GC470
IIBR-TC420
IIBR-TC430
GC-GCN180PH MS - Start Phase IIIC Construction0FSGC-GCN170
IBEBM-TC220
IIIBR-GC110
IIIBR-GC150
IIIBR-GC280
IIIBR-GC300
IIIBWBO-ST510
IIIBWBO-ST550
GC-GCN190PH MS - Start Phase IID Construction0FSIBEBM-RW330
IIBR-GC191
IICR-GC110
IICR-TC120
IICR-TC140
IICR-TC150
IICR-TC190
GC-GCN200PH MS - Start Phase IIIA Construction0FSIBR-GC110
IIAR-TC130
IIBEBO-ST390
IIBEBO-ST580
GC-GCN210PH MS - Punch List/Acceptance0FSIIIBWBO-GC110
IVEBM-AP100
IVWBM-AP100
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening0FSIBEBM-RW111
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening0FSIBEBM-RW290
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-AP100
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening0FSIBEBM-AP100
IBEBM-TC110
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSGC-GCN170
IBR-GC120PH IB - Guardrail (Roadway) - Ramp B0FSIBR-AP110
IIAR-TC120PH IIA - Construction 12' Widening on I-4 (NEBound) - Ramp I4- Interstate0FSGC-GCN140
IIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate0FSGC-GCN140
IIBEBM-GC110PH IIB - Rumble Strip (Widening) - EB Median Widening0FSIIBEBO-AP110
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening0FSIIBEBO-RW140
IIBEBO-RW160
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-SP120
IIBEBO-W130
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-EW101
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening0FSIIBEBO-EW102
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR0FSIIBEBO-RW120
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR0FSIIBEBO-RW150
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0FSIIBEBO-RW140
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)0FSIIBEBO-SP100
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSGC-GCN140
IBEBM-ST120
IBWBM-ST230
IBWBM-ST610
IBWBM-ST670
IIBR-EW120
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST410
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST2
IIBEBO-ST7
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST2
IIBEBO-ST140
IIBEBO-ST160
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST230
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST230
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)0FSIICR-AP120
IICR-GC180
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (International Dr.3) - EB Outside Widening (SR528)0FSIIBEBO-W110
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FSIIBEBO-W120
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)0FSGC-GCN140
GC-GCN150
IIBEBO-W130
IIBR-GC150PH IIB - Demo - Ramp S-10FSGC-GCN140
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U0FSIIBR-GC460
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R0FSIIBR-AP150
IIBR-ITS70PH IIB - Install CCTV's (1-8)0FSPRE-FA-043
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate0FSIIAR-TC120
IIAR-TC130
IIBR-TC270
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E0FSIIBEBO-AP100
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-10FSIIBEBO-AP100
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-10FSIIBEBO-AP100
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSIIBEBO-AP100
IIBR-EW130
IIBR-TC330
IIBR120
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0FSIIBEBO-AP100
IIBR-RW130
IIBR100
IIBR170PH IIB - Construct Ramp U Diversion - Ramp U0FSIIBEBO-AP100
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E0FSIIBR-IB10
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0FSIIBR-TC270
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-017
PRE-FA-018
PRE-FA-024
PRE-FA-025
PRE-FA-026
PRE-FA-027
PRE-FA-028
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20FSGC-GCN150
IIBR-EW120
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST320
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST100
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIBEBO-W150
IIDEBO-ST190
IIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST190
IIDEBO-ST200
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST210
IIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST240
IIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-10FSIIDEBO-ST290
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P0FSGC-GCN170
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0FSIAI-TC110
IIBEBO-ST30
IIBEBO-ST590
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST680
IIIBR-AP140PH IIIB - Asphalt - Structural - Ramp T0FSIIIBR-RW190
IIIBR-EW150PH IIIB - Embankment - Ramp P0FSIIIBR-SP150
IIIBR-GC210PH IIIB - Demo - Ramp T0FSGC-GCN200
IIIBR-TC230
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T0FSIIIBR-AP140
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P0FSIIIBR-RW210
IIIBR-GC340PH IIIB - Demo - Ramp Q0FSIIIBR-RW210
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)0FSIIIBR-ITS1020
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)0FSIIIBR-ITS140
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)0FSIIBR-ITS40
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS1010
IIIBR-SM520PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (9)0FSIIIBR-SM510
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)0FSIIIBR-SM520
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0FSIIIBR-SM540
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0FSIIIBR-SM550
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (A)0FSIIIBR-SM560
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0FSIIIBR-SM580
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)0FSIIIBR-SM590
IIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T0FSIIIBR-GC210
IIIBR-TC230PH IIIB - Temp Striping New Ramp Alignment - Ramp T0FSIIIBR-TC220
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G0FSGC-GCN170
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J0FSGC-GCN170
IIIBR-RW110
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q0FSGC-GCN170
IIIBR-RW210
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside Widening Area0FSIIIBWBO-RW160
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBWBO-SP120
IIIBWBO-W130
PRE-FA-015
IIIBWBO-EW130PH IIIB - Embankment (International - I4) - WB Outside Widening Area0FSIIIBWBO-EW120
IIIBWBO-W110
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSIIIBWBO-GC120
IIIBWBO-RW120PH IIIB - Stabilization (International - I4) - WB Outside Widening Area0FSIIIBWBO-RW110
IIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area0FSIIIBWBO-RW120
IIIBWBO-RW150PH IIIB - Base (Universal - International) - WB Outside Widening Area0FSIIIBWBO-RW140
IIIBWBO-RW160PH IIIB - Base (International - I4) - WB Outside Widening Area0FSIIIBWBO-RW150
IIIBWBO-SP100PH IIIB - Drainage (JYP-Universal) - WB Outside Widening Area (SR528)0FSGC-GCN170
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST211
IIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST211
IIIBWBO-ST250
IIIBWBO-ST310PH IIIB - End Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST360
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST370
IIIBWBO-ST400
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-008
PRE-FA-009
PRE-FA-010
PRE-FA-011
PRE-FA-012
PRE-FA-050
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-008
PRE-FA-009
PRE-FA-010
PRE-FA-011
PRE-FA-012
PRE-FA-050
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area0FSGC-GCN170
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280
IIIC-CP10PH IIIC - Construct Ped Signalization at Ramps G&F0FSIIICR-AP100
IIICR-GC100PH IIIC - Demo - Ramp F0FSIIICR-TC130
IIICR-SP100PH IIIC - Drainage (Temp) - Ramp F0FSIIICR-GC100
IIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F0FSGC-GCN180
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F0FSGC-GCN180
IVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening0FSIVEBM-W220
IVWBM-RW130
IVWBM-RW250
IVEBM-SP100PH IV - Drainage - EB Median Widening (entire Project)0SSIVEBM-GC100
IVEBM-TC120PH IV - MOT Shift for Phase - EB Median Widening1SSIVEBM-TC110
IVEBM-W170PH IV - Median Wall - Grading for Station 2 (International Drive to Universal)0FSIVEBM-W160
IVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)0FSIVEBM-W190
IVEBO-SS100PH IV - Install Overhead Signs Structures - EB Outside Widening0FSIVEBO-TC100
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)0FSIVR-SM670
IVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening0FSIVEBM-W220
IVWBM-RW130
IVWBM-RW110PH IV - Grade for road for Station 1 (I4 to International Drive) (B)0FSIVEBM-W160
IVWBM-RW120PH IV - Grade for road for Station 2 (International Drive to Universal) (B)0FSIVEBM-W190
IVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)0FSIVEBM-W220
IVWBM-RW200PH IV - Grade for road for Station 1 (I4 to International Drive) (A)0FSIVEBM-SP100
IVEBM-W160
IVWBM-RW230PH IV - Grade for road for Station 2 (International Drive to Universal) (A)0FSIVEBM-W190
IVWBM-RW260PH IV - Grade for Station 3 (Universal to JYP) (A)0FSIVEBM-W220
IVWBM-RW280PH IV - Base for Station 3 (Universal to JYP)0FSIVWBM-RW270
IVWBO-AP100PH IV - Asphalt - Overbuild & Friction - WB Outside Widening Area0FSIVR-ET50
IVR-ET60
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area0FSIVWBO-TC100
IVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area0FSIIIAWBO-ST211
IIIBWBO-ST150
IIIBWBO-ST510
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSNA-GC100
PRE-FA-043
PRE-FA-048
PRE-RA-043
TF-CO-002Install Upright 1 D.S.0SSTF-CO-001
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)0FSTF-CO-001
TF-CO-004Precast Erection0FSPRE-FA-034
PRE-FA-035
TF-CO-019Install Security System0FSTF-CO-018

The following predecessor relationships were added since E8P02 Update No. 11.

Legend

Logic tie related to a newly added activity

Activity IDActivity DescriptionLagRelationship TypePredecessor Activity IDPredecessor Activity Description
GC-GC110PH MS - Substantial Completion0FSIVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening
GC-GC110PH MS - Substantial Completion10FFIVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening
GC-GC110PH MS - Substantial Completion0FSIVR-SM710PH IV - Allow for TEC Install and Test
GC-GC110PH MS - Substantial Completion0FSIVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening
GC-GC110PH MS - Substantial Completion0FSNA-GC100TEC Install and Test
GC-GCN140PH MS - Start Phase II B Construction0FSIBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)
GC-GCN160PH MS - Start Phase IV Construction0FSIBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)
GC-GCN160PH MS - Start Phase IV Construction0FSIBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)
GC-GCN160PH MS - Start Phase IV Construction0FSIICR-RW340PH IIC - Complete Widening - Ramp H
GC-GCN160PH MS - Start Phase IV Construction0FSIICR-RW360PH IIC - Complete Widening - Ramp L
GC-GCN160PH MS - Start Phase IV Construction0FSIICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C
GC-GCN170PH MS - Start Phase III B Construction0FSIIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)
GC-GCN210PH MS - Punch List/Acceptance0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
GC-GCN210PH MS - Punch List/Acceptance0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
GC-GCN210PH MS - Punch List/Acceptance0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
GC-GCN210PH MS - Punch List/Acceptance0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
GC-GCN210PH MS - Punch List/Acceptance0FSIVWBM-PM110PH IV - Tubular Delineators - WB Express Divider
GC-GCN210PH MS - Punch List/Acceptance0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
GC-GCN210PH MS - Punch List/Acceptance0FSIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
GC-GCN210PH MS - Punch List/Acceptance0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
GC-GCN220Written Suspend order - FOC related to pending change0FSITS10-1000Issue Identification
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)0FSIBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)0FSIBEBM-RW300PH IB - Base (Universal - JYP) - EB Median Widening
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening0FSIBEBM-RW310PH IB - Guard Rail Removal - EB Median Widening
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0FSIBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-TC210PH IB - Construct Diversion at Shingle Creek- EB Median Widening
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSIIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSIIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSIICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)0FSIIBR-EW140PH IIB - Embankment - Ramp C
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)0FSIIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)0FSIIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive0FSIIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)
IIBEBM-GC110PH IV - Rumble Strips - EB Median0FSIVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)0FSIIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)0FSIIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)0FSIIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3200FSIIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3200FSIIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3200FSIIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0FSIIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0FSIIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0FSIIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening0FSIIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening0FSIIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening0FSIBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0FSIBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)0FSIBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0FSIIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)0FSIBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)0FSIIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)0FSGC-GCN120PH MS - Start Phase IB Construction
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)0FSIIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)0FSIIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening
IIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)0FSIIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening
IIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)0FSGC-GCN140PH MS - Start Phase II B Construction
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSGC-GCN120PH MS - Start Phase IB Construction
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)0FSIIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)0FSIIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)
IIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive0FSIIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FSIIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)0FSIIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)0FSIICR-GC120PH IIC - Guardrail (Roadway) - Ramp S
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)0FSPRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C0FSIIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I0FSUSDED-CO-001Duke Energy Distribution (A)
IIBR-GC150PH IIB - Demo - Ramp S-10FSGC-GCN110PH MS - Start Phase IA Construction
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-10FFIICR-RW350PH IIC - Complete Widening - Ramp I-1
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U0FSIIBR-GC450PH IIB - Performance Turf, SOD - Ramp U
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R0FSGC-GCN140PH MS - Start Phase II B Construction
IIBR-ITS50PH IIB - Install ITS Poles (1-20)0FSIIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)
IIBR-RW200PH IIB - Stabilization - Ramp R-20FSIIBR-SP240PH IIB - Drainage - Ramp R-1
IIBR-RW200PH IIB - Stabilization - Ramp R-20FSIIBR-SP250PH IIB - Drainage - Ramp R-2
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)0FSIIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)0FSIIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)
IIBR-SP240PH IIB - Drainage - Ramp R-10FSIIBR-EW130PH IIB - Embankment - Ramp R-1
IIBR-SP250PH IIB - Drainage - Ramp R-20FSIIBR-EW170PH IIB - Embankment - Ramp R-2
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E0FSGC-GCN120PH MS - Start Phase IB Construction
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-10FSGC-GCN120PH MS - Start Phase IB Construction
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-10FSGC-GCN120PH MS - Start Phase IB Construction
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSGC-GCN120PH MS - Start Phase IB Construction
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0FSGC-GCN120PH MS - Start Phase IB Construction
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-20FSIICR-GC100PH IIC - Demo - Ramp S-2
IICR-RW110PH IIC - Base - Ramp S-20FSIICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-2
IICR-RW330PH IIC - Complete Widening - Ramp E0FSIIBR-AP110PH IIB - Asphalt - Structural - Ramp E
IICR-RW330PH IIC - Complete Widening - Ramp E0FSIICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E
IICR-RW340PH IIC - Complete Widening - Ramp H0FSIIBR-AP140PH IIB - Asphalt - Structural - Ramp H
IICR-RW340PH IIC - Complete Widening - Ramp H0FSIICR-TC180PH IIC - MOT Shift New Ramp Alignment - Ramp H
IICR-RW350PH IIC - Complete Widening - Ramp I-10FSIICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-1
IICR-RW360PH IIC - Complete Widening - Ramp L0FSIICR-TC200PH IIC - MOT Shift New Ramp Alignment - Ramp L
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In0FSIIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In0FSIIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In0FSIICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O0FSIIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O0FSIIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0FSIIBR-AP120PH IIB - Asphalt - Structural - Ramp C
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20FSGC-GCN120PH MS - Start Phase IB Construction
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 3690FSIIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST100PH IID - Construct Crane Access - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)0FSGC-GCN140PH MS - Start Phase II B Construction
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)1FFIIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)0FSIICR-GC120PH IIC - Guardrail (Roadway) - Ramp S
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)0FFIIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)0FSGC-GCN120PH MS - Start Phase IB Construction
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0FSIBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0FSIBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0FSIIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0FSGC-GCN120PH MS - Start Phase IB Construction
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSIIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)
IIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area0FSIIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T0FSIIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle0FSIIIBR-GC250PH IIIB - Demo - Ramp P
IIIBR-GC210PH III C - Demo - old temp Ramp T gore0FSIIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T
IIIBR-GC210PH III C - Demo - old temp Ramp T gore0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIBR-AP120PH IIB - Asphalt - Structural - Ramp C
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-GC390PH IIIB - Guardrail - Median Widening STA 2030+00 to STA 217+000FSIIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T0FSIIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 160SSIVEBO-SS100PH IV - Install OT Structures - East of JYP
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)0FSIIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)0FSGC-GCN220Written Suspend order - FOC related to pending change
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)0FSIIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)0FSIIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)0FSIIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)0FSIIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)
IIIBR-ITS190PH IIIB - Splice/Terminate FOC0FSIIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)
IIIBR-ITS190PH IIIB - Splice/Terminate FOC0FSIIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)
IIIBR-ITS190PH IIIB - Splice/Terminate FOC0FSIIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)0FSGC-GCN120PH MS - Start Phase IB Construction
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)
IIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)0FSGC-GCN220Written Suspend order - FOC related to pending change
IIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)0FSIIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware
IIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)0FSIIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)
IIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)0FSIIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)
IIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)0FSIIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle0FSIIIBR-SP150PH IIIB - Drainage - Ramp P
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle0FSIIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area
IIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T0FSIIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T0FSIIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T0FSIIIBR-GC210PH III C - Demo - old temp Ramp T gore
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T0FSIIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)0SSIIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0FSIIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)0SSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0FSIIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)0FSIIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)
IIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)0FSIIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)
IIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)0FSIIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T0FSIIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G0FSGC-GCN120PH MS - Start Phase IB Construction
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J0FSGC-GCN120PH MS - Start Phase IB Construction
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q0FSGC-GCN140PH MS - Start Phase II B Construction
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0FSIIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0FSIIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0FSIIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive0FSIIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area
IIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening0FSIIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening0FSIIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area4FFIIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area0FSIBWBM-TC150PH IB - Construct Diversion at I-Drive - WB Median Widening
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening0FSGC-GCN170PH MS - Start Phase III B Construction
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSIIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge0FSIIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area0FSGC-GCN170PH MS - Start Phase III B Construction
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area0FSIIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 320
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area0FSIIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0FSGC-GCN170PH MS - Start Phase III B Construction
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0FSIIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0FSIIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0FFIIIBWBO-ST490PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area0FSIIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area1FFIIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area3FFIIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area0FFIIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area0FSIIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening0FSIIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening0FSIIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area0FSIIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)0FSGC-GCN120PH MS - Start Phase IB Construction
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)0FSIIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)0FSIIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)0FSIIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)0FSIIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)0FSIIBR-EHM370PH IIB - Existing High Mast Removal (28-33)
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)0FSIIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)0FSIIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)0FSIICR-RW330PH IIC - Complete Widening - Ramp E
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)0FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)0FSIIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)0FSIIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)0FSIIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)0FSIIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area0FSIBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIICR-RW330PH IIC - Complete Widening - Ramp E
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FFIIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside5SSIIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman0FSIIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman2SSIIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive0FSIIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N0FSIICR-AP120PH IIC - Asphalt - Structural - Ramp M
IIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive0FSIIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F
IIICR-GC100PH IIIC - Demo - Old Ramp F0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F0FSIIICR-AP100PH IIIC - Asphalt - Structural - Ramp F
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F0FSGC-GCN120PH MS - Start Phase IB Construction
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F0FSIIICR-AP100PH IIIC - Asphalt - Structural - Ramp F
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F0FSIIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive
IIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G0FSIIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J0FSIIIBR-AP110PH IIIB - Asphalt - Structural - Ramp J
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N0FSIIICR-AP110PH IIIC - Asphalt - Structural - Ramp N
IIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K0FSIIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0FSIIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0FSIIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)
IIICR180PH IIIC - Remove Diversion - Ramp T0FSIIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T
IIICR180PH IIIC - Remove Diversion - Ramp T0FSIIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0FSIIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0FSIIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0FSIIIBR-GC360PH IIIB - Guardrail (Roadway) - Ramp Q
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V0FSIIIBR-AP120PH IIIB - Asphalt - Structural - Ramp V
ITS10-1000Issue Identification0FSGC-DP100PH MS - NTP
ITS10-1010NOI submitted - Potential Delay to Project Schedule0FSITS10-1000Issue Identification
ITS10-1020Plan Revision 10 Officially transmitted0FSGC-GCN220Written Suspend order - FOC related to pending change
ITS10-1020Plan Revision 10 Officially transmitted0FSITS10-1010NOI submitted - Potential Delay to Project Schedule
ITS10-1030Plan Revision 10 - Review and Procurement0FSITS10-1020Plan Revision 10 Officially transmitted
ITS10-1040Fabrication and Delivery - Conduits0FSITS10-1030Plan Revision 10 - Review and Procurement
ITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings0FSITS10-1020Plan Revision 10 Officially transmitted
ITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings0FSITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings
ITS10-1070Fabrication & Delivery - ITS Standby Generators0FSITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings
ITS10-1080Furnish & Install ITS Standby Generators0FSITS10-1070Fabrication & Delivery - ITS Standby Generators
ITS10-1090Furnish & Install - Conduit0FSITS10-1040Fabrication and Delivery - Conduits
ITS10-1100ITS Generator Stand AloneTesting0FSITS10-1080Furnish & Install ITS Standby Generators
ITS10-1110Fabrication and Delivery - Conductors0FSITS10-1030Plan Revision 10 - Review and Procurement
ITS10-1120Modify existing cabinets to incorporate additional conduit0FSITS10-1090Furnish & Install - Conduit
ITS10-1130Furnish & Install - Conductors0FSITS10-1110Fabrication and Delivery - Conductors
ITS10-1130Furnish & Install - Conductors0FSITS10-1120Modify existing cabinets to incorporate additional conduit
ITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers0FSITS10-1030Plan Revision 10 - Review and Procurement
ITS10-1150Furnish & Install - Step Up / Step Down Transformers0FSITS10-1130Furnish & Install - Conductors
ITS10-1150Furnish & Install - Step Up / Step Down Transformers0FSITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers
ITS10-1160Furnish & Install - FOC Drops0FSITS10-1090Furnish & Install - Conduit
ITS10-1170Splice / Terminate FOC Drops0FSITS10-1160Furnish & Install - FOC Drops
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express0FSIIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express0FSIVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express0FSIVWBM-RW300PH IV - Base - Station 311 to 332 EB Express
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express0FSIVWBM-RW320PH IV - Base - Station 335 to 352 EB Express
IVEBM-PM110PH IV - Tubular Delineators - EB Express Divider0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening0FSIVEBM-PM110PH IV - Tubular Delineators - EB Express Divider
IVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening10FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)0FSIVWBM-GC100PH IV - Demo Temporary - WB Express
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 369
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 16
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 2170FSIVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 2170FSIVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 3110FSIVEBM-GC100PH IV - Demo Temporary pavement - EB Express
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 3110FSIVEBM-SP100PH IV - Drainage - Median Widening (West of 311)
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 3110FSIVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 3110FSIVWBM-RW240PH IV - Stabilization - Station 259+50 to 311 EB Express
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+500FSIVEBM-GC100PH IV - Demo Temporary pavement - EB Express
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+500FSIVEBM-SP100PH IV - Drainage - Median Widening (West of 311)
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+503SSIVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+500FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+503SSIVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+50
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+505SSIVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+50
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3320FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3320FSIVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express
IVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 3320FSIVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 332
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 3320FSIVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 332
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 332
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express
IVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 3520FSIVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 352
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 3520FSIVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 352
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIIBR-EHM370PH IIB - Existing High Mast Removal (28-33)
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSIVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIAR-GC100PH IIB - Performance Turf, SOD - Ramp O
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-1
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIBR-GC320PH IIB - Performance Turf, SOD - Ramp H
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIBR-GC330PH IIB - Performance Turf, SOD - Ramp R
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIBR-GC370PH IIB - Performance Turf, SOD - Ramp L
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIBR-GC470PH IIB - Performance Turf, SOD - Ramp D
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIICR-GC180PH IIC - Guardrail (Roadway) - Ramp M
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIICR-RW350PH IIC - Complete Widening - Ramp I-1
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIIBR-GC390PH IIIB - Guardrail - Median Widening STA 2030+00 to STA 217+00
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR-GC100PH IIIC - Demo - Old Ramp F
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR180PH IIIC - Remove Diversion - Ramp T
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIVR-IPM100PH IV - Install Post Mount Signs (231-349)
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP3FFIIBEBM-GC110PH IV - Rumble Strips - EB Median
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVR-ET50PH IV - Erect Trusses (9-17)
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVR-ET60PH IV - Erect Trusses (18-24)
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening0FSIIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIICR-GC110PH IIC - Performance Turf, SOD - Ramp S-2
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIICR180PH IIIC - Remove Diversion - Ramp T
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSIVEBO-SS100PH IV - Install OT Structures - East of JYP
IVR-ET60PH IV - Erect Trusses (18-24)0FSIIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 16
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)0FSPRE-FA-020Fabricate and Deliver 992 Under deck Lighting
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)0FSPRE-FA-020Fabricate and Deliver 992 Under deck Lighting
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)0FSPRE-FA-020Fabricate and Deliver 992 Under deck Lighting
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)0FSPRE-FA-020Fabricate and Deliver 992 Under deck Lighting
IVR-SM710PH IV - Allow for TEC Install and Test0FSIVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express
IVR-SM710PH IV - Allow for TEC Install and Test0FSIVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express0FSIVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express
IVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express0FSIVWBM-RW340PH IV - Base - Station 311 to 332 WB Express
IVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express0FSIVWBM-RW370PH IV - Base - Station 335 to 352 WB Express
IVWBM-PM110PH IV - Tubular Delineators - WB Express Divider0FSIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
IVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening10FSIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express3SSIVWBM-SP100PH IV - Drainage - Median Widening (East of 311)
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express0FSIVWBM-GC100PH IV - Demo Temporary - WB Express
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express2SSIVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express0FSIVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 311
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express0FSIVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 217
IVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express0FSIVEBM-GC100PH IV - Demo Temporary pavement - EB Express
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express0FSIVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 311
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express0FSIVEBM-GC100PH IV - Demo Temporary pavement - EB Express
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express0FSIVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+50
IVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express0FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express0FSIVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express
IVWBM-RW300PH IV - Base - Station 311 to 332 EB Express0FSIVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 332
IVWBM-RW300PH IV - Base - Station 311 to 332 EB Express0FSIVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express
IVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express0FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express0FSIVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express
IVWBM-RW320PH IV - Base - Station 335 to 352 EB Express0FSIVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 352
IVWBM-RW320PH IV - Base - Station 335 to 352 EB Express0FSIVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express
IVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express0FSIVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express
IVWBM-RW340PH IV - Base - Station 311 to 332 WB Express0FSIVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express
IVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express0FSIIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge
IVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express0FSIVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express
IVWBM-RW370PH IV - Base - Station 335 to 352 WB Express0FSIVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 352
IVWBM-RW370PH IV - Base - Station 335 to 352 WB Express0FSIVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express
IVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express0FSIIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIBR-AP110PH IB - Asphalt - Structural - Ramp B/C Gore
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIBR-AP120PH IIB - Asphalt - Structural - Ramp C
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIBR-GC200PH IIB - Grade ditch and SOD - Ramp C
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FSIVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FSIVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FSIVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FFIVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N
NA-GC100TEC Install and Test0FSIVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express
NA-GC100TEC Install and Test0FSIVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSITS10-1100ITS Generator Stand AloneTesting
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSITS10-1150Furnish & Install - Step Up / Step Down Transformers
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSITS10-1170Splice / Terminate FOC Drops
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)0FSIIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility
TF-CO-017F+1 Fuel Tank0FSPRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping

The following predecessor relationships were deleted since E8P02 Update No. 11.

Legend

Logic tie related to activities added since previous update

Activity IDActivity DescriptionLagRelationship TypePredecessor Activity IDPredecessor Activity Description
GC-GC110PH MS - Substantial Completion0FSIIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area
GC-GC110PH MS - Substantial Completion0FSIVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening
GC-GCN140PH MS - Start Phase IIB Construction0FSIBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening
GC-GCN140PH MS - Start Phase IIB Construction0FSIBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening
GC-GCN140PH MS - Start Phase IIB Construction0FSIBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)
GC-GCN140PH MS - Start Phase IIB Construction0FSIBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)
GC-GCN140PH MS - Start Phase IIB Construction0FSUSDED-CO-001Duke Energy Distribution (A)
GC-GCN160PH MS - Start Phase IV Construction0FSIIAR-GC100PH IIB - Performance Turf, SOD - Ramp O
GC-GCN160PH MS - Start Phase IV Construction0FSIIBEBM-GC110PH IIB - Rumble Strip (Widening) - EB Median Widening
GC-GCN160PH MS - Start Phase IV Construction0FSIIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening
GC-GCN160PH MS - Start Phase IV Construction0FSIIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)
GC-GCN160PH MS - Start Phase IV Construction0FSIIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)
GC-GCN160PH MS - Start Phase IV Construction0FSIIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F
GC-GCN160PH MS - Start Phase IV Construction0FSIIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F
GC-GCN160PH MS - Start Phase IV Construction0FSIIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N
GC-GCN160PH MS - Start Phase IV Construction0FSIIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F
GC-GCN170PH MS - Start Phase IIIB Construction0FSGC-GCN200PH MS - Start Phase IIIA Construction
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-AP100PH IIB - Asphalt - Structural - Ramp B
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-EHM370PH IIB - Existing High Mast Removal (28-33)
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-1
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC320PH IIB - Performance Turf, SOD - Ramp H
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC330PH IIB - Performance Turf, SOD - Ramp R-2
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC370PH IIB - Performance Turf, SOD - Ramp L
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC450PH IIB - Performance Turf, SOD - Ramp U
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-GC470PH IIB - Performance Turf, SOD - Ramp D
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C
GC-GCN180PH MS - Start Phase IIIC Construction0FSGC-GCN170PH MS - Start Phase IIIB Construction
GC-GCN180PH MS - Start Phase IIIC Construction0FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)
GC-GCN190PH MS - Start Phase IID Construction0FSIBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening
GC-GCN190PH MS - Start Phase IID Construction0FSIIBR-GC191PH IIB - Performance Turf, SOD - Ramp A
GC-GCN190PH MS - Start Phase IID Construction0FSIICR-GC110PH IIC - Performance Turf, SOD - Ramp S-2
GC-GCN190PH MS - Start Phase IID Construction0FSIICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E
GC-GCN190PH MS - Start Phase IID Construction0FSIICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C
GC-GCN190PH MS - Start Phase IID Construction0FSIICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-1
GC-GCN190PH MS - Start Phase IID Construction0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
GC-GCN200PH MS - Start Phase IIIA Construction0FSIBR-GC110PH IB - Performance Turf, SOD - Ramp B
GC-GCN200PH MS - Start Phase IIIA Construction0FSIIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate
GC-GCN200PH MS - Start Phase IIIA Construction0FSIIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)
GC-GCN200PH MS - Start Phase IIIA Construction0FSIIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)
GC-GCN210PH MS - Punch List/Acceptance0FSIIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area
GC-GCN210PH MS - Punch List/Acceptance0FSIVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening
GC-GCN210PH MS - Punch List/Acceptance0FSIVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening0FSIBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening0FSIBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening0FSIBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening0FSIBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSGC-GCN170PH MS - Start Phase IIIB Construction
IBR-GC120PH IB - Guardrail (Roadway) - Ramp B0FSIBR-AP110PH IB - Asphalt - Structural - Ramp B
IIAR-TC120PH IIA - Construction 12' Widening on I-4 (NEBound) - Ramp I4- Interstate0FSGC-GCN140PH MS - Start Phase IIB Construction
IIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate0FSGC-GCN140PH MS - Start Phase IIB Construction
IIBEBM-GC110PH IIB - Rumble Strip (Widening) - EB Median Widening0FSIIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening0FSIIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening0FSIIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening0FFIIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening0FSIIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR0FSIIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR0FSIIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0FSIIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)0FSIIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSGC-GCN140PH MS - Start Phase IIB Construction
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSIBEBM-ST120PH IB - Construct Crane Access - EB Median Widening (Bridge over John Young PKWY)
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSIBWBM-ST230PH IB - Construct Crane Access - WB Median Widening (Bridge over John Young PKWY)
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSIBWBM-ST610PH IB - Approach Slabs - WB Median Widening (Bridge over John Young PKWY)
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSIBWBM-ST670PH IB - Grind and Groove - WB Median Widening (Bridge over John Young PKWY)
IIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSIIBR-EW120PH IIB - Embankment - Ramp S-1
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST7PH IIB- Removal of Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Internatio
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)0FSIICR-AP120PH IIC - Asphalt - Structural - Ramp M
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)0FSIICR-GC180PH IIC - Guardrail (Roadway) - Ramp M
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (International Dr.3) - EB Outside Widening (SR528)0FSIIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (International Dr.2) - EB Outside Widening (SR528)
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FSIIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (International Dr.3) - EB Outside Widening (SR528)
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)0FSGC-GCN140PH MS - Start Phase IIB Construction
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)0FSGC-GCN150PH MS - Start Phase IIC Construction
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)0FSIIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)
IIBR-GC150PH IIB - Demo - Ramp S-10FSGC-GCN140PH MS - Start Phase IIB Construction
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U0FSIIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R0FSIIBR-AP150PH IIB - Asphalt - Structural - Ramp R-2
IIBR-ITS70PH IIB - Install CCTV's (1-8)0FSPRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate0FSIIAR-TC120PH IIA - Construction 12' Widening on I-4 (NEBound) - Ramp I4- Interstate
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate0FSIIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate0FSIIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E0FSIIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-10FSIIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-10FSIIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSIIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSIIBR-EW130PH IIB - Embankment - Ramp R-1
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSIIBR-TC330PH IIB - Temp Striping New Ramp Alignment - Ramp R-2
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-20FSIIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-1
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0FSIIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0FSIIBR-RW130PH IIB - Base - Ramp E
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H0FSIIBR100PH IIB - Construct Ramp E Diversion - Ramp E
IIBR170PH IIB - Construct Ramp U Diversion - Ramp U0FSIIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E0FSIIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0FSIIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-018Fabricate and Deliver 650 Traffic Signals
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-024Fabricate and Deliver 633 Communication Cable
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-026Fabricate and Deliver 653 Pedestrian Signals
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSPRE-FA-028Fabricate and Deliver 665 Pedestrian Detector
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20FSGC-GCN150PH MS - Start Phase IIC Construction
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-20FSIIBR-EW120PH IIB - Embankment - Ramp S-1
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST100PH IID - Construct Crane Access - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIBEBO-W150PH IIB - MSE Wall RW5(Continue Panels\set coping) - EB Outside Widening (SR528)
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST190PH IID - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST190PH IID - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST240PH IID - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST300PH IID - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)
IIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-10FSIIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0FSIAI-TC110PH IA - Set Temp Traffic Barriers - Interchanges Roads Universal Avn
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBR-AP140PH IIIB - Asphalt - Structural - Ramp T0FSIIIBR-RW190PH IIIB - Base - Ramp T
IIIBR-EW150PH IIIB - Embankment - Ramp P0FSIIIBR-SP150PH IIIB - Drainage (Temp) - Ramp P
IIIBR-GC210PH IIIB - Demo - Ramp T0FSGC-GCN200PH MS - Start Phase IIIA Construction
IIIBR-GC210PH IIIB - Demo - Ramp T0FSIIIBR-TC230PH IIIB - Temp Striping New Ramp Alignment - Ramp T
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T0FSIIIBR-AP140PH IIIB - Asphalt - Structural - Ramp T
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P0FSIIIBR-RW210PH IIIB - Base - Ramp P
IIIBR-GC340PH IIIB - Demo - Ramp Q0FSIIIBR-RW210PH IIIB - Base - Ramp P
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)0FSIIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)0FSIIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)0FSIIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)
IIIBR-SM520PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (9)0FSIIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)0FSIIIBR-SM520PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (9)
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0FSIIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0FSIIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (A)0FSIIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)
IIIBR-SM580PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (B)0FSIIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (A)
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0FSIIIBR-SM580PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (B)
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)0FSIIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)
IIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T0FSIIIBR-GC210PH IIIB - Demo - Ramp T
IIIBR-TC220PH IIIB - Set Temp Traffic Barriers (Shoulder) - RampT0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIBR-TC230PH IIIB - Temp Striping New Ramp Alignment - Ramp T0FSIIIBR-TC220PH IIIB - Set Temp Traffic Barriers (Shoulder) - RampT
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J0FSIIIBR-RW110PH IIIB - Base - Ramp G
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q0FSIIIBR-RW210PH IIIB - Base - Ramp P
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside Widening Area0FSIIIBWBO-RW160PH IIIB - Base (International - I4) - WB Outside Widening Area
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBWBO-W130PH IIIB - Concrete FACED SHEET Pile Wall 3 - WB Outside Widening Area (SR528)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSPRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems
IIIBWBO-EW130PH IIIB - Embankment (International - I4) - WB Outside Widening Area0FSIIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area
IIIBWBO-EW130PH IIIB - Embankment (International - I4) - WB Outside Widening Area0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 - WB Outside Widening Area (SR528)
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSIIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening Area
IIIBWBO-RW120PH IIIB - Stabilization (International - I4) - WB Outside Widening Area0FSIIIBWBO-RW110PH IIIB - Stabilization (Universal - International) - WB Outside Widening Area
IIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area0FSIIIBWBO-RW120PH IIIB - Stabilization (International - I4) - WB Outside Widening Area
IIIBWBO-RW150PH IIIB - Base (Universal - International) - WB Outside Widening Area0FSIIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area
IIIBWBO-RW160PH IIIB - Base (International - I4) - WB Outside Widening Area0FSIIIBWBO-RW150PH IIIB - Base (Universal - International) - WB Outside Widening Area
IIIBWBO-SP100PH IIIB - Drainage (JYP-Universal) - WB Outside Widening Area (SR528)0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST211PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST211PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST310PH IIIB - End Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-050Fabricate and Deliver 400 Concrete Structures (SIP Metal Forms)
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)0FSPRE-FA-050Fabricate and Deliver 400 Concrete Structures (SIP Metal Forms)
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-W130PH IIIB - Concrete FACED SHEET Pile Wall 3 - WB Outside Widening Area (SR528)0FSIIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall 2 - WB Outside Widening Area (SR528)
IIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F0FSIIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G
IIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F0FSIIICR-AP100PH IIIC - Asphalt - Structural - Ramp F
IIIC-CP10PH IIIC - Construct Ped Signalization at Ramps G&F0FSIIICR-AP100PH IIIC - Asphalt - Structural - Ramp F
IIICR-GC100PH IIIC - Demo - Ramp F0FSIIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F
IIICR-SP100PH IIIC - Drainage (Temp) - Ramp F0FSIIICR-GC100PH IIIC - Demo - Ramp F
IIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F0FSGC-GCN180PH MS - Start Phase IIIC Construction
IVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening0FSIVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)
IVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening0FSIVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)
IVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening0FSIVWBM-RW250PH IV - Base for road for Station 2 (International Drive to Universal) (A)
IVEBM-SP100PH IV - Drainage - EB Median Widening (entire Project)0SSIVEBM-GC100PH IV - Demo Temporary - EB Median Widening
IVEBM-TC120PH IV - MOT Shift for Phase - EB Median Widening0FFIVEBM-TC110PH IV - Temp Striping for Phase - EB Median Widening
IVEBM-TC120PH IV - MOT Shift for Phase - EB Median Widening1SSIVEBM-TC110PH IV - Temp Striping for Phase - EB Median Widening
IVEBM-W170PH IV - Median Wall - Grading for Station 2 (International Drive to Universal)0FSIVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)
IVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)0FSIVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)
IVEBM-W210PH IV - Median Wall - FFP Footing/Stem for Station 3 (Universal to JYP)0FSIVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)0FSIVEBM-W210PH IV - Median Wall - FFP Footing/Stem for Station 3 (Universal to JYP)
IVEBO-SS100PH IV - Install Overhead Signs Structures - EB Outside Widening0FSIVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)0FSIVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)
IVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening0FSIVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)
IVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening0FSIVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)
IVWBM-RW110PH IV - Grade for road for Station 1 (I4 to International Drive) (B)0FSIVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)
IVWBM-RW120PH IV - Grade for road for Station 2 (International Drive to Universal) (B)0FSIVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)
IVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)0FSIVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)
IVWBM-RW150PH IV - Base for Station 3 (Universal to JYP) (B)0FSIVWBM-RW140PH IV - Stabilization for Station 3 (Universal to JYP) (A)
IVWBM-RW200PH IV - Grade for road for Station 1 (I4 to International Drive) (A)0FSIVEBM-SP100PH IV - Drainage - EB Median Widening (entire Project)
IVWBM-RW200PH IV - Grade for road for Station 1 (I4 to International Drive) (A)0FSIVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)
IVWBM-RW230PH IV - Grade for road for Station 2 (International Drive to Universal) (A)0FSIVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)
IVWBM-RW260PH IV - Grade for Station 3 (Universal to JYP) (A)0FSIVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)
IVWBM-RW280PH IV - Base for Station 3 (Universal to JYP)0FSIVWBM-RW270PH IV - Stabilization for Station 3 (Universal to JYP) (A)
IVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening0SSIVWBM-TC110PH IV - Temp Striping for Phase - WB Median Widening
IVWBO-AP100PH IV - Asphalt - Overbuild & Friction - WB Outside Widening Area0FSIVR-ET50PH IV - Erect Trusses (9-17)
IVWBO-AP100PH IV - Asphalt - Overbuild & Friction - WB Outside Widening Area0FSIVR-ET60PH IV - Erect Trusses (18-24)
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area0FSIVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area
IVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area0FSIIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)
IVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area0FSIIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)
IVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area0FSIIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSNA-GC100TEC Install and Test
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSPRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSPRE-FA-048Fabricate and Deliver 785 ITS Infrastructure
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSPRE-RA-043Review and Approve 782 ITS CCTV Camera
PRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera0FSPRE-RA-043Review and Approve 782 ITS CCTV Camera
PRE-FA-048Fabricate and Deliver 785 ITS Infrastructure0FSPRE-RA-048Review and Approve 785 ITS Infrastructure
PRE-PS-043Prepare and Submit 782 ITS CCTV Camera0FSGC-GC100PH MS - NTP2 - Start Construction (35 days from NTP 1= Contract date )
PRE-PS-048Prepare and Submit 785 ITS Infrastructure0FSGC-GC100PH MS - NTP2 - Start Construction (35 days from NTP 1= Contract date )
PRE-RA-043Review and Approve 782 ITS CCTV Camera0FSPRE-PS-043Prepare and Submit 782 ITS CCTV Camera
PRE-RA-048Review and Approve 785 ITS Infrastructure0FSPRE-PS-048Prepare and Submit 785 ITS Infrastructure
TF-CO-002Install Upright 1 D.S.0FSTF-CO-001Foundation (FRP SOG)
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)0FSTF-CO-001Foundation (FRP SOG)
TF-CO-004Precast Erection0FSPRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping
TF-CO-004Precast Erection0FSPRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping
TF-CO-019Install Security System0FSTF-CO-018Install Lighting
TF-CO-020Install Lightning Protection0FFPRE-FA-040Fabricate and Deliver 264113 Lighting Protection System Product Data and Shop Drawing

The following successor relationships were added since E8P02 Update No. 11.

Legend

Logic tie related to activities added since previous update

Activity IDActivity DescriptionLagRelationship TypeSuccessor Activity IDSuccessor Activity Description
IVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening0FSGC-GC110PH MS - Substantial Completion
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening10FFGC-GC110PH MS - Substantial Completion
IVR-SM710PH IV - Allow for TEC Install and Test0FSGC-GC110PH MS - Substantial Completion
IVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening0FSGC-GC110PH MS - Substantial Completion
NA-GC100TEC Install and Test0FSGC-GC110PH MS - Substantial Completion
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)0FSGC-GCN140PH MS - Start Phase II B Construction
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)0FSGC-GCN160PH MS - Start Phase IV Construction
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)0FSGC-GCN160PH MS - Start Phase IV Construction
IICR-RW340PH IIC - Complete Widening - Ramp H0FSGC-GCN160PH MS - Start Phase IV Construction
IICR-RW360PH IIC - Complete Widening - Ramp L0FSGC-GCN160PH MS - Start Phase IV Construction
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0FSGC-GCN160PH MS - Start Phase IV Construction
IIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)0FSGC-GCN170PH MS - Start Phase III B Construction
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D0FSGC-GCN210PH MS - Punch List/Acceptance
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSGC-GCN210PH MS - Punch List/Acceptance
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSGC-GCN210PH MS - Punch List/Acceptance
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V0FSGC-GCN210PH MS - Punch List/Acceptance
IVWBM-PM110PH IV - Tubular Delineators - WB Express Divider0FSGC-GCN210PH MS - Punch List/Acceptance
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSGC-GCN210PH MS - Punch List/Acceptance
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FSGC-GCN210PH MS - Punch List/Acceptance
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas0FSGC-GCN210PH MS - Punch List/Acceptance
ITS10-1000Issue Identification0FSGC-GCN220Written Suspend order - FOC related to pending change
IBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening0FSIBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)
IBEBM-RW300PH IB - Base (Universal - JYP) - EB Median Widening0FSIBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)
IBEBM-RW310PH IB - Guard Rail Removal - EB Median Widening0FSIBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening0FSIBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening
IBEBM-TC210PH IB - Construct Diversion at Shingle Creek- EB Median Widening0FSIBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)0FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In0FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
IIBR-EW140PH IIB - Embankment - Ramp C0FSIIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)0FSIIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B0FSIIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)0FSIIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express0FSIIBEBM-GC110PH IV - Rumble Strips - EB Median
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA0FSIIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)0FSIIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)0FSIIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 320
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0FSIIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 320
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)0FSIIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 320
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)0FSIIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive0FSIIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)0FSIIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening0FSIIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)0FSIIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)0FSIIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)0FSIIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)0FSIIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)0FSIIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)0FSIIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening
IIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)0FSIIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)0FSIIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)0FSIIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)0FSIIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)0FSIIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)
GC-GCN120PH MS - Start Phase IB Construction0FSIIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)
GC-GCN140PH MS - Start Phase II B Construction0FSIIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)
GC-GCN120PH MS - Start Phase IB Construction0FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive0FSIIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive0FSIIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive0FSIIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FSIIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)
IIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive0FSIIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)0FSIIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S0FSIIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems0FSIIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area0FSIIBR-AP120PH IIB - Asphalt - Structural - Ramp C
USDED-CO-001Duke Energy Distribution (A)0FSIIBR-CP10PH IIB - Construct Ped Signalization at Ramp I
GC-GCN110PH MS - Start Phase IA Construction0FSIIBR-GC150PH IIB - Demo - Ramp S-1
IICR-RW350PH IIC - Complete Widening - Ramp I-10FFIIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-1
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U0FSIIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U
GC-GCN140PH MS - Start Phase II B Construction0FSIIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)0FSIIBR-ITS50PH IIB - Install ITS Poles (1-20)
IIBR-SP240PH IIB - Drainage - Ramp R-10FSIIBR-RW200PH IIB - Stabilization - Ramp R-2
IIBR-SP250PH IIB - Drainage - Ramp R-20FSIIBR-RW200PH IIB - Stabilization - Ramp R-2
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening0FSIIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)0FSIIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)
IIBR-EW130PH IIB - Embankment - Ramp R-10FSIIBR-SP240PH IIB - Drainage - Ramp R-1
IIBR-EW170PH IIB - Embankment - Ramp R-20FSIIBR-SP250PH IIB - Drainage - Ramp R-2
GC-GCN120PH MS - Start Phase IB Construction0FSIIBR100PH IIB - Construct Ramp E Diversion - Ramp E
GC-GCN120PH MS - Start Phase IB Construction0FSIIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-1
GC-GCN120PH MS - Start Phase IB Construction0FSIIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-1
GC-GCN120PH MS - Start Phase IB Construction0FSIIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-2
GC-GCN120PH MS - Start Phase IB Construction0FSIIBR150PH IIB - Construct Ramp H Diversion - Ramp H
IICR-GC100PH IIC - Demo - Ramp S-20FSIICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-2
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-20FSIICR-RW110PH IIC - Base - Ramp S-2
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E0FSIICR-RW330PH IIC - Complete Widening - Ramp E
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E0FSIICR-RW330PH IIC - Complete Widening - Ramp E
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H0FSIICR-RW340PH IIC - Complete Widening - Ramp H
IICR-TC180PH IIC - MOT Shift New Ramp Alignment - Ramp H0FSIICR-RW340PH IIC - Complete Widening - Ramp H
IICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-10FSIICR-RW350PH IIC - Complete Widening - Ramp I-1
IICR-TC200PH IIC - MOT Shift New Ramp Alignment - Ramp L0FSIICR-RW360PH IIC - Complete Widening - Ramp L
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)0FSIICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O0FSIICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)0FSIICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C0FSIICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C
GC-GCN120PH MS - Start Phase IB Construction0FSIICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-2
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSIICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-2
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening0FSIIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 369
IIDEBO-ST100PH IID - Construct Crane Access - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)
GC-GCN140PH MS - Start Phase II B Construction0FSIIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)1FFIIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S0FSIIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)0FFIIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)
GC-GCN120PH MS - Start Phase IB Construction0FSIIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0FSIIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSIIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening0FSIIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)0FSIIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)
GC-GCN120PH MS - Start Phase IB Construction0FSIIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)
IIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate0FSIIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T0FSIIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T
IIIBR-GC250PH IIIB - Demo - Ramp P0FSIIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T0FSIIIBR-GC210PH III C - Demo - old temp Ramp T gore
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIIBR-GC210PH III C - Demo - old temp Ramp T gore
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0FSIIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C0FSIIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C0FSIIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-GC390PH IIIB - Guardrail - Median Widening STA 2030+00 to STA 217+00
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T0FSIIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T
IVEBO-SS100PH IV - Install OT Structures - East of JYP0SSIIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 16
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)0FSIIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)
GC-GCN220Written Suspend order - FOC related to pending change0FSIIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware0FSIIIBR-ITS160PH IIIB - Pull FOC (International to Univ)
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware0FSIIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)0FSIIIBR-ITS190PH IIIB - Splice/Terminate FOC
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)0FSIIIBR-ITS190PH IIIB - Splice/Terminate FOC
IIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)0FSIIIBR-ITS190PH IIIB - Splice/Terminate FOC
GC-GCN120PH MS - Start Phase IB Construction0FSIIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)0FSIIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)
GC-GCN220Written Suspend order - FOC related to pending change0FSIIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware0FSIIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)
IIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)0FSIIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)
IIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)0FSIIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)
IIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)0FSIIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)
IIIBR-SP150PH IIIB - Drainage - Ramp P0FSIIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area0FSIIIBR-RW210PH IIIB - Base - Ramp P to Shingle
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T0FSIIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)0FSIIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T
IIIBR-GC210PH III C - Demo - old temp Ramp T gore0FSIIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0FSIIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)0SSIIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)0FSIIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0SSIIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)0FSIIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)0FSIIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)
IIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)0FSIIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)
IIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)0FSIIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T0FSIIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P
IIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T0FSIIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T0FSIIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge
GC-GCN120PH MS - Start Phase IB Construction0FSIIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G
GC-GCN120PH MS - Start Phase IB Construction0FSIIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J
GC-GCN140PH MS - Start Phase II B Construction0FSIIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)0FSIIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)0FSIIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0FSIIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area0FSIIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)0FSIIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area0FSIIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area0FSIIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)4FFIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IBWBM-TC150PH IB - Construct Diversion at I-Drive - WB Median Widening0FSIIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area
GC-GCN170PH MS - Start Phase III B Construction0FSIIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening0FSIIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening0FSIIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge
GC-GCN170PH MS - Start Phase III B Construction0FSIIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3200FSIIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 3320FSIIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area
GC-GCN170PH MS - Start Phase III B Construction0FSIIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)0FSIIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)0FSIIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIIBWBO-ST490PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over International DR)0FFIIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area0FSIIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)1FFIIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area3FFIIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)0FFIIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area0FSIIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside0FSIIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside0FSIIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive0FSIIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening0FSIIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area
GC-GCN120PH MS - Start Phase IB Construction0FSIIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)0FSIIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area0FSIIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area0FSIIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area0FSIIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area0FSIIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)0FSIIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T0FSIIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)
IIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)0FSIIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)
IICR-RW330PH IIC - Complete Widening - Ramp E0FSIIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSIIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)0FSIIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)0FSIIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)0FSIIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening0FSIIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area
IICR-RW330PH IIC - Complete Widening - Ramp E0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive0FSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)0FFIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman5SSIIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman0FSIIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB0FSIIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive2SSIIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman0FSIIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive
IICR-AP120PH IIC - Asphalt - Structural - Ramp M0FSIIICR-AP110PH IIIC - Asphalt - Structural - Ramp N
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F0FSIIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIIICR-GC100PH IIIC - Demo - Old Ramp F
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F0FSIIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F
GC-GCN120PH MS - Start Phase IB Construction0FSIIICR100PH IIIC - Construct Ramp F Diversion - Ramp F
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F0FSIIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F
IIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive0FSIIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G0FSIIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G
IIIBR-AP110PH IIIB - Asphalt - Structural - Ramp J0FSIIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N0FSIIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N
IIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K0FSIIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle0FSIIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P0FSIIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T0FSIIICR180PH IIIC - Remove Diversion - Ramp T
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIIICR180PH IIIC - Remove Diversion - Ramp T
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q0FSIIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q0FSIIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q
IIIBR-GC360PH IIIB - Guardrail (Roadway) - Ramp Q0FSIIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q
IIIBR-AP120PH IIIB - Asphalt - Structural - Ramp V0FSIIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V
GC-DP100PH MS - NTP0FSITS10-1000Issue Identification
ITS10-1000Issue Identification0FSITS10-1010NOI submitted - Potential Delay to Project Schedule
GC-GCN220Written Suspend order - FOC related to pending change0FSITS10-1020Plan Revision 10 Officially transmitted
ITS10-1010NOI submitted - Potential Delay to Project Schedule0FSITS10-1020Plan Revision 10 Officially transmitted
ITS10-1020Plan Revision 10 Officially transmitted0FSITS10-1030Plan Revision 10 - Review and Procurement
ITS10-1030Plan Revision 10 - Review and Procurement0FSITS10-1040Fabrication and Delivery - Conduits
ITS10-1020Plan Revision 10 Officially transmitted0FSITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings
ITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings0FSITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings
ITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings0FSITS10-1070Fabrication & Delivery - ITS Standby Generators
ITS10-1070Fabrication & Delivery - ITS Standby Generators0FSITS10-1080Furnish & Install ITS Standby Generators
ITS10-1040Fabrication and Delivery - Conduits0FSITS10-1090Furnish & Install - Conduit
ITS10-1080Furnish & Install ITS Standby Generators0FSITS10-1100ITS Generator Stand AloneTesting
ITS10-1030Plan Revision 10 - Review and Procurement0FSITS10-1110Fabrication and Delivery - Conductors
ITS10-1090Furnish & Install - Conduit0FSITS10-1120Modify existing cabinets to incorporate additional conduit
ITS10-1110Fabrication and Delivery - Conductors0FSITS10-1130Furnish & Install - Conductors
ITS10-1120Modify existing cabinets to incorporate additional conduit0FSITS10-1130Furnish & Install - Conductors
ITS10-1030Plan Revision 10 - Review and Procurement0FSITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers
ITS10-1130Furnish & Install - Conductors0FSITS10-1150Furnish & Install - Step Up / Step Down Transformers
ITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers0FSITS10-1150Furnish & Install - Step Up / Step Down Transformers
ITS10-1090Furnish & Install - Conduit0FSITS10-1160Furnish & Install - FOC Drops
ITS10-1160Furnish & Install - FOC Drops0FSITS10-1170Splice / Terminate FOC Drops
IIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)0FSIVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express0FSIVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express
IVWBM-RW300PH IV - Base - Station 311 to 332 EB Express0FSIVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express
IVWBM-RW320PH IV - Base - Station 335 to 352 EB Express0FSIVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP0FSIVEBM-PM110PH IV - Tubular Delineators - EB Express Divider
IVEBM-PM110PH IV - Tubular Delineators - EB Express Divider0FSIVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP10FSIVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening
IVWBM-GC100PH IV - Demo Temporary - WB Express0FSIVEBM-SP100PH IV - Drainage - Median Widening (West of 311)
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)0FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 3690FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 160FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening0FSIVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express0FSIVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 217
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express0FSIVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 217
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express0FSIVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 311
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)0FSIVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 311
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express0FSIVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 311
IVWBM-RW240PH IV - Stabilization - Station 259+50 to 311 EB Express0FSIVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 311
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express0FSIVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+50
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)0FSIVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+50
IVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express3SSIVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+50
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+50
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+503SSIVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+50
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+505SSIVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+50
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 332
IVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express0FSIVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 332
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3320FSIVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 332
IVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 3320FSIVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 332
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 352
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 352
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 3320FSIVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 352
IVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express0FSIVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 352
IVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express0FSIVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 352
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 3520FSIVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 352
IVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 3520FSIVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 352
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)0FSIVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-10FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIBR-GC320PH IIB - Performance Turf, SOD - Ramp H0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIBR-GC370PH IIB - Performance Turf, SOD - Ramp L0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIBR-GC470PH IIB - Performance Turf, SOD - Ramp D0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IICR-RW350PH IIC - Complete Widening - Ramp I-10FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIIBR-GC390PH IIIB - Guardrail - Median Widening STA 2030+00 to STA 217+000FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR-GC100PH IIIC - Demo - Old Ramp F0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR180PH IIIC - Remove Diversion - Ramp T0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IVR-IPM100PH IV - Install Post Mount Signs (231-349)0FSIVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P
IIBEBM-GC110PH IV - Rumble Strips - EB Median3FFIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVR-ET50PH IV - Erect Trusses (9-17)0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVR-ET60PH IV - Erect Trusses (18-24)0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C0FSIVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP
IIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E0FSIVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IICR-GC110PH IIC - Performance Turf, SOD - Ramp S-20FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIICR180PH IIIC - Remove Diversion - Ramp T0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IVEBO-SS100PH IV - Install OT Structures - East of JYP0FSIVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 160FSIVR-ET60PH IV - Erect Trusses (18-24)
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting0FSIVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting0FSIVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting0FSIVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting0FSIVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express0FSIVR-SM710PH IV - Allow for TEC Install and Test
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express0FSIVR-SM710PH IV - Allow for TEC Install and Test
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express0FSIVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express
IVWBM-RW340PH IV - Base - Station 311 to 332 WB Express0FSIVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express
IVWBM-RW370PH IV - Base - Station 335 to 352 WB Express0FSIVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-40FSIVWBM-PM110PH IV - Tubular Delineators - WB Express Divider
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-410FSIVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening
IVWBM-SP100PH IV - Drainage - Median Widening (East of 311)3SSIVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express
IVWBM-GC100PH IV - Demo Temporary - WB Express0FSIVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express
IVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express2SSIVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 3110FSIVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express
IVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 2170FSIVWBM-RW220PH IV - Base - Station 207 to 217 EB Express
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express0FSIVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 3110FSIVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express0FSIVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge0FSIVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+500FSIVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express
IVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express0FSIVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 3320FSIVWBM-RW300PH IV - Base - Station 311 to 332 EB Express
IVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express0FSIVWBM-RW300PH IV - Base - Station 311 to 332 EB Express
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP0FSIVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express
IVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express0FSIVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 3520FSIVWBM-RW320PH IV - Base - Station 335 to 352 EB Express
IVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express0FSIVWBM-RW320PH IV - Base - Station 335 to 352 EB Express
IVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express0FSIVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express
IVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express0FSIVWBM-RW340PH IV - Base - Station 311 to 332 WB Express
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express
IVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express0FSIVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 3520FSIVWBM-RW370PH IV - Base - Station 335 to 352 WB Express
IVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express0FSIVWBM-RW370PH IV - Base - Station 335 to 352 WB Express
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge0FSIVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express
IBR-AP110PH IB - Asphalt - Structural - Ramp B/C Gore0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp C0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V0FSIVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express0FSIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express0FSIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
IVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express0FSIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
IVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening0FFIVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N0FSIVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express0FSNA-GC100TEC Install and Test
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express0FSNA-GC100TEC Install and Test
ITS10-1100ITS Generator Stand AloneTesting0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
ITS10-1150Furnish & Install - Step Up / Step Down Transformers0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
ITS10-1170Splice / Terminate FOC Drops0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility0FSTF-CO-003Begin Electrical (Stub Outs & Site Electrical)
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping0FSTF-CO-017F+1 Fuel Tank

The following successor relationships were deleted since E8P02 Update No. 11.

Legend

Logic tie related to activities added since previous update

Activity IDActivity DescriptionLagRelationship TypePredecessor Activity IDPredecessor Activity Description
IIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area0FSGC-GC110PH MS - Substantial Completion
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening0FSGC-GC110PH MS - Substantial Completion
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening0FSGC-GCN140PH MS - Start Phase IIB Construction
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening0FSGC-GCN140PH MS - Start Phase IIB Construction
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)0FSGC-GCN140PH MS - Start Phase IIB Construction
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)0FSGC-GCN140PH MS - Start Phase IIB Construction
USDED-CO-001Duke Energy Distribution (A)0FSGC-GCN140PH MS - Start Phase IIB Construction
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O0FSGC-GCN160PH MS - Start Phase IV Construction
IIBEBM-GC110PH IIB - Rumble Strip (Widening) - EB Median Widening0FSGC-GCN160PH MS - Start Phase IV Construction
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening0FSGC-GCN160PH MS - Start Phase IV Construction
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)0FSGC-GCN160PH MS - Start Phase IV Construction
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)0FSGC-GCN160PH MS - Start Phase IV Construction
IIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F0FSGC-GCN160PH MS - Start Phase IV Construction
IIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F0FSGC-GCN160PH MS - Start Phase IV Construction
IIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N0FSGC-GCN160PH MS - Start Phase IV Construction
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F0FSGC-GCN160PH MS - Start Phase IV Construction
GC-GCN200PH MS - Start Phase IIIA Construction0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-AP100PH IIB - Asphalt - Structural - Ramp B0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-10FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC320PH IIB - Performance Turf, SOD - Ramp H0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R-20FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC370PH IIB - Performance Turf, SOD - Ramp L0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-GC470PH IIB - Performance Turf, SOD - Ramp D0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B0FSGC-GCN170PH MS - Start Phase IIIB Construction
IIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C0FSGC-GCN170PH MS - Start Phase IIIB Construction
GC-GCN170PH MS - Start Phase IIIB Construction0FSGC-GCN180PH MS - Start Phase IIIC Construction
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)0FSGC-GCN180PH MS - Start Phase IIIC Construction
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)0FSGC-GCN180PH MS - Start Phase IIIC Construction
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0FSGC-GCN190PH MS - Start Phase IID Construction
IIBR-GC191PH IIB - Performance Turf, SOD - Ramp A0FSGC-GCN190PH MS - Start Phase IID Construction
IICR-GC110PH IIC - Performance Turf, SOD - Ramp S-20FSGC-GCN190PH MS - Start Phase IID Construction
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E0FSGC-GCN190PH MS - Start Phase IID Construction
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C0FSGC-GCN190PH MS - Start Phase IID Construction
IICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-10FSGC-GCN190PH MS - Start Phase IID Construction
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-20FSGC-GCN190PH MS - Start Phase IID Construction
IBR-GC110PH IB - Performance Turf, SOD - Ramp B0FSGC-GCN200PH MS - Start Phase IIIA Construction
IIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate0FSGC-GCN200PH MS - Start Phase IIIA Construction
IIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)0FSGC-GCN200PH MS - Start Phase IIIA Construction
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)0FSGC-GCN200PH MS - Start Phase IIIA Construction
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area0FSGC-GCN210PH MS - Punch List/Acceptance
IVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening0FSGC-GCN210PH MS - Punch List/Acceptance
IVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening0FSGC-GCN210PH MS - Punch List/Acceptance
IBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening0FSIBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening
IBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening0FSIBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening0FSIBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening0FSIBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening0FSIBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening
GC-GCN170PH MS - Start Phase IIIB Construction0FSIBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening
IBR-AP110PH IB - Asphalt - Structural - Ramp B0FSIBR-GC120PH IB - Guardrail (Roadway) - Ramp B
GC-GCN140PH MS - Start Phase IIB Construction0FSIIAR-TC120PH IIA - Construction 12' Widening on I-4 (NEBound) - Ramp I4- Interstate
GC-GCN140PH MS - Start Phase IIB Construction0FSIIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening0FSIIBEBM-GC110PH IIB - Rumble Strip (Widening) - EB Median Widening
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR0FSIIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA0FSIIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)0FSIIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FFIIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening0FSIIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening0FSIIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening0FSIIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA0FSIIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR0FSIIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)0FSIIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)
GC-GCN140PH MS - Start Phase IIB Construction0FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IBEBM-ST120PH IB - Construct Crane Access - EB Median Widening (Bridge over John Young PKWY)0FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IBWBM-ST230PH IB - Construct Crane Access - WB Median Widening (Bridge over John Young PKWY)0FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IBWBM-ST610PH IB - Approach Slabs - WB Median Widening (Bridge over John Young PKWY)0FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IBWBM-ST670PH IB - Grind and Groove - WB Median Widening (Bridge over John Young PKWY)0FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IIBR-EW120PH IIB - Embankment - Ramp S-10FSIIBEBO-ST19PH IIB - Construct Crane Access - EB Outside Widening (Bridge 750629 Ramp S over JYP)
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)0FSIIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST7PH IIB- Removal of Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Internatio0FSIIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)0FSIIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr0FSIIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr0FSIIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)
IICR-AP120PH IIC - Asphalt - Structural - Ramp M0FSIIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M0FSIIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (International Dr.2) - EB Outside Widening (SR528)0FSIIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (International Dr.3) - EB Outside Widening (SR528)
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (International Dr.3) - EB Outside Widening (SR528)0FSIIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)
GC-GCN140PH MS - Start Phase IIB Construction0FSIIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)
GC-GCN150PH MS - Start Phase IIC Construction0FSIIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)0FSIIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)
GC-GCN140PH MS - Start Phase IIB Construction0FSIIBR-GC150PH IIB - Demo - Ramp S-1
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U0FSIIBR-GC450PH IIB - Performance Turf, SOD - Ramp U
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-20FSIIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R
PRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera0FSIIBR-ITS70PH IIB - Install CCTV's (1-8)
IIAR-TC120PH IIA - Construction 12' Widening on I-4 (NEBound) - Ramp I4- Interstate0FSIIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate
IIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- Interstate0FSIIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate
IIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C0FSIIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0FSIIBR100PH IIB - Construct Ramp E Diversion - Ramp E
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0FSIIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-1
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0FSIIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-1
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0FSIIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-2
IIBR-EW130PH IIB - Embankment - Ramp R-10FSIIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-2
IIBR-TC330PH IIB - Temp Striping New Ramp Alignment - Ramp R-20FSIIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-2
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-10FSIIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-2
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0FSIIBR150PH IIB - Construct Ramp H Diversion - Ramp H
IIBR-RW130PH IIB - Base - Ramp E0FSIIBR150PH IIB - Construct Ramp H Diversion - Ramp H
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E0FSIIBR150PH IIB - Construct Ramp H Diversion - Ramp H
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)0FSIIBR170PH IIB - Construct Ramp U Diversion - Ramp U
IIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E0FSIICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E
IIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C0FSIICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
PRE-FA-018Fabricate and Deliver 650 Traffic Signals0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
PRE-FA-024Fabricate and Deliver 633 Communication Cable0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
PRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
PRE-FA-026Fabricate and Deliver 653 Pedestrian Signals0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
PRE-FA-028Fabricate and Deliver 665 Pedestrian Detector0FSIICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-2
GC-GCN150PH MS - Start Phase IIC Construction0FSIICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-2
IIBR-EW120PH IIB - Embankment - Ramp S-10FSIICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-2
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST100PH IID - Construct Crane Access - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)
IIBEBO-W150PH IIB - MSE Wall RW5(Continue Panels\set coping) - EB Outside Widening (SR528)0FSIIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST190PH IID - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST190PH IID - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST240PH IID - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST300PH IID - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)0FSIIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)0FSIIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-1
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P
IAI-TC110PH IA - Set Temp Traffic Barriers - Interchanges Roads Universal Avn0FSIIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)0FSIIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)0FSIIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBR-RW190PH IIIB - Base - Ramp T0FSIIIBR-AP140PH IIIB - Asphalt - Structural - Ramp T
IIIBR-SP150PH IIIB - Drainage (Temp) - Ramp P0FSIIIBR-EW150PH IIIB - Embankment - Ramp P
GC-GCN200PH MS - Start Phase IIIA Construction0FSIIIBR-GC210PH IIIB - Demo - Ramp T
IIIBR-TC230PH IIIB - Temp Striping New Ramp Alignment - Ramp T0FSIIIBR-GC210PH IIIB - Demo - Ramp T
IIIBR-AP140PH IIIB - Asphalt - Structural - Ramp T0FSIIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T
IIIBR-RW210PH IIIB - Base - Ramp P0FSIIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P
IIIBR-RW210PH IIIB - Base - Ramp P0FSIIIBR-GC340PH IIIB - Demo - Ramp Q
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)0FSIIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)0FSIIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)0FSIIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)0FSIIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)0FSIIIBR-SM520PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (9)
IIIBR-SM520PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (9)0FSIIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)0FSIIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)0FSIIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)0FSIIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (A)
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (A)0FSIIIBR-SM580PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (B)
IIIBR-SM580PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (B)0FSIIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)0FSIIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)
IIIBR-GC210PH IIIB - Demo - Ramp T0FSIIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIBR-TC220PH IIIB - Set Temp Traffic Barriers (Shoulder) - RampT
IIIBR-TC220PH IIIB - Set Temp Traffic Barriers (Shoulder) - RampT0FSIIIBR-TC230PH IIIB - Temp Striping New Ramp Alignment - Ramp T
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J
IIIBR-RW110PH IIIB - Base - Ramp G0FSIIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q
IIIBR-RW210PH IIIB - Base - Ramp P0FSIIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q
IIIBWBO-RW160PH IIIB - Base (International - I4) - WB Outside Widening Area0FSIIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside Widening Area
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBWBO-W130PH IIIB - Concrete FACED SHEET Pile Wall 3 - WB Outside Widening Area (SR528)0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems0FSIIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area0FSIIIBWBO-EW130PH IIIB - Embankment (International - I4) - WB Outside Widening Area
IIIBWBO-W110PH IIIB - MSE Wall RW-1 - WB Outside Widening Area (SR528)0FSIIIBWBO-EW130PH IIIB - Embankment (International - I4) - WB Outside Widening Area
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening Area0FSIIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area
IIIBWBO-RW110PH IIIB - Stabilization (Universal - International) - WB Outside Widening Area0FSIIIBWBO-RW120PH IIIB - Stabilization (International - I4) - WB Outside Widening Area
IIIBWBO-RW120PH IIIB - Stabilization (International - I4) - WB Outside Widening Area0FSIIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area
IIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening Area0FSIIIBWBO-RW150PH IIIB - Base (Universal - International) - WB Outside Widening Area
IIIBWBO-RW150PH IIIB - Base (Universal - International) - WB Outside Widening Area0FSIIIBWBO-RW160PH IIIB - Base (International - I4) - WB Outside Widening Area
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIBWBO-SP100PH IIIB - Drainage (JYP-Universal) - WB Outside Widening Area (SR528)
IIIBWBO-ST211PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST211PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-ST310PH IIIB - End Bent 5 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl0FSIIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)
IIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)0FSIIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)0FSIIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)0FSIIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)0FSIIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)0FSIIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)0FSIIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-050Fabricate and Deliver 400 Concrete Structures (SIP Metal Forms)0FSIIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)0FSIIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)0FSIIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)0FSIIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)0FSIIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)0FSIIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)
PRE-FA-050Fabricate and Deliver 400 Concrete Structures (SIP Metal Forms)0FSIIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)
GC-GCN170PH MS - Start Phase IIIB Construction0FSIIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area
IIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)0FSIIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall 2 - WB Outside Widening Area (SR528)0FSIIIBWBO-W130PH IIIB - Concrete FACED SHEET Pile Wall 3 - WB Outside Widening Area (SR528)
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G0FSIIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F0FSIIIC-AP170PH IIIC - Construct Ped. Signalization at Ramps G&F
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F0FSIIIC-CP10PH IIIC - Construct Ped Signalization at Ramps G&F
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F0FSIIICR-GC100PH IIIC - Demo - Ramp F
IIICR-GC100PH IIIC - Demo - Ramp F0FSIIICR-SP100PH IIIC - Drainage (Temp) - Ramp F
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F
GC-GCN180PH MS - Start Phase IIIC Construction0FSIIICR100PH IIIC - Construct Ramp F Diversion - Ramp F
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)0FSIVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening
IVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)0FSIVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening
IVWBM-RW250PH IV - Base for road for Station 2 (International Drive to Universal) (A)0FSIVEBM-AP100PH IV - Asphalt - Structural - EB Median Widening
IVEBM-GC100PH IV - Demo Temporary - EB Median Widening0SSIVEBM-SP100PH IV - Drainage - EB Median Widening (entire Project)
IVEBM-TC110PH IV - Temp Striping for Phase - EB Median Widening0FFIVEBM-TC120PH IV - MOT Shift for Phase - EB Median Widening
IVEBM-TC110PH IV - Temp Striping for Phase - EB Median Widening1SSIVEBM-TC120PH IV - MOT Shift for Phase - EB Median Widening
IVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)0FSIVEBM-W170PH IV - Median Wall - Grading for Station 2 (International Drive to Universal)
IVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)0FSIVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)
IVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)0FSIVEBM-W210PH IV - Median Wall - FFP Footing/Stem for Station 3 (Universal to JYP)
IVEBM-W210PH IV - Median Wall - FFP Footing/Stem for Station 3 (Universal to JYP)0FSIVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening0FSIVEBO-SS100PH IV - Install Overhead Signs Structures - EB Outside Widening
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)0FSIVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)0FSIVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening
IVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)0FSIVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening
IVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)0FSIVWBM-RW110PH IV - Grade for road for Station 1 (I4 to International Drive) (B)
IVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)0FSIVWBM-RW120PH IV - Grade for road for Station 2 (International Drive to Universal) (B)
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)0FSIVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)
IVWBM-RW140PH IV - Stabilization for Station 3 (Universal to JYP) (A)0FSIVWBM-RW150PH IV - Base for Station 3 (Universal to JYP) (B)
IVEBM-SP100PH IV - Drainage - EB Median Widening (entire Project)0FSIVWBM-RW200PH IV - Grade for road for Station 1 (I4 to International Drive) (A)
IVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)0FSIVWBM-RW200PH IV - Grade for road for Station 1 (I4 to International Drive) (A)
IVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)0FSIVWBM-RW230PH IV - Grade for road for Station 2 (International Drive to Universal) (A)
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)0FSIVWBM-RW260PH IV - Grade for Station 3 (Universal to JYP) (A)
IVWBM-RW270PH IV - Stabilization for Station 3 (Universal to JYP) (A)0FSIVWBM-RW280PH IV - Base for Station 3 (Universal to JYP)
IVWBM-TC110PH IV - Temp Striping for Phase - WB Median Widening0SSIVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening
IVR-ET50PH IV - Erect Trusses (9-17)0FSIVWBO-AP100PH IV - Asphalt - Overbuild & Friction - WB Outside Widening Area
IVR-ET60PH IV - Erect Trusses (18-24)0FSIVWBO-AP100PH IV - Asphalt - Overbuild & Friction - WB Outside Widening Area
IVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area0FSIVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)0FSIVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)0FSIVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)0FSIVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening Area
NA-GC100TEC Install and Test0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
PRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
PRE-FA-048Fabricate and Deliver 785 ITS Infrastructure0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
PRE-RA-043Review and Approve 782 ITS CCTV Camera0FSNA-GC110PH PW - ITS Testing and Commissioning - Critical Areas
PRE-RA-043Review and Approve 782 ITS CCTV Camera0FSPRE-FA-043Fabricate and Deliver 782 ITS CCTV Camera
PRE-RA-048Review and Approve 785 ITS Infrastructure0FSPRE-FA-048Fabricate and Deliver 785 ITS Infrastructure
GC-GC100PH MS - NTP2 - Start Construction (35 days from NTP 1= Contract date )0FSPRE-PS-043Prepare and Submit 782 ITS CCTV Camera
GC-GC100PH MS - NTP2 - Start Construction (35 days from NTP 1= Contract date )0FSPRE-PS-048Prepare and Submit 785 ITS Infrastructure
PRE-PS-043Prepare and Submit 782 ITS CCTV Camera0FSPRE-RA-043Review and Approve 782 ITS CCTV Camera
PRE-PS-048Prepare and Submit 785 ITS Infrastructure0FSPRE-RA-048Review and Approve 785 ITS Infrastructure
TF-CO-001Foundation (FRP SOG)0FSTF-CO-002Install Upright 1 D.S.
TF-CO-001Foundation (FRP SOG)0FSTF-CO-003Begin Electrical (Stub Outs & Site Electrical)
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping0FSTF-CO-004Precast Erection
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping0FSTF-CO-004Precast Erection
TF-CO-018Install Lighting0FSTF-CO-019Install Security System
PRE-FA-040Fabricate and Deliver 264113 Lighting Protection System Product Data and Shop Drawing0FFTF-CO-020Install Lightning Protection

The following activity descriptions were changed since E8P02 Update No. 11

Activity IDOld Activity DescriptionNew Activity Description
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp PPH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)
GC-GCN140PH MS - Start Phase IIB ConstructionPH MS - Start Phase II B Construction
GC-GCN150PH MS - Start Phase IIC ConstructionPH MS - Start Phase II C Construction
GC-GCN170PH MS - Start Phase IIIB ConstructionPH MS - Start Phase III B Construction
GC-GCN180PH MS - Start Phase IIIC ConstructionPH MS - Start Phase III C Construction
GC-GCN190PH MS - Start Phase IID ConstructionPH MS - Start Phase II D Construction
GC-GCN200PH MS - Start Phase IIIA ConstructionPH MS - Start Phase III A Construction
IBR-AP110PH IB - Asphalt - Structural - Ramp BPH IB - Asphalt - Structural - Ramp B/C Gore
IBR-AP120PH IB - Asphalt - Structural - Ramp CPH IB - Asphalt - Structural - Ramp C (Redundant)
IBR-EW100PH IB - Embankment - Ramp BPH IB - Embankment - Ramp B/C Gore
IBR-EW110PH IB - Embankment - Ramp CPH IB - Embankment - Ramp C (Redundant)
IBR-GC100PH IB - Clear & Grub/Demo - Ramp BPH IB - Clear & Grub/Demo - Ramp B/C Gore
IBR-GC110PH IB - Performance Turf, SOD - Ramp BPH IB - Performance Turf, SOD - Ramp B/C Gore
IBR-GC120PH IB - Guardrail (Roadway) - Ramp BPH IB - Guardrail (Roadway) - Ramp B/C Gore (Activity Not Req'd)
IBR-GC130PH IB - Clear & Grub/Demo - Ramp CPH IB - Clear & Grub/Demo - Ramp C (Redundant)
IBR-GC150PH IB - Performance Turf, SOD - Ramp CPH IB - Performance Turf, SOD - Ramp C (Redundant)
IBR-GC160PH IB - Guardrail (Roadway) - Ramp CPH IB - Guardrail (Roadway) - Ramp C (Redundant)
IBR-RW100PH IB - Stabilization - Ramp BPH IB - Stabilization - Ramp B/C Gore
IBR-RW110PH IB - Base - Ramp BPH IB - Base - Ramp B/C Gore
IBR-RW120PH IB - Stabilization - Ramp CPH IB - Stabilization - Ramp C (Redundant)
IBR-RW130PH IB - Base - Ramp CPH IB - Base - Ramp C (Redundant)
IBR-TC100PH IB - Set Temp Traffic Barriers - Ramp BPH IB - Set Temp Traffic Barriers - Ramp B/C Gore
IBR-TC110PH IB - Set Temp Traffic Barriers - Ramp CPH IB - Set Temp Traffic Barriers - Ramp C (Redundant)
IIIC-CP10PH IIIC - Construct Ped Signalization at Ramps G&FPH IIIC - Construct Ped. Signalization at Ramps G&F
IIAR-TC120PH IIA - Construction 12' Widening on I-4 (NEBound) - Ramp I4- InterstatePH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)
IIAR-TC130PH IIA - Construction 12' Widening on I-4 (SWBound) - Ramp I4- InterstatePH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)
IIBR-GC200PH IIB - Performance Turf, SOD - Ramp CPH IIB - Grade ditch and SOD - Ramp C
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R-2PH IIB - Performance Turf, SOD - Ramp R
IIBR-GC390PH IIB - Guardrail (Roadway) - Ramp R-2PH IIB - Guardrail (Roadway) - Ramp R
IIBR-ITS90PH IIB - Install CCTV's (17-24)PH IIB - Install CCTV's (17-22)
IIBR-SP110PH IIB - Drainage (Temp) - Ramp EPH IIB - Drainage - Ramp E
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S-2PH IIC - Guardrail (Roadway) - Ramp S
IVEBM-W140PH IV - Median Wall - Grading for Station 1 (I4 to International Drive)PH IV - Median Wall - Excavate - Station 207 to 217
IVEBM-W150PH IV - Median Wall - FFP Footing/Stem for Station 1 (I4 to International Drive)PH IV - Median Wall - FFP Stem Station 207 to 217
IVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)PH IV - Median Wall - Rebar/ slip Top Station 207 to 217
IVEBM-W170PH IV - Median Wall - Grading for Station 2 (International Drive to Universal)PH IV - Median Wall - Excavate - Station 259+50 to 311
IVEBM-W180PH IV - Median Wall - FFP Footing/Stem for Station 2 (International Drive to Universal)PH IV - Median Wall - FFP Stem - Station 259+50 to 311
IVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 311
IVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)PH IV - Median Wall - Excavate - Station 217 to 259+50
IVEBM-W210PH IV - Median Wall - FFP Footing/Stem for Station 3 (Universal to JYP)PH IV - Median Wall - FFP Stem - Station 217 to 259+50
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+50
PRE-FA-044Fabricate and Deliver 783 ITS Fiber Optic CableFabricate and (Ready to) Deliver 783 ITS Fiber Optic Cable
PRE-FA-047Fabricate and Deliver 785 ITS Uninterruptible Power Source (UPS)Fabricate and Deliver 685 ITS Uninterruptible Power Source (UPS)
PRE-PS-045Prepare and Submit 786 ITS Vehicle Detection SystemPrepare and Submit 660 ITS Vehicle Detection System
PRE-PS-046Prepare and Submit 784 ITS Managed Ethernet Hub SwitchPrepare and Submit 684 ITS Managed Ethernet Hub Switch
PRE-PS-049Prepare and Submit 262913 ITS Standby Generator Product Data and Shop DrawingPrepare and Submit 639 ITS Standby Generator Product Data and Shop Drawing
PRE-RA-044Review and Approve 783 ITS Fiber Optic CableReview and Approve 633 ITS Fiber Optic Cable
PRE-RA-045Review and Approve 786 ITS Vehicle Detection SystemReview and Approve 660 ITS Vehicle Detection System
PRE-RA-046Review and Approve 784 ITS Managed Ethernet Hub SwitchReview and Approve 684 ITS Managed Ethernet Hub Switch
PRE-RA-047Review and Approve 785 ITS Uninterruptible Power Source (UPS)Review and Approve 685 ITS Uninterruptible Power Source (UPS)
PRE-RA-049Review and Approve 262913 ITS Standby Generator Product Data and Shop DrawingReview and Approve 639 ITS Standby Generator Product Data and Shop Drawing
IBEBM-AP100PH IB - Asphalt - Structural - EB Median WideningPH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)
IIBEBO-ST31PH IIB - Gravity Wall @ Single Creek - EB Outside Widening (Bridge over Shingle Creek)PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall (International Dr.1) - EB Outside Widening (SR528)PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (International Dr.2) - EB Outside Widening (SR528)PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (International Dr.3) - EB Outside Widening (SR528)PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads\Begin Panels) - EB Outside Widening (SR528)PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)
IIBEBO-W150PH IIB - MSE Wall RW5(Continue Panels\set coping) - EB Outside Widening (SR528)PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening
IIIBR-AP140PH IIIB - Asphalt - Structural - Ramp TPH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp PPH IIIB - Asphalt - Structural - Ramp P to Shingle
IIIBR-EW150PH IIIB - Embankment - Ramp PPH IIIB - Embankment - Ramp P to Shingle
IIIBR-GC210PH IIIB - Demo - Ramp TPH III C - Demo - old temp Ramp T gore
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp PPH IIIB - Guardrail (Roadway) - Ramp P to Shingle
IIIBR-RW200PH IIIB - Stabilization - Ramp PPH IIIB - Stabilization - Ramp P to Shingle
IIIBR-RW210PH IIIB - Base - Ramp PPH IIIB - Base - Ramp P to Shingle
IIIBR-SM520PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (9)PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA) (A)PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (9 EA)PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)
IIIBR-SP150PH IIIB - Drainage (Temp) - Ramp PPH IIIB - Drainage - Ramp P
IIIBR-TC230PH IIIB - Temp Striping New Ramp Alignment - Ramp TPH III C - Temp Striping New Ramp Alignment - Ramp T
IIICR-GC100PH IIIC - Demo - Ramp FPH IIIC - Demo - Old Ramp F
IIICR-SP100PH IIIC - Drainage (Temp) - Ramp FPH IIIC - Drainage - Ramp F
IIICR-SP110PH IIIC - Drainage (Temp) - Ramp NPH IIIC - Drainage - Ramp N
IVEBM-AP100PH IV - Asphalt - Structural - EB Median WideningPH IV - Asphalt - Structural - Station 207 to 259+50 EB Express
IVEBM-GC100PH IV - Demo Temporary - EB Median WideningPH IV - Demo Temporary pavement - EB Express
IVEBM-SP100PH IV - Drainage - EB Median Widening (entire Project)PH IV - Drainage - Median Widening (West of 311)
IVEBM-TC100PH IV - Set Temp Traffic Barriers - EB Median WideningPH IV - Shift EB traffic to outside I-Drive through Station 312
IVEBM-TC110PH IV - Temp Striping for Phase - EB Median WideningPH IV - Remove Temp Barrier - EB Median Widening
IVEBM-TC120PH IV - MOT Shift for Phase - EB Median WideningPH IV - TCP Shift to Phase IV - EB traffic to outside at JYP
IVEBO-AP100PH IV - Asphalt - Overbuild & Friction - EB Outside WideningPH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D
IVEBO-SS100PH IV - Install Overhead Signs Structures - EB Outside WideningPH IV - Install OT Structures - East of JYP
IVWBM-AP100PH IV - Asphalt - Structural - WB Median WideningPH IV - Asphalt - Structural - Station 207 to 259+50 WB Express
IVWBM-GC100PH IV - Demo Temporary - WB Median WideningPH IV - Demo Temporary - WB Express
IVWBM-RW110PH IV - Grade for road for Station 1 (I4 to International Drive) (B)PH IV - Grade for road - Station 207 to 217 WB Express
IVWBM-RW120PH IV - Grade for road for Station 2 (International Drive to Universal) (B)PH IV - Grade for road - Station 259+50 to 311 WB Express
IVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)PH IV - Grade for road Station 217 to 259+50 WB Express
IVWBM-RW140PH IV - Stabilization for Station 3 (Universal to JYP) (A)PH IV - Stabilization - Station 217 to 259+50 WB Express
IVWBM-RW150PH IV - Base for Station 3 (Universal to JYP) (B)PH IV - Base - Station 217 to 259+50 WB Express
IVWBM-RW160PH IV - Stabilization for road for Station 2 (International Drive to Universal) (A)PH IV - Stabilization - Station 259+50 to 311 WB Express
IVWBM-RW170PH IV - Base for road for Station 2 (International Drive to Universal) (B)PH IV - Base - Station 259+50 to 311 WB Express
IVWBM-RW180PH IV - Stabilization for road for Station 1 (I4 to International Drive) (B)PH IV - Stabilization for road - Station 207 to 217 WB Express
IVWBM-RW190PH IV - Base for road for Station 1 (I4 to International Drive) (B)PH IV - Base for road - Station 207 to 217 WB Express
IVWBM-RW200PH IV - Grade for road for Station 1 (I4 to International Drive) (A)PH IV - Grade for road - Station 207 to 217 EB Express
IVWBM-RW210PH IV - Stabilization for road for Station 1 (I4 to International Drive) (A)PH IV - Stabilization - Station 207 to 217 EB Express
IVWBM-RW220PH IV - Base for road for Station 1 (I4 to International Drive) (A)PH IV - Base - Station 207 to 217 EB Express
IVWBM-RW230PH IV - Grade for road for Station 2 (International Drive to Universal) (A)PH IV - Grade for road - Station 259+50 to 311 EB Express
IVWBM-RW240PH IV - Stabilization for road for Station 2 (International Drive to Universal) (B)PH IV - Stabilization - Station 259+50 to 311 EB Express
IVWBM-RW250PH IV - Base for road for Station 2 (International Drive to Universal) (A)PH IV - Base - Station 259+50 to 311 EB Express
IVWBM-RW260PH IV - Grade for Station 3 (Universal to JYP) (A)PH IV - Subgrade Station 217 to 259+50 EB Express
IVWBM-RW270PH IV - Stabilization for Station 3 (Universal to JYP) (A)PH IV - Stabilization for Station 217 to 259+50 EB Express
IVWBM-RW280PH IV - Base for Station 3 (Universal to JYP)PH IV - Base - Station 217 to 259+50 EB Express
IVWBM-SP100PH IV - Drainage - WB Median Widening (Entire Project)PH IV - Drainage - Median Widening (East of 311)
IVWBM-TC110PH IV - Temp Striping for Phase - WB Median WideningPH IV - Remove Temp barrier - WB Median Widening
IVWBO-AP100PH IV - Asphalt - Overbuild & Friction - WB Outside Widening AreaPH IV - Asphalt - Friction - WB Outside Incl Ramp B,C
IVWBO-TC100PH IV - Reconfigure & Remove MOT Devices - WB Outside Widening AreaPH IV - Shift WB traffic to outside over new WB I-Drive Bridge
IIBEBM-GC110PH IIB - Rumble Strip (Widening) - EB Median WideningPH IV - Rumble Strips - EB Median
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside WideningPH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside WideningPH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LRPH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)
IIBEBO-ST720PH IIB - Curing for End Bent 5 - EB Outside Widening (Bridge over International DR)PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)
IIBEBO-ST730PH IIB - Curing for End Bent 5 - EB Outside Widening (Bridge over universal BLVD)PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over universal BLVD)
IIDEBO-ST190PH IID - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST210PH IID - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST240PH IID - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over John Young PKWY)PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)
IIDEBO-ST300PH IID - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)
IIIBR-ITS160PH IIIB - Pull FOC ( International to Univ)PH IIIB - Pull FOC (International to Univ)
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13)PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal
IIIBWBO-W100PH IIIB - Concrete FACED SHEET Pile Wall - WB Outside Widening Area (SR528)PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive
IIIBWBO-W110PH IIIB - MSE Wall RW-1 - WB Outside Widening Area (SR528)PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall 2 - WB Outside Widening Area (SR528)PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive
IIIBWBO-W130PH IIIB - Concrete FACED SHEET Pile Wall 3 - WB Outside Widening Area (SR528)PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside Widening AreaPH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive
IIIBWBO-EW130PH IIIB - Embankment (International - I4) - WB Outside Widening AreaPH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening AreaPH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge
IIIBWBO-RW100PH IIIB - Stabilization (JYP-Universal) - WB Outside Widening AreaPH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area
IIIBWBO-RW110PH IIIB - Stabilization (Universal - International) - WB Outside Widening AreaPH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area
IIIBWBO-RW120PH IIIB - Stabilization (International - I4) - WB Outside Widening AreaPH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area
IIIBWBO-RW140PH IIIB - Base (JYP - Universal) - WB Outside Widening AreaPH IIIB - Base (Shingle - Universal) - WB Outside Widening Area
IIIBWBO-RW150PH IIIB - Base (Universal - International) - WB Outside Widening AreaPH IIIB - Base (Ramp G - International) - WB Outside Widening Area
IIIBWBO-RW160PH IIIB - Base (International - I4) - WB Outside Widening AreaPH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area
IIIBWBO-SP100PH IIIB - Drainage (JYP-Universal) - WB Outside Widening Area (SR528)PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)
IIIBWBO-ST211PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over International DR)PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)
IIIBWBO-ST260PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over universal BLVD)PH IIIB - Wall Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)
IIIBWBO-ST280PH IIIB - Wall Bent 5 - WB Outside Widening Area (Bridge over International DR)PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST300PH IIIB - End Bent 5 - WB Outside Widening Area (Bridge over universal BLVD)PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)
IIIBWBO-ST310PH IIIB - End Bent 5 - WB Outside Widening Area (Bridge over International DR)PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)
IIIBWBO-ST330PH IIIB - Curing for End Bent 5 - WB Outside Widening Area (Bridge over universal BLVD)PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)
IIIBWBO-ST410PH IIIB - Curing for End Bent 5 - WB Outside Widening Area (Bridge over International DR)PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)

The following original durations (OD) were changed since E8P02 Update No. 11

Activity IDActivity DescriptionCriticalOld ODNew OD
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)Yes2015
IBR-AP110PH IB - Asphalt - Structural - Ramp B/C GoreNo52
IBR-EW100PH IB - Embankment - Ramp B/C GoreYes225
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C GoreYes155
IBR-RW100PH IB - Stabilization - Ramp B/C GoreYes122
IBR-RW110PH IB - Base - Ramp B/C GoreYes224
IBR-TC100PH IB - Set Temp Traffic Barriers - Ramp B/C GoreYes52
IIAR-AP100PH IIB - Asphalt - Structural - Ramp OYes24
IIAR-EW100PH IIB - Embankment - Ramp OYes520
IIAR-RW100PH IIB - Stabilization - Ramp OYes24
IIAR-SP110PH IIB - Drainage - Ramp OYes320
IIBR-EW100PH IIB - Embankment - Ramp BYes222
IIBR-EW140PH IIB - Embankment - Ramp CYes204
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp CNo110
IIBR-ITS70PH IIB - Install CCTV's (1-8)Yes2016
IIBR-ITS80PH IIB - Install CCTV's (9-16)Yes2014
IIBR-ITS90PH IIB - Install CCTV's (17-22)Yes2010
IIBR-RW110PH IIB - Base - Ramp BYes2010
IIBR-RW280PH IIB - Shoulder Gutter - Ramp BYes101
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 311Yes510
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+50Yes1015
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+50Yes610
PRE-FA-001Fabricate and Deliver 506 Bridge Drainage SystemYes145
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption SystemsYes4230
PRE-FA-029Fabricate and Deliver 033000 Cast-In-Place ConcreteYes4221
PRE-FA-030Fabricate and Deliver 042200 MasonryYes4221
PRE-FA-033Fabricate and Deliver 101400 SignageYes4221
PRE-FA-037Fabricate and Deliver 233113 Ductwork Product Data and Shop DrawingYes4221
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)Yes72
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median WideningYes2015
IIBEBO-ST31PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)Yes1510
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)Yes1510
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp TYes23
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp TYes14
IIIBR-RW200PH IIIB - Stabilization - Ramp P to ShingleYes25
IIIBR-RW210PH IIIB - Base - Ramp P to ShingleYes810
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,DYes86
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB ExpressYes46
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB ExpressYes912
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB ExpressYes410
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB ExpressYes510
IVWBM-RW220PH IV - Base - Station 207 to 217 EB ExpressYes510
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB ExpressYes410
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB ExpressYes812
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)Yes204
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)Yes2214
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)Yes168
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside WideningYes1510
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)Yes2210
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)Yes2010
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)Yes2010
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)Yes2010
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)Yes86
IIIBWBO-ST390PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over International Drive)Yes2010
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)Yes124
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)Yes86
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)Yes52
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)Yes53
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)Yes153
IIIBWBO-ST690PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over International Drive)Yes1512

The following activities became critical since E8P02 Update No. 11

Activity IDActivity DescriptionOld TFNew TF
NA-GC100TEC Install and Test14-34
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas7-130
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C Gore150
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore150
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I81-3
IVR-IPM70PH IV - Install Post Mount Signs (1-70)25-36
IVR-IPM80PH IV - Install Post Mount Signs (71-145)25-36
IVR-IPM90PH IV - Install Post Mount Signs (146-230)25-36
IVR-SM660PH IV - Install Underdeck Lighting/Service (2 EA, OCCC Flyover)91-9
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)91-9
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)91-35
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)91-35
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)91-35
TF-CO-021Install Bollards22-26
TF-CO-026Cont. Lightning17-23
TF-CO-028F+1 Tolling Cabinets + Frames36-26
TF-CO-029Install Conduit/Raceways30-18
TF-CO-030Pull Wire14-23
TF-CO-031Toll Facility Finishes and Punchlist14-26
TF-CO-032Toll Facility CO14-26
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)38-13
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E42-36
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-132-3
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)7-73
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)7-73
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)114-11
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K9-3
IVR-IPM100PH IV - Install Post Mount Signs (231-349)25-36
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)72-16
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)88-16
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G44-36
IIIBR-GC210PH III C - Demo - old temp Ramp T gore63-22
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T63-22
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T63-22
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware7-73
IIIBR-RW190PH IIIB - Base - Ramp T63-22
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)75-41
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)75-34
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)75-32
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)75-32
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)75-3
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)75-3
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F14-32
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening48-12
IVWBM-GC100PH IV - Demo Temporary - WB Express34-30
IVWBM-RW110PH IV - Grade for road - Station 207 to 217 WB Express22-30
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express22-30
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB Express22-21
IVWBM-RW200PH IV - Grade for road - Station 207 to 217 EB Express22-29
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express22-29
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express22-30
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge50-41
IIBEBM-GC110PH IV - Rumble Strips - EB Median51-15
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening45-34
IIIBR-IBM110PH IIIB - Install Bridge Mount Signs25-36
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)96-16
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)7-53
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)7-53
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)7-53
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)7-53
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)7-73
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)7-73
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)7-73
IIIBR-ITS180PH IIIB - Pull FOC (JYP to TPK)7-73
IIIBR-ITS190PH IIIB - Splice/Terminate FOC7-73
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)7-72
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)7-72
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area21-33
IIIBWBO-ST500PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over International DR)67-34

The following relationship lags were changed since E8P02 Update No. 11

Activity IDActivity DescriptionRelationship TypePredecessor Activity IDPredecessor Activity DescriptionOld LagNew Lag
GC-GC110PH MS - Substantial CompletionFSIVWBO-PM110PH IV - Pavement Markings (Final) - WB Outside Widening Area010

Schedule Analysis

This table represents the longest path of E8P02 Update No 36.

Legend

Activities with negative total float

Activity IDActivity DescriptionStart DateFinish DateTotal Float
ITS10-1040Fabrication and Delivery - Conduits05-Oct-1819-Dec-18-130
ITS10-1090Furnish & Install - Conduit20-Dec-1818-Feb-19-130
ITS10-1120Modify existing cabinets to incorporate additional conduit19-Feb-1921-Feb-19-130
ITS10-1130Furnish & Install - Conductors22-Feb-1929-Mar-19-130
ITS10-1150Furnish & Install - Step Up / Step Down Transformers01-Apr-1916-Apr-19-130
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas17-Apr-1929-May-19-130
GC-GCN210PH MS - Punch List/Acceptance30-May-1928-Jun-19-190
GC-DP110PH MS - Project Completion28-Jun-19-190

This table compares the longest paths from both updates.

Legend

Activities added to the longest path Activities deleted from the longest path

Activity IDActivity DescriptionStart DateFinish DateTotal Float
IIAR110PH IIA - Construct Ramp O Diversion - Ramp O (Tie in to EB)07-Sep-1619-Sep-16-41
IIBEBO-ST110PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over Shingle Creek)19-Sep-1629-Sep-16-41
IIBEBO-ST650PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over Shingle Creek)29-Sep-1611-Oct-16-41
IIBEBO-ST670PH IIB - Demo Pile Cap - EB Outside Widening (Bridge over Shingle Creek)11-Oct-1618-Oct-16-41
IIBEBO-ST660PH IIB - Remove Beams - EB Outside Widening (Bridge over Shingle Creek)11-Oct-1618-Oct-16-41
IIBEBO-ST680PH IIB - Extract Piles - EB Outside Widening (Bridge over Shingle Creek)18-Oct-1608-Nov-16-41
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)08-Nov-1613-Dec-16-41
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)13-Dec-1612-Jan-17-39
IIBEBO-ST210PH IIB - Curing Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)12-Jan-1718-Jan-17-61
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr18-Jan-1720-Jan-17-37
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)20-Jan-1725-Jan-17-38
IIBEBO-ST310PH IIB - End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)26-Jan-1715-Feb-17-38
IIBEBO-ST740PH IIB - Curing for End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)16-Feb-1722-Feb-17-57
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)22-Feb-1710-Mar-17-39
IIBEBO-ST490PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over Shingle Creek)10-Mar-1707-Apr-17-39
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)07-Apr-1728-Apr-17-39
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)28-Apr-1711-May-17-39
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)12-May-1715-May-17-39
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)16-May-1725-May-17-39
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)26-May-1707-Jun-17-39
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)08-Jun-1714-Jun-17-39
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)15-Jun-1721-Jun-17-39
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)22-Jun-1713-Jul-17-39
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)14-Jul-1720-Jul-17-39
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)21-Jul-1703-Aug-17-39
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)03-Aug-1724-Aug-17-38
IIIBWBO-ST320PH IIIB - Curing for Pier 2, 3, (Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)24-Aug-1730-Aug-17-56
IIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl30-Aug-1731-Aug-17-40
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)31-Aug-1712-Sep-17-40
IIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)13-Sep-1703-Oct-17-40
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)04-Oct-1713-Oct-17-40
IIIBWBO-ST480PH IIIB - End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)16-Oct-1706-Nov-17-40
IIIBWBO-ST520PH IIIB - Curing for End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)07-Nov-1713-Nov-17-56
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)13-Nov-1704-Dec-17-38
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)04-Dec-1703-Jan-18-38
IIIBWBO-ST700PH IIIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - WB Outside Widening Area (Bridge over Shingle Creek)03-Jan-1825-Jan-18-38
IIIBWBO-ST120PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over Shingle Creek)25-Jan-1809-Feb-18-38
IIIBWBO-ST130PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over Shingle Creek)12-Feb-1812-Feb-18-38
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)13-Feb-1815-Feb-18-38
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)16-Feb-1821-Feb-18-38
GC-GCN160PH MS - Start Phase IV Construction22-Feb-18-38
IVEBM-TC100PH IV - Set Temp Traffic Barriers - EB Median Widening22-Feb-1827-Feb-18-38
IVEBM-GC100PH IV - Demo Temporary - EB Median Widening28-Feb-1806-Mar-18-38
IVEBM-W140PH IV - Median Wall - Grading for Station 1 (I4 to International Drive)07-Mar-1808-Mar-18-38
IVEBM-W150PH IV - Median Wall - FFP Footing/Stem for Station 1 (I4 to International Drive)09-Mar-1822-Mar-18-38
IVEBM-W160PH IV - Median Wall - Construct/ slip Top for Station 1 (I4 to International Drive)23-Mar-1829-Mar-18-38
IVEBM-W170PH IV - Median Wall - Grading for Station 2 (International Drive to Universal)30-Mar-1806-Apr-18-38
IVEBM-W180PH IV - Median Wall - FFP Footing/Stem for Station 2 (International Drive to Universal)09-Apr-1827-Apr-18-38
IVEBM-W190PH IV - Median Wall - Construct/ slip Top for Station 2 (International Drive to Universal)30-Apr-1804-May-18-38
IVEBM-W200PH IV - Median Wall - Grading for Station 3 (Universal to JYP)07-May-1818-May-18-38
IVEBM-W210PH IV - Median Wall - FFP Footing/Stem for Station 3 (Universal to JYP)21-May-1804-Jun-18-38
IVEBM-W220PH IV - Median Wall - Construct/ slip Top for Station 3 (Universal to JYP)05-Jun-1812-Jun-18-38
IVWBM-RW130PH IV - Grade for Station 3 (Universal to JYP) (B)13-Jun-1819-Jun-18-38
IVWBM-RW140PH IV - Stabilization for Station 3 (Universal to JYP) (A)20-Jun-1825-Jun-18-38
IVWBM-RW150PH IV - Base for Station 3 (Universal to JYP) (B)26-Jun-1809-Jul-18-38
IVWBM-AP100PH IV - Asphalt - Structural - WB Median Widening10-Jul-1813-Jul-18-38
ITS10-1040Fabrication and Delivery - Conduits05-Oct-1819-Dec-18-130
ITS10-1090Furnish & Install - Conduit20-Dec-1818-Feb-19-130
ITS10-1120Modify existing cabinets to incorporate additional conduit19-Feb-1921-Feb-19-130
ITS10-1130Furnish & Install - Conductors22-Feb-1929-Mar-19-130
ITS10-1150Furnish & Install - Step Up / Step Down Transformers01-Apr-1916-Apr-19-130
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas17-Apr-1929-May-19-130
GC-GCN210PH MS - Punch List/Acceptance30-May-1928-Jun-19-190
GC-DP110PH MS - Project Completion28-Jun-19-190
Activity IDActivity DescriptionTotal Float
GC-DP110PH MS - Project Completion-190
GC-GC110PH MS - Substantial Completion-160
IIICR120PH IIIC - Shift traffic to new Ramp F / Remove Diversion/Construct Ramp Shoulder/Gore - Ramp F-11
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N-30
IIICR180PH IIIC - Remove Diversion - Ramp T-7
NA-GC100TEC Install and Test-34
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas-130
GC-GCN210PH MS - Punch List/Acceptance-190
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C Gore0
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore0
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I-3
IVR-IPM70PH IV - Install Post Mount Signs (1-70)-36
IVR-IPM80PH IV - Install Post Mount Signs (71-145)-36
IVR-IPM90PH IV - Install Post Mount Signs (146-230)-36
IVR-SM660PH IV - Install Underdeck Lighting/Service (2 EA, OCCC Flyover)-9
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)-9
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)-35
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)-35
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)-35
TF-CO-021Install Bollards-26
TF-CO-026Cont. Lightning-23
TF-CO-028F+1 Tolling Cabinets + Frames-26
TF-CO-029Install Conduit/Raceways-18
TF-CO-030Pull Wire-23
TF-CO-031Toll Facility Finishes and Punchlist-26
TF-CO-032Toll Facility CO-26
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)-13
IIBR-AP100PH IIB - Asphalt - Structural - Ramp B-39
IIBR-EW100PH IIB - Embankment - Ramp B-39
IIBR-GC100PH IIB - Demo - Ramp B-39
IIBR-GC120PH IIB - Performance Turf, SOD - Ramp B-39
IIBR-GC160PH IIB - Guardrail (Roadway) - Ramp B-39
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E-36
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-1-3
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)-73
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)-73
IIBR-RW100PH IIB - Stabilization - Ramp B-39
IIBR-RW110PH IIB - Base - Ramp B-39
IIBR-RW280PH IIB - Shoulder Gutter - Ramp B-39
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)-11
IIBR-SP100PH IIB - Drainage - Ramp B-39
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B-39
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B-39
IICR-RW350PH IIC - Complete Widening - Ramp I-1-3
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K-3
ITS10-1040Fabrication and Delivery - Conduits-130
ITS10-1070Fabrication & Delivery - ITS Standby Generators-102
ITS10-1080Furnish & Install ITS Standby Generators-102
ITS10-1090Furnish & Install - Conduit-130
ITS10-1100ITS Generator Stand AloneTesting-102
ITS10-1110Fabrication and Delivery - Conductors-67
ITS10-1120Modify existing cabinets to incorporate additional conduit-130
ITS10-1130Furnish & Install - Conductors-130
ITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers-36
ITS10-1150Furnish & Install - Step Up / Step Down Transformers-130
ITS10-1160Furnish & Install - FOC Drops-127
ITS10-1170Splice / Terminate FOC Drops-127
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 217-30
IVEBM-W150PH IV - Median Wall - FFP Stem Station 207 to 217-30
IVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 217-30
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+50-41
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+50-41
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+50-41
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 332-4
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 352-22
IVML-AP130PH IV - Asphalt - Friction - from Consulate to JYP incl Ramps Q to V-1
IVR-IPM100PH IV - Install Post Mount Signs (231-349)-36
IAWBO-EW100PH IA - Pond EXCAVATION (Shape 4A & 5A) - WB Outside Widening Area-35
IBWBO-EW100PH IB - Pond Excav/Embank JYP to TPK - WB Outside Widening-36
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)-16
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)-16
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G-36
IIIBR-GC210PH III C - Demo - old temp Ramp T gore-22
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T-22
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T-22
IIIBR-GC400PH IIIB - Guardrail (Roadway) - WB outside 337-340 + old Ramp T-22
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware-73
IIIBR-RW110PH IIIB - Base - Ramp G-36
IIIBR-RW190PH IIIB - Base - Ramp T-22
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)-41
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)-34
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)-32
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)-32
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)-3
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)-3
IIICR-AP120PH IIIC - Mill and Resurface - Ramp F/G at I-Drive-33
IIICR-GC100PH IIIC - Demo - Old Ramp F-7
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F-32
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F-33
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express-41
IVEBM-AP120PH IV - Asphalt - Structural - Station 311 to 352 EB Express-15
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express-35
IVEBM-PM110PH IV - Tubular Delineators - EB Express Divider-35
IVEBM-PM120PH IV - Pavement Markings (Final) - EB Express Widening-37
IVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening-41
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D-36
IVEBO-AP110PH IV - Asphalt - Friction - All ramps E thru P-34
IVEBO-AP120PH IV - Asphalt - Friction - EB Express lanes to JYP-42
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening-31
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening-12
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express-25
IVWBM-AP130PH IV - Asphalt - Structural - Station 311 to 352 WB Express-22
IVWBM-GC100PH IV - Demo Temporary - WB Express-30
IVWBM-PM110PH IV - Tubular Delineators - WB Express Divider-24
IVWBM-PM130PH IV - Pavement Markings (Final) - WB Express Widening-11
IVWBM-RW110PH IV - Grade for road - Station 207 to 217 WB Express-30
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express-25
IVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express-25
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express-25
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express-30
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB Express-21
IVWBM-RW200PH IV - Grade for road - Station 207 to 217 EB Express-29
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express-29
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express-30
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express-41
IVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express-41
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express-41
IVWBM-RW285PH IV - Grade for road - Station 311 to 332 EB Express-12
IVWBM-RW290PH IV - Stabilization - Station 311 to 332 EB Express-12
IVWBM-RW300PH IV - Base - Station 311 to 332 EB Express-4
IVWBM-RW305PH IV - Grade for road - Station 335 to 352 EB Express-12
IVWBM-RW310PH IV - Stabilization - Station 335 to 352 EB Express-12
IVWBM-RW320PH IV - Base - Station 335 to 352 EB Express-15
IVWBM-RW330PH IV - Stabilization - Station 311 to 332 WB Express-17
IVWBM-RW340PH IV - Base - Station 311 to 332 WB Express-17
IVWBM-RW350PH IV - Grade for road - Station 311 to 332 WB Express-17
IVWBM-RW360PH IV - Stabilization - Station 335 to 352 WB Express-22
IVWBM-RW370PH IV - Base - Station 335 to 352 WB Express-22
IVWBM-RW380PH IV - Grade for road - Station 335 to 352 WB Express-22
IVWBM-TC100PH IV - Set Temp Traffic Barriers - WB Median Widening-30
IVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening-25
IVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening-25
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C-42
IVWBO-AP110PH IV - Asphalt - Friction - WB Express lanes from JYP to I-4-24
IVWBO-PM110PH IV - Pavement Markings (Final) - WB Outside Widening Area-31
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge-41
IIBEBM-GC110PH IV - Rumble Strips - EB Median-15
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening-34
IIIBR-IBM110PH IIIB - Install Bridge Mount Signs-36
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)-16
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)-53
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)-53
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)-53
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)-53
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)-73
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)-73
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)-73
IIIBR-ITS180PH IIIB - Pull FOC (JYP to TPK)-73
IIIBR-ITS190PH IIIB - Splice/Terminate FOC-73
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)-72
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)-72
IIIBR-ITS1030PH IIIB - Pull Conductors (I-4 to International)-73
IIIBR-ITS1040PH IIIB - Pull Conductors (International to Univ)-73
IIIBR-ITS1050PH IIIB - Pull Conductors (UNIV to JYP)-73
IIIBR-ITS1060PH IIIB - Pull Conductors (JYP to TPK)-73
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area-33
IIIBWBO-ST500PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over International DR)-34

The following actual start dates were added in E8P02 Update No 36

Activity IDActivity DescriptionActual Start
GC-GCN100PH MS - Construction Mobilization19-Aug-15
PRE-PS-002Prepare and Submit 455 Pile Installation Plan (Structures 750089 & 750216-Universal/Orangewood)20-Sep-15
PRE-PS-003Prepare and Submit 455 Pile Installation Plan (Structures 750091 & 750218-John Young Parkway)20-Sep-15
PRE-PS-004Prepare and Submit 455 Pile Installation Plan (Structure 750629- Ramp S JYP)20-Sep-15
PRE-PS-005Prepare and Submit 455 Pile Installation Plan (Structure 750630- Ramp T JYP)20-Sep-15
IAR-TC140PH IA - Set Temp Traffic Barriers for Phase IB - EB Median Widening29-Oct-15
IBEBM-ST100PH IB - Construct Crane Access - EB Median Widening (Bridge over Shingle Creek)05-Nov-15
GC-GCN120PH MS - Start Phase IB Construction20-Nov-15
PRE-FA-00147Fabricate and Deliver 455 Structure Foundations Steel Pile HP 12X53 (Structure 750629-Ramp S JYP)17-Jan-16
IBWBM-SP110PH IB - Drainage for JYP to STA 39018-Feb-16
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)21-Feb-16
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)21-Feb-16
PRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)21-Feb-16
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)21-Feb-16
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)21-Feb-16
IAEBO-W130PH IA - Noise/Sound Wall Prep Work (W-2) - EB Outside Widening22-Feb-16
IAEBO-GC130PH IA - Clear & Grub - EB Outside Widening (I-4 to Ramp H)22-Feb-16
IBEBM-ST390PH IB - Curing for Pier 2, 3, (Pile Cap) - EB Median Widening (Bridge over Shingle Creek)24-Feb-16
IBEBM-ST260PH IB - Demo Traffic Rails - EB Median Widening (Bridge over universal BLVD)29-Feb-16
IBEBM-ST900PH IB - Demo Bridge Deck - EB Median Widening (Bridge over universal BLVD)29-Feb-16
IBWBM-ST180PH IB - Demo Traffic Rail / End Bents - WB Median Widening (Bridge over universal BLVD)29-Feb-16
IIDEBO-ST100PH IID - Construct Crane Access - EB Outside Widening (Bridge over John Young PKWY)29-Feb-16
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)01-Mar-16
PRE-RA-007Review and Approve 400 Concrete Structures (Bearing Pads)02-Mar-16
IBR-IDS10PH IB - Install Drilled Shafts (1-13)04-Mar-16
IIIBWBO-SP110PH IIIB - Drainage (Universal - International) - WB Outside Widening Area (SR528)07-Mar-16
PRE-FA-007Fabricate and Deliver 400 Concrete Structures (Bearing Pads)09-Mar-16
IBEBM-ST270PH IB - Test Pile - EB Median Widening (Bridge over universal BLVD)10-Mar-16
IBEBM-ST290PH IB - Production Pile - EB Median Widening (Bridge over universal BLVD)10-Mar-16
IBWBM-ST210PH IB - Production Pile Concrete - WB Median Widening (Bridge over universal BLVD)10-Mar-16
IBEBM-ST150PH IB - Demo Traffic Rails - EB Median Widening (Bridge over International DR)14-Mar-16
IBEBM-ST890PH IB - Demo Bridge Deck - EB Median Widening (Bridge over International DR)14-Mar-16
IBWBM-ST120PH IB - Demo Traffic Rail - WB Median Widening (Bridge over International DR)14-Mar-16
IBWBM-ST730PH IB - Demo Bridge Deck - WB Median Widening (Bridge over International DR)14-Mar-16
IBEBM-ST140PH IB - Construct Crane Access - EB Median Widening (Bridge over International DR)17-Mar-16
IBWBM-ST110PH IB - Construct Crane Access - WB Median Widening (Bridge over International DR)17-Mar-16
IBWBO-SP140PH IB - Jack & Bore JYP to Int. Dr. (Sta 354+04 to 234+50)17-Mar-16
IIBEBO-ST21PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge 750629 Ramp S over JYP)17-Mar-16
IIDEBO-ST120PH IID - Temp Sheet Pile - EB Outside Widening (Bridge over John Young PKWY)18-Mar-16
PRE-PS-049Prepare and Submit 639 ITS Standby Generator Product Data and Shop Drawing21-Mar-16
IBWBM-ST710PH IB - Demo Bridge Deck- WB Median Widening (Bridge over universal BLVD)22-Mar-16
IBEBM-ST230PH IB - Production Pile - EB Median Widening (Bridge over International DR)28-Mar-16
IBWBM-ST130PH IB - Test Pile H-Piles - WB Median Widening (Bridge over International DR)28-Mar-16
IBWBM-ST150PH IB - Production Pile - WB Median Widening (Bridge over International DR)28-Mar-16
PRE-RA-049Review and Approve 639 ITS Standby Generator Product Data and Shop Drawing30-Mar-16
IIIAWBO-ST18PH IIIA - Production Pile (H Piles) (1-32) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)04-Apr-16
IIICR-EW100PH IIIC - Embankment - Ramp F05-Apr-16
IIIAWBO-ST27PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over John Young PKWY)05-Apr-16
IIIAWBO-ST31PH IIIA - Production Pile (H Piles) - WB Outside Widening Area (Bridge over John Young PKWY)07-Apr-16
IBWBO-SP100PH IB - Jack & Bore JYP Interchange (Sta 354 +04)11-Apr-16
IBWBM-SP100PH IB - Drainage for JYP Interchange (Sta 354 +04)12-Apr-16
IBWBM-SP120PH IB - Drainage for JYP to Int. Dr. (Sta 354+04 to 234+50)12-Apr-16
IIIAWBO-ST19PH IIIA - Production Pile (H Piles) (33-65) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Apr-16
PRE-PS-015Prepare and Submit 548 Retaining/MSE Wall Systems17-Apr-16
IBEBM-ST330PH IB - Wall Bent 1 - EB Median Widening (Bridge over International DR)18-Apr-16
IBEBM-ST370PH IB - End Bent 1 - EB Median Widening (Bridge over International DR)18-Apr-16
IBWBM-ST280PH IB - Wall Bent 1 - WB Median Widening (Bridge over International DR)18-Apr-16
IBWBM-ST290PH IB - End Bent 1 - WB Median Widening (Bridge over International DR)18-Apr-16
IIBEBO-ST23PH IIB - Production Pile (H Piles) (32-62) -EB Outside Widening (Bridge 750629 Ramp S over JYP)18-Apr-16
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area18-Apr-16
IBEBM-ST710PH IB - End Bent 3 - EB Median Widening (Bridge over universal BLVD)20-Apr-16
IBWBM-ST570PH IB - End Bent 3 - WB Median Widening (Bridge over universal BLVD)20-Apr-16
IBEBM-ST430PH IB - End Bent 1 - EB Median Widening (Bridge over Shingle Creek)28-Apr-16
IAEBO-W110PH IA - Install Posts (1-101)- EB Outside Widening29-Apr-16
PRE-RA-015Review and Approve 548 Retaining/MSE Wall Systems29-Apr-16
PRE-PS-020Prepare and Submit 992 Under deck Lighting02-May-16
IBEBM-ST480PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over John Young PKWY)05-May-16
IBEBM-ST530PH IB - End Bent 4 - EB Median Widening (Bridge over Shingle Creek)05-May-16
IBWBM-ST330PH IB - End Bent 3 - WB Median Widening (Bridge over International DR)05-May-16
IBWBM-ST450PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over John Young PKWY)05-May-16
IIDEBO-ST170PH IID - Temp Sheet Pile Removal - EB Outside Widening (Bridge over John Young PKWY)05-May-16
IIIAWBO-ST17PH IIIA - Temp Sheet Pile - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)05-May-16
IBEBM-ST360PH IB - Pier 2, 3, 4(F/R/P) ( Pier Cap) - EB Median Widening (Bridge over John Young PKWY)06-May-16
IBEBM-ST700PH IB - Wall Bent 3 - EB Median Widening (Bridge over universal BLVD)06-May-16
IBWBM-ST550PH IB - Wall Bent 3 - WB Median Widening (Bridge over universal BLVD)06-May-16
IAEBO-W120PH IA - Install Posts (102- 203) - EB Outside Widening09-May-16
IIBR-SM480PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)09-May-16
IBEBM-ST380PH IB - Wall Bent 3 - EB Median Widening (Bridge over International DR)09-May-16
IBEBM-ST410PH IB - End Bent 3 - EB Median Widening (Bridge over International DR)09-May-16
IBWBM-ST320PH IB - Wall Bent 3 - WB Median Widening (Bridge over International DR)09-May-16
IBEBM-ST970PH IB - Curing for End Bent 3 - EB Median Widening (Bridge over universal BLVD)10-May-16
IBEBM-W100PH IB - Median Wall - Grading (JYP to TPK)11-May-16
IBEBM-ST420PH IB - Curing for End Bent 3 - EB Median Widening (Bridge over International DR)12-May-16
PRE-RA-020Review and Approve 992 Under deck Lighting13-May-16
IBWBM-ST750PH IB - Curing for End Bent 3 - WB Median Widening (Bridge over International DR)13-May-16
PRE-PS-021Prepare and Submit 05500 Metal Fabrications16-May-16
IBEBM-ST200PH IB - Temp Sheet Pile - EB Median Widening (Bridge over International DR)16-May-16
IBWBM-ST140PH IB - Temp Sheet Pile - WB Median Widening (Bridge over International DR)16-May-16
IBWBM-ST760PH IB - Curing for End Bent 3 - WB Median Widening (Bridge over universal BLVD)16-May-16
IIBEBO-ST31PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)16-May-16
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)16-May-16
IAEBO-W140PH IA - Install Posts (204-305) - EB Outside Widening18-May-16
IIBR-EW122PH IIB - Embankment - Ramp A18-May-16
IBEBM-ST250PH IB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Median Widening (Bridge over International DR)18-May-16
IBEBM-ST980PH IB - Curing for End Bent 4 - EB Median Widening (Bridge over Shingle Creek)18-May-16
IBEBM-W110PH IB - Median Wall - FFP Footing/Stem (JYP to TPK)20-May-16
IIBR-EW120PH IIB - Embankment - Ramp S-123-May-16
IIIAWBO-ST30PH IIIA - Temp Sheet Pile - WB Outside Widening Area (Bridge over John Young PKWY)25-May-16
IAEBO-W150PH IA - Install Posts (306- 409) - EB Outside Widening26-May-16
PRE-PS-006Prepare and Submit Precast Erection03-Jun-16
PRE-PS-022Prepare and Submit 133420 Pre-Engineered Precast Concrete Structure03-Jun-16
IBEBM-W130PH IB - Wire (mse) Retaining Wall TW 18 - EB Median Widening (SR528)06-Jun-16
IBEBM-W140PH IB - Wire (mse) Retaining Wall TW 20 - EB Median Widening (SR528)06-Jun-16
IBR-IHM300PH IB - Install High Mast/Service (1-3)06-Jun-16
IBWBM-W120PH IB - Wire (mse) Retaining Wall TW 19 - WB Median Widening (SR528)06-Jun-16
IBWBM-W140PH IB - Wire (mse) Retaining Wall TW 21 - WB Median Widening (SR528)06-Jun-16
IBEBM-ST850PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over universal BLVD)06-Jun-16
IBWBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening06-Jun-16
PRE-RA-021Review and Approve 05500 Metal Fabrications08-Jun-16
IBEBM-ST280PH IB - Temp Sheet Pile - EB Median Widening (Bridge over universal BLVD)08-Jun-16
IBWBM-ST200PH IB - Temp Sheet Pile - WB Median Widening (Bridge over universal BLVD)08-Jun-16
IAEBO-IL100PH IA - Temp. ITS Relocate Existing - EB Outside Widening (SR528)09-Jun-16
IIBEBO-ST3PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge over International DR)13-Jun-16
IIBR-GC171PH IIB - Clear & Grub/Demo - Ramp A13-Jun-16
IIBR-SP121PH IIB - Drainage - Ramp A13-Jun-16
IBEBM-ST520PH IB - Wall Bent 5 - EB Median Widening (Bridge over John Young PKWY)13-Jun-16
IBEBM-ST560PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over International DR)13-Jun-16
IBEBM-ST570PH IB - End Bent 5 - EB Median Widening (Bridge over John Young PKWY)13-Jun-16
IBWBM-ST400PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over International DR)13-Jun-16
IBWBM-ST490PH IB - Wall Bent 5 - WB Median Widening (Bridge over John Young PKWY)13-Jun-16
IBWBM-ST530PH IB - End Bent 5 - WB Median Widening (Bridge over John Young PKWY)13-Jun-16
IBEBM-TC210PH IB - Construct Diversion at Shingle Creek- EB Median Widening20-Jun-16
IAEBO-W160PH IA - Install Panels (0-32000 SF) - EB Outside Widening27-Jun-16
IBWBM-W100PH IB - Median Wall - Construct/ slip Top (JYP to TPK)27-Jun-16
IIIBWBO-ST3PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over International DR)27-Jun-16
IAEBO-W170PH IA - Install Panels (32000-64000 SF) - EB Outside Widening29-Jun-16
IAEBO-W180PH IA - Install Panels (64000-96000 SF)- EB Outside Widening05-Jul-16
IIBR-RW141PH IIB - Stabilization - Ramp A05-Jul-16
IIAR-SP100PH IIA - Jack & Bore (42" (Sta 351+00 near Duke energy access platform) - Ramp O06-Jul-16
IAEBO-SP100PH IA - Jack & Bore 42" (Sta 351+00 near Duke energy access platform) - EB Outside Widening (SR528)06-Jul-16
IAEBO-W190PH IA - Install Panels (96000-128000 SF)- EB Outside Widening08-Jul-16
IIAR100PH IIA - Construct Ramp O Diversion - Ramp O11-Jul-16
IBEBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening11-Jul-16
IAEBO-W200PH IA - Install Panels (128000-160000 SF) - EB Outside Widening12-Jul-16
IBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening13-Jul-16
IBEBM-RW280PH IB - Base (I4-International Drive) - EB Median Widening13-Jul-16
IBEBM-ST800PH IB - Approach Slabs - EB Median Widening (Bridge over Shingle Creek)13-Jul-16
IBWBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening13-Jul-16
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)13-Jul-16
IIBR-RW151PH IIB - Base - Ramp A14-Jul-16
IIBEBO-ST1PH IIB - Construct Crane Access - EB Outside Widening (Bridge over International DR)18-Jul-16
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems18-Jul-16
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening18-Jul-16
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening18-Jul-16
IBWBM-RW240PH IB - Pavement for Permanent Shoulder Construction (Universal-International Drv.) - WB Median Widening18-Jul-16
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)18-Jul-16
IIIBWBO-ST1PH IIIB - Construct Crane Access - WB Outside Widening Area (Bridge over International DR)18-Jul-16
IBEBM-ST720PH IB - Curing for End Bent 5 - EB Median Widening (Bridge over John Young PKWY)22-Jul-16
IBWBM-ST740PH IB - Curing for End Bent 5 - WB Median Widening (Bridge over John Young PKWY)22-Jul-16
IAEBO-SP110PH IA - Drainage (42") @ JYP Interchange - EB Outside Widening (SR528)25-Jul-16
IBEBM-ST320PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over International DR)25-Jul-16
IBWBM-ST270PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over International DR)25-Jul-16
IIAR-SP110PH IIB - Drainage - Ramp O26-Jul-16
IIBEBO-ST8PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge over International DR)26-Jul-16
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)26-Jul-16
IIBR-SM470PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)26-Jul-16
PRE-RA-044Review and Approve 633 ITS Fiber Optic Cable26-Jul-16
IBEBM-ST640PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over universal BLVD)26-Jul-16
IBWBM-ST510PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over universal BLVD)26-Jul-16
IIBR-ITS30PH IIB - Install Conduit/Boxes (Univ to JYP)27-Jul-16
IIBR-SM440PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (A)27-Jul-16
IBEBM-ST300PH IB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Median Widening (Bridge over International DR)27-Jul-16
IBWBM-ST220PH IB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Median Widening (Bridge over International DR)27-Jul-16
IIIBWBO-ST9PH IIIB - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over International DR)27-Jul-16
IIBR151PH IIB - Construct Ramp L Diversion - Ramp L28-Jul-16
PRE-PS-041Prepare and Submit 682 CCTV Camera01-Aug-16
PRE-PS-045Prepare and Submit 660 ITS Vehicle Detection System01-Aug-16
PRE-PS-046Prepare and Submit 684 ITS Managed Ethernet Hub Switch01-Aug-16
PRE-PS-047Prepare and Submit 785 ITS Uninterruptible Power Source (UPS)01-Aug-16
IIBEBO-ST28PH IIB - Construct Crane Access - EB Outside Widening (Bridge over Shingle Creek)01-Aug-16
IBEBM-ST440PH IB - Curing For Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Median Widening (Bridge over John Young PKWY)02-Aug-16
IBWBM-ST370PH IB - Curing For Pier 2, 3, 4(Footer, Column & Pier Cap) - WB Median Widening (Bridge over John Young PKWY)02-Aug-16
PRE-FA-047Fabricate and Deliver 685 ITS Uninterruptible Power Source (UPS)03-Aug-16
PRE-RA-041Review and Approve 682 CCTV Camera03-Aug-16
PRE-RA-045Review and Approve 660 ITS Vehicle Detection System03-Aug-16
PRE-RA-046Review and Approve 684 ITS Managed Ethernet Hub Switch03-Aug-16
PRE-RA-047Review and Approve 685 ITS Uninterruptible Power Source (UPS)03-Aug-16
IBEBM-ST510PH IB - End Bent 1 - EB Median Widening (Bridge over John Young PKWY)03-Aug-16
IBEBM-ST810PH IB - Grind and Groove - EB Median Widening (Bridge over Shingle Creek)03-Aug-16
IBWBM-ST460PH IB - End Bent 1 - WB Median Widening (Bridge over John Young PKWY)03-Aug-16
IBEBM-ST610PH IB - Curing for Pier 2,(Footer, Column & Pier Cap) - EB Median Widening (Bridge over Universal BLVD)04-Aug-16
IBEBM-ST990PH IB - Bolt/Pin Temp B/W - EB Median Widening (Bridge over Shingle Creek)04-Aug-16
IBEBO-SP150PH IB - Drainage (Pond 5C @ John Young) - EB Outside Widening (Ponds)04-Aug-16
IBWBM-ST480PH IB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Median Widening (Bridge over Universal BLVD)04-Aug-16
IIBEBO-ST6PH IIB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over International DR)05-Aug-16
IBEBM-ST490PH IB - Wall Bent 1 - EB Median Widening (Bridge over John Young PKWY)05-Aug-16
IBWBM-ST420PH IB - Wall Bent 1 - WB Median Widening (Bridge over John Young PKWY)05-Aug-16
PRE-PS-001Prepare and Submit 506 Bridge Drainage System08-Aug-16
IBWBM-ST190PH IB - Test Pile Concrete - WB Median Widening (Bridge over universal BLVD)10-Aug-16
IIIAWBO-ST35PH IIIA - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over John Young PKWY)10-Aug-16
IIIAWBO-ST23PH IIIA - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)11-Aug-16
IIBEBO-ST27PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge 750629 Ramp S over JYP)12-Aug-16
IIIBWBO-ST6PH IIIB - Construct Crane Access - WB Outside Widening Area (Bridge over universal BLVD)15-Aug-16
IBEBM-ST680PH IB - End Bent 1 - EB Median Widening (Bridge over universal BLVD)18-Aug-16
IBWBM-ST540PH IB - End Bent 1 - WB Median Widening (Bridge over universal BLVD)18-Aug-16
IIBEBO-ST9PH IIB - Construct Crane Access - EB Outside Widening (Bridge over universal BLVD)22-Aug-16
PRE-FA-016Fabricate and Deliver 641 Prestressed Concrete Poles22-Aug-16
PRE-FA-024Fabricate and Deliver 633 Communication Cable22-Aug-16
PRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes22-Aug-16
PRE-FA-041Fabricate and Deliver 682 CCTV Camera22-Aug-16
PRE-FA-044Fabricate and (Ready to) Deliver 783 ITS Fiber Optic Cable22-Aug-16
PRE-FA-046Fabricate and Deliver 784 ITS Managed Ethernet Hub Switch22-Aug-16
PRE-FA-049Fabricate and Deliver 262913 ITS Standby Generator Product Data and Shop Drawing22-Aug-16
PRE-PS-042Prepare and Submit 781 DMS22-Aug-16
PRE-RA-042Review and Approve 781 DMS25-Aug-16
IBEBM-ST650PH IB - Wall Bent 1 - EB Median Widening (Bridge over universal BLVD)02-Sep-16
IBWBM-ST520PH IB - Wall Bent 1 - WB Median Widening (Bridge over universal BLVD)02-Sep-16
IBWBM-ST620PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over John Young PKWY)06-Sep-16
IIAR110PH IIA - Construct Ramp O Diversion - Ramp O (Tie in to EB)07-Sep-16
IIAR-TC140PH IIA - Temp Striping New Ramp Alignment - Ramp O07-Sep-16
IIAEBO-TC120PH IIA - MOT Shift for Phase IIA - EB Outside Widening07-Sep-16
IBEBO-GC100PH IB - Remove Existing Overhead Sign (sta 356+25) & Foundation - EB Outside Widening08-Sep-16
IBWBO-GC100PH IB - Remove Existing Overhead Sign (sta 356+25) & Foundation - WB Outside Widening Area08-Sep-16
IIIBWBO-ST7PH IIIB - Test Pile - WB Outside Widening Area (Bridge over universal BLVD)08-Sep-16
IBEBM-ST740PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over John Young PKWY)12-Sep-16
IIIBWBO-ST10PH IIIB - Production Pile - WB Outside Widening Area (Bridge over universal BLVD)12-Sep-16
IIBR-GC191PH IIB - Performance Turf, SOD - Ramp A13-Sep-16
IIBR-IDS20PH IIB - Install Drilled Shafts (14-35)14-Sep-16
IBWBM-ST660PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over universal BLVD)15-Sep-16
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening15-Sep-16
GC-GCN130PH MS - Start Phase IIA Construction19-Sep-16
IIDEBO-ST150PH IID - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)21-Sep-16
IIIAWBO-ST21PH IIIA - Curing for Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)21-Sep-16
IIIAWBO-ST33PH IIIA - Curing of Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)21-Sep-16
PRE-PS-029Prepare and Submit 033000 Cast-In-Place Concrete26-Sep-16
IBEBM-ST660PH IB - Set Beams - EB Median Widening (Bridge over John Young PKWY)27-Sep-16
IBWBM-ST560PH IB - Set Beams - WB Median Widening (Bridge over John Young PKWY)27-Sep-16
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)28-Sep-16
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening03-Oct-16
GC-GCN140PH MS - Start Phase II B Construction04-Oct-16
IICR-EW100PH IIC - Embankment - Ramp S-204-Oct-16
IIBEBO-ST10PH IIB - Test Pile - EB Outside Widening (Bridge over universal BLVD)10-Oct-16
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility10-Oct-16
IIBEBO-ST110PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over Shingle Creek)10-Oct-16
IBEBM-ST750PH IB - Set Beams - EB Median Widening (Bridge over Universal BLVD)11-Oct-16
IBWBM-ST590PH IB - Set Beams - WB Median Widening (Bridge over Universal BLVD)11-Oct-16
IIBEBO-ST650PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over Shingle Creek)11-Oct-16
IIBEBO-ST660PH IIB - Remove Beams - EB Outside Widening (Bridge over Shingle Creek)11-Oct-16
IIBEBO-ST670PH IIB - Demo Pile Cap - EB Outside Widening (Bridge over Shingle Creek)12-Oct-16
IBEBM-ST450PH IB - Set Beams - EB Median Widening (Bridge over International Drive)13-Oct-16
IBWBM-ST350PH IB - Set Beams - WB Median Widening (Bridge over International Drive)13-Oct-16
IIBEBO-ST680PH IIB - Extract Piles - EB Outside Widening (Bridge over Shingle Creek)13-Oct-16
IIBEBO-ST11PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge over universal BLVD)17-Oct-16
IIBEBO-ST12PH IIB - Production Pile - EB Outside Widening (Bridge over universal BLVD)17-Oct-16
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)17-Oct-16
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)17-Oct-16
IIIBR-SM610PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)17-Oct-16
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)17-Oct-16
PRE-PS-031Prepare and Submit 081100 Metal Doors and Frames19-Oct-16
PRE-PS-032Prepare and Submit 099100 Painting Product Data and Sample19-Oct-16
IBEBM-ST670PH IB - Superstructure Deck - EB Median Widening (Bridge over John Young PKWY)21-Oct-16
IBEBM-ST460PH IB - Superstructure Deck - EB Median Widening (Bridge over International Drive)24-Oct-16
IBEBM-ST760PH IB - Superstructure Deck - EB Median Widening Bridge over Universal BLVD)24-Oct-16
IBWBM-ST360PH IB - Superstructure Deck - WB Median Widening (Bridge over International Drive)24-Oct-16
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)24-Oct-16
PRE-RA-029Review and Approve 033000 Cast-In-Place Concrete26-Oct-16
PRE-RA-031Review and Approve 081100 Metal Doors and Frames26-Oct-16
PRE-RA-032Review and Approve 099100 Painting Product Data and Sample26-Oct-16
IBWBM-RW130PH IB - Grade (JYP-Universal) - WB Median Widening26-Oct-16
IBWBM-RW220PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening27-Oct-16
IIBR-IHM310PH IIB - Install High Mast/Service (4-6)27-Oct-16
IBWBM-RW140PH IB - Stabilization (JYP-Universal) - WB Median Widening28-Oct-16
IIIBWBO-ST8PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over universal BLVD)28-Oct-16
IIBEBO-ST14PH IIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)31-Oct-16
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening01-Nov-16
IIIBWBO-ST11PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)01-Nov-16
IBWBM-RW150PH IB - Base (JYP-Universal) - WB Median Widening03-Nov-16
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)07-Nov-16
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)07-Nov-16
IAWBO-SP110PH IA - Drainage (42") @ JYP Interchange - WB Outside Widening Area (SR528)10-Nov-16
IIBEBO-ST25PH IIB - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)14-Nov-16
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening15-Nov-16
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening16-Nov-16
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening17-Nov-16
PRE-PS-023Prepare and Submit 263213 Engine Generator18-Nov-16
IBWBM-ST580PH IB - Superstructure Deck - WB Median Widening (Bridge over John Young PKWY)18-Nov-16
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-121-Nov-16
IIBR-EW160PH IIB - Embankment - Ramp H28-Nov-16
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)02-Dec-16
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H06-Dec-16
IBWBM-ST600PH IB - Superstructure Deck - WB Median Widening Bridge over Universal BLVD)06-Dec-16
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E07-Dec-16
IIBEBO-ST16PH IIB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)08-Dec-16
IIIBWBO-ST12PH IIIB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)08-Dec-16
IBWBM-RW160PH IB - Grade (Universal-International Drv.) - WB Median Widening14-Dec-16
IBWBM-RW170PH IB - Stabilization (Universal-International Drv.) - WB Median Widening14-Dec-16
IBWBM-RW180PH IB - Base (Universal-International Drv.) - WB Median Widening14-Dec-16
IBWBM-RW190PH IB - Grade (International Drive-I4) - WB Median Widening15-Dec-16
IBWBM-RW200PH IB - Stabilization (International Drv.-I4) - WB Median Widening15-Dec-16
IBWBM-RW210PH IB - Base (International Drv.-I4) - WB Median Widening15-Dec-16
IIBEBO-ST17PH IIB - Removal of Concrete Forms Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLV15-Dec-16
IIBEBO-ST18PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge over universal BLVD)15-Dec-16
IIIBWBO-ST13PH IIIB - Removal for Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Uni15-Dec-16
IIIBWBO-ST14PH IIIB - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over universal BLVD)16-Dec-16
IBR-AP120PH IB - Asphalt - Structural - Ramp C (Redundant)19-Dec-16
IBR-EW110PH IB - Embankment - Ramp C (Redundant)19-Dec-16
IBR-GC120PH IB - Guardrail (Roadway) - Ramp B/C Gore (Activity Not Req'd)19-Dec-16
IBR-GC130PH IB - Clear & Grub/Demo - Ramp C (Redundant)19-Dec-16
IBR-GC150PH IB - Performance Turf, SOD - Ramp C (Redundant)19-Dec-16
IBR-GC160PH IB - Guardrail (Roadway) - Ramp C (Redundant)19-Dec-16
IBR-RW120PH IB - Stabilization - Ramp C (Redundant)19-Dec-16
IBR-RW130PH IB - Base - Ramp C (Redundant)19-Dec-16
IBR-TC110PH IB - Set Temp Traffic Barriers - Ramp C (Redundant)19-Dec-16
IIBR-AP160PH IIB - Asphalt - Structural - Ramp I4- Interstate19-Dec-16
IIBR-EW180PH IIB - Embankment - Ramp I4- Interstate19-Dec-16
IIBR-GC300PH IIB - Demo - Ramp I4- Interstate19-Dec-16
IIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate19-Dec-16
IIBR-GC400PH IIB - Guardrail (Roadway) - Ramp I4- Interstate19-Dec-16
IIBR-RW210PH IIB - Stabilization - Ramp I4- Interstate19-Dec-16
IIBR-RW230PH IIB - Base - Ramp I4- Interstate19-Dec-16
IIBR-SM390PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)19-Dec-16
IIBR-SP180PH IIB - Drainage (Temp) - Ramp I4 Interstate19-Dec-16
IIBR-SP190PH IIB - Drainage (Temp) - Ramp L19-Dec-16
IIBR-SP200PH IIB - Drainage (Temp) - Ramp U19-Dec-16
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate19-Dec-16
IIBR-TC360PH IIB - Temp Striping New Ramp Alignment - Ramp I4- Interstate19-Dec-16
IIBR-TC370PH IIB - MOT Shift New Ramp Alignment - Ramp I4- Interstate19-Dec-16
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C19-Dec-16
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening19-Dec-16
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)19-Dec-16
IIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T19-Dec-16
IIBR170PH IIB - Construct Ramp U Diversion - Ramp U04-Jan-17
PRE-PS-038Prepare and Submit 238119 Packaged Air Conditioners09-Jan-17
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)10-Jan-17
IIBEBO-ST210PH IIB - Curing Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)10-Jan-17
IIBEBO-ST220PH IIB - End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)10-Jan-17
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)11-Jan-17
IIBEBO-ST260PH IIB - End Bent 1 - EB Outside Widening (Bridge over Shingle Creek)11-Jan-17
TF-RA-001Review and Approve Precast Erection12-Jan-17
PRE-RA-022Review and Approve 133420 Pre-Engineered Precast Concrete Structure12-Jan-17
PRE-RA-038Review and Approve 238119 Packaged Air Conditioners12-Jan-17
IBEBM-ST550PH IB - Approach Slabs - EB Median Widening (Bridge over International DR)12-Jan-17
IBWBM-ST390PH IB - Approach Slabs - WB Median Widening (Bridge over International DR)12-Jan-17
IIBEBO-ST180PH IIB - Wall Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)13-Jan-17
IIBEBO-ST310PH IIB - End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)13-Jan-17
IIBR-GC150PH IIB - Demo - Ramp S-116-Jan-17
IIBR-SP140PH IIB - Drainage (Temp) - Ramp S-116-Jan-17
IIBR-TC280PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I-116-Jan-17
IIBR-TC380PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp L16-Jan-17
IIBR-TC400PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp U16-Jan-17
PRE-FA-031Fabricate and Deliver 081100 Metal Doors and Frames16-Jan-17
PRE-FA-032Fabricate and Deliver 099100 Painting Product Data and Sample16-Jan-17
PRE-PS-036Prepare and Submit 232000 Piping and Specialties16-Jan-17
PRE-PS-039Prepare and Submit 260536 Cable Trays16-Jan-17
IBEBO-EW120PH IB - Pond Excav/Embank I-4 to Int. Dr. - EB Outside Widening16-Jan-17
PRE-FA-038Fabricate and Deliver 238119 Packaged Air Conditioners17-Jan-17
PRE-RA-036Review and Approve 232000 Piping and Specialties18-Jan-17
PRE-RA-039Review and Approve 260536 Cable Trays18-Jan-17
IBEBM-RW270PH IB - Stabilization (Universal - JYP) - EB Median Widening18-Jan-17
IBEBM-RW300PH IB - Base (Universal - JYP) - EB Median Widening18-Jan-17
PRE-RA-001Review and Approve 506 Bridge Drainage System19-Jan-17
IBEBM-ST840PH IB - Approach Slabs - EB Median Widening (Bridge over universal BLVD)20-Jan-17
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr20-Jan-17
IIIBR120PH IIIB - Construct Ramp V Diversion - Ramp V23-Jan-17
GC-GCN170PH MS - Start Phase III B Construction23-Jan-17
IIBEBO-ST150PH IIB - End Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)24-Jan-17
PRE-FA-001Fabricate and Deliver 506 Bridge Drainage System25-Jan-17
PRE-FA-036Fabricate and Deliver 232000 Piping and Specialties25-Jan-17
IBWBM-ST650PH IB - Approach Slabs - WB Median Widening (Bridge over universal BLVD)25-Jan-17
IBEBM-ST580PH IB - Lighting Conduit - EB Median Widening (Bridge over International DR)26-Jan-17
IBWBM-ST430PH IB - Lighting Conduit - WB Median Widening (Bridge over International DR)26-Jan-17
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)26-Jan-17
IIBEBO-ST740PH IIB - Curing for End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)27-Jan-17
TF-FA-001Fabricate and Deliver Precast Erection30-Jan-17
IBEBM-RW230PH IB - Grade (International Drive - Universal) - EB Median Widening30-Jan-17
IBEBM-ST860PH IB - Lighting Conduit - EB Median Widening (Bridge over universal BLVD)30-Jan-17
IIBEBO-ST120PH IIB - Wall Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)30-Jan-17
IIBEBO-ST710PH IIB - Curing for End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)30-Jan-17
IIBR-SP160PH IIB - Drainage (Temp) - Ramp H31-Jan-17
IBWBM-ST630PH IB - Lighting Conduit - WB Median Widening (Bridge over John Young PKWY)31-Jan-17
IBWBM-ST680PH IB - Lighting Conduit - WB Median Widening (Bridge over universal BLVD)31-Jan-17
PRE-RA-023Review and Approve 263213 Engine Generator01-Feb-17
IBEBM-ST770PH IB - Lighting Conduit - EB Median Widening (Bridge over John Young PKWY)01-Feb-17
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-106-Feb-17
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-206-Feb-17
IBEBM-RW220PH IB - Grade (I4-International Drive) - EB Median Widening06-Feb-17
IIBEBO-GC100PH IIB - MISC. Demo - EB Outside Widening06-Feb-17
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)06-Feb-17
IBEBM-ST590PH IB - Traffic Railing (32") - EB Median Widening (Bridge over International DR)07-Feb-17
IBWBM-ST440PH IB - Traffic Railing (32") - WB Median Widening (Bridge over International DR)07-Feb-17
IBEBM-RW260PH IB - Stabilization (International Drive - Universal) - EB Median Widening08-Feb-17
IBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening08-Feb-17
IBWBM-TC150PH IB - Construct Diversion at I-Drive - WB Median Widening08-Feb-17
PRE-FA-039Fabricate and Deliver 260536 Cable Trays09-Feb-17
IBEBM-ST870PH IB - Traffic Railing (32") - EB Median Widening (Bridge over universal BLVD)09-Feb-17
IBWBM-ST690PH IB - Traffic Railing (32") - WB Median Widening (Bridge over universal BLVD)09-Feb-17
IIBEBO-ST490PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over Shingle Creek)10-Feb-17
PRE-PS-034Prepare and Submit 231113 Fuel Oil Piping13-Feb-17
PRE-PS-035Prepare and Submit 231323 Aboveground Diesel Storage Tank and Piping13-Feb-17
IIBEBO-ST280PH IIB - Set Beams - EB Outside Widening (Bridge 750629 Ramp S over JYP)13-Feb-17
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-215-Feb-17
IBEBM-ST730PH IB - Approach Slabs - EB Median Widening (Bridge over John Young PKWY)15-Feb-17
IBWBM-ST610PH IB - Approach Slabs - WB Median Widening (Bridge over John Young PKWY)15-Feb-17
IBEBM-RW250PH IB - Stabilization (I4-international Drive) - EB Median Widening17-Feb-17
IIBEBO-ST290PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge 750629 Ramp S over JYP)17-Feb-17
PRE-PS-030Prepare and Submit 042200 Masonry20-Feb-17
PRE-PS-037Prepare and Submit 233113 Ductwork Product Data and Shop Drawing20-Feb-17
IBEBM-ST600PH IB - Grind and Groove - EB Median Widening (Bridge over International DR)20-Feb-17
IBWBM-ST470PH IB - Grind and Groove - WB Median Widening (Bridge over International DR)20-Feb-17
IBEBM-ST880PH IB - Grind and Groove - EB Median Widening (Bridge over universal BLVD)21-Feb-17
IBWBM-ST700PH IB - Grind and Groove - WB Median Widening (Bridge over universal BLVD)21-Feb-17
IIBR-TC300PH IIB - Temp Striping New Ramp Alignment - Ramp I-123-Feb-17
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)24-Feb-17
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)24-Feb-17
IIBR-TC220PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp E27-Feb-17
IIBR-TC310PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp H27-Feb-17
PRE-FA-022Fabricate and Deliver 133420 Pre-Engineered Precast Concrete Structure27-Feb-17
PRE-PS-033Prepare and Submit 101400 Signage27-Feb-17
IBWBM-ST670PH IB - Grind and Groove - WB Median Widening (Bridge over John Young PKWY)27-Feb-17
GC-GCN150PH MS - Start Phase II C Construction28-Feb-17
IIBR-TC230PH IIB - Temp Striping New Ramp Alignment - Ramp E28-Feb-17
IIBR-TC320PH IIB - Temp Striping New Ramp Alignment - Ramp H28-Feb-17
IIBR-TC390PH IIB - Temp Striping New Ramp Alignment - Ramp L28-Feb-17
IBEBM-ST790PH IB - Grind and Groove - EB Median Widening (Bridge over John Young PKWY)28-Feb-17
IIBR-EHM340PH IIB - Existing High Mast Removal (1-8)01-Mar-17
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)02-Mar-17
IBEBM-ST780PH IB - Traffic Railing (32") - EB Median Widening (Bridge over John Young PKWY)03-Mar-17
IIBR-GC110PH IIB - Demo - Ramp E06-Mar-17
IBWBM-ST640PH IB - Traffic Railing (32") - WB Median Widening (Bridge over John Young PKWY)06-Mar-17
IIBR-GC240PH IIB - Demo - Ramp H07-Mar-17
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)07-Mar-17
IIBR-TC340PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp R-209-Mar-17
IIBR-TC410PH IIB - Temp Striping New Ramp Alignment - Ramp U09-Mar-17
PRE-FA-019Fabricate and Deliver 700 Highway Signing (Single, Multi, Panel, and Overhead)09-Mar-17
IIBEBO-ST350PH IIB - Superstructure Deck Finish Rebar\Set screed\Pouring - EB Outside Widening (Bridge 750629 Ramp S over JYP)10-Mar-17
IIBR-TC330PH IIB - Temp Striping New Ramp Alignment - Ramp R-213-Mar-17
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)14-Mar-17
IIIAWBO-ST230PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)15-Mar-17
IIIBR-TC190PH IIIB - Temp Striping New Ramp Alignment - Ramp V16-Mar-17
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)17-Mar-17
IIIAWBO-ST200PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)17-Mar-17
TF-CO-002Install Upright 1 D.S.20-Mar-17
IIBR-EW130PH IIB - Embankment - Ramp R-120-Mar-17
IIBR-EW170PH IIB - Embankment - Ramp R-220-Mar-17
IIBR-GC310PH IIB - Demo - Ramp L20-Mar-17
IIBR-SP170PH IIB - Drainage (Temp) - Ramp R-220-Mar-17
IIBR-TC450PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp D20-Mar-17
PRE-FA-021Fabricate and Deliver 05500 Metal Fabrications20-Mar-17
PRE-PS-017Prepare and Submit 646 Aluminum Pedestal Poles20-Mar-17
PRE-PS-026Prepare and Submit 653 Pedestrian Signals20-Mar-17
PRE-PS-028Prepare and Submit 665 Pedestrian Detector20-Mar-17
PRE-PS-040Prepare and Submit 264113 Lighting Protection System Product Data and Shop Drawing20-Mar-17
IIBR-RES120PH IIB - Remove Existing Sign Structures (2-4)20-Mar-17
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening20-Mar-17
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)20-Mar-17
IIBR-GC130PH IIB - Demo - Ramp R-121-Mar-17
IIBR-GC290PH IIB - Demo - Ramp R-221-Mar-17
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside Widening21-Mar-17
TF-CO-005Install Upright 2 D.S.22-Mar-17
PRE-RA-017Review and Approve 646 Aluminum Pedestal Poles23-Mar-17
PRE-RA-018Review and Approve 650 Traffic Signals23-Mar-17
PRE-RA-026Review and Approve 653 Pedestrian Signals23-Mar-17
PRE-RA-028Review and Approve 665 Pedestrian Detector23-Mar-17
TF-CO-007Install Upright 3 D.S.24-Mar-17
IIBR-SM400PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)27-Mar-17
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)27-Mar-17
PRE-RA-035Review and Approve 231323 Aboveground Diesel Storage Tank and Piping28-Mar-17
PRE-RA-040Review and Approve 264113 Lighting Protection System Product Data and Shop Drawing28-Mar-17
IIIBR-GC180PH IIIB - Demo - Ramp V28-Mar-17
IIBR-GC350PH IIB - Demo - Ramp U29-Mar-17
PRE-RA-033Review and Approve 101400 Signage29-Mar-17
IIAEBO-AP100PH IIA - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)29-Mar-17
GC-GCN200PH MS - Start Phase III A Construction30-Mar-17
TF-CO-011AS Build D.S.30-Mar-17
IIIBR130PH IIIB - Construct Ramp K Diversion/Temp Pavement - Ramp K03-Apr-17
IIBR-EW190PH IIB - Embankment - Ramp L03-Apr-17
IIBR-RW260PH IIB - Stabilization - Ramp U03-Apr-17
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening03-Apr-17
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)05-Apr-17
IIIAWBO-ST330PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)05-Apr-17
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles07-Apr-17
PRE-FA-026Fabricate and Deliver 653 Pedestrian Signals07-Apr-17
PRE-FA-028Fabricate and Deliver 665 Pedestrian Detector07-Apr-17
IIBR-SP120PH IIB - Drainage (Temp) - Ramp R-110-Apr-17
IIBR-TC440PH IIB - Temp Striping New Ramp Alignment - Ramp D10-Apr-17
IIBEBO-ST320PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over universal BLVD)10-Apr-17
IIBR-RW270PH IIB - Base - Ramp U12-Apr-17
IIBEBO-ST130PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over International DR)12-Apr-17
IIIAWBO-ST290PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Apr-17
IIBR-TC250PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp C16-Apr-17
PRE-FA-040Fabricate and Deliver 264113 Lighting Protection System Product Data and Shop Drawing19-Apr-17
IIIBR-TC180PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp V19-Apr-17
IIIAWBO-ST340PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)19-Apr-17
IIBEBO-ST600PH IIB - Lighting Conduit - EB Outside Widening (Bridge over Shingle Creek)20-Apr-17
PRE-RA-034Review and Approve 231113 Fuel Oil Piping21-Apr-17
IIBEBO-ST610PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over Shingle Creek)24-Apr-17
IIBEBO-ST630PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over International DR)24-Apr-17
IIBEBO-ST640PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over universal BLVD)24-Apr-17
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)24-Apr-17
IIBR-SM410PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (C)25-Apr-17
IIIBR-TC210PH IIIB - Temp Striping New Ramp Alignment - Ramp K01-May-17
IIBEBO-ST430PH IIB - Approach Slabs - EB Outside Widening (Bridge 750629 Ramp S over JYP)01-May-17
IIIBWBO-EW100PH IIIB - Surcharge/ Embankment 1 - WB Outside Widening Area01-May-17
IIBR-IDS30PH IIB - Install Drilled Shafts (36-57)03-May-17
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping05-May-17
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping05-May-17
IIBR-EHM350PH IIB - Existing High Mast Removal (9-18)05-May-17
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)08-May-17
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)09-May-17
IIBR-SM450PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (19 EA)10-May-17
IIIAWBO-ST410PH IIIA - Set Beams - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)10-May-17
IIBR-AP180PH IIB - Asphalt - Structural - Ramp U11-May-17
IIDEBO-ST340PH IID - Curing for End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)12-May-17
PRE-FA-029Fabricate and Deliver 033000 Cast-In-Place Concrete15-May-17
IIIAWBO-ST420PH IIIA - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)15-May-17
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)16-May-17
IIBEBO-ST460PH IIB - Lighting Conduit - EB Outside Widening (Bridge 750629 Ramp S over JYP)17-May-17
IIAR-RW100PH IIB - Stabilization - Ramp O18-May-17
PRE-FA-042Fabricate and Deliver 781 DMS18-May-17
IIIBR-EW120PH IIIB - Embankment - Ramp V18-May-17
IIBEBO-ST470PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge 750629 Ramp S over JYP)19-May-17
IIIBWBO-EW101PH IIIB - Surcharge/ Embankment 2 - WB Outside Widening Area19-May-17
IBR-TC100PH IB - Set Temp Traffic Barriers - Ramp B/C Gore22-May-17
IIBR-SP110PH IIB - Drainage - Ramp E22-May-17
PRE-FA-023Fabricate and Deliver 263213 Engine Generator22-May-17
PRE-FA-037Fabricate and Deliver 233113 Ductwork Product Data and Shop Drawing22-May-17
PRE-RA-037Review and Approve 233113 Ductwork Product Data and Shop Drawing22-May-17
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)23-May-17
IIAR-RW110PH IIB - Base - Ramp O30-May-17
PRE-FA-033Fabricate and Deliver 101400 Signage30-May-17
IIBEBO-ST450PH IIB - End Bent 3 - EB Outside Widening (Bridge over universal BLVD)31-May-17
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)31-May-17
IIIAWBO-ST520PH IIIA - Superstructure Deck Finish Rebar\Set Screed\ Pour - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)31-May-17
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)02-Jun-17
IIBEBO-ST400PH IIB - End Bent 1 - EB Outside Widening (Bridge over universal BLVD)06-Jun-17
IIBEBO-ST420PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over universal BLVD)08-Jun-17
PRE-FA-045Fabricate and Deliver 786 ITS Vehicle Detection System09-Jun-17
IIIBR-GC190PH IIIB - Demo - Ramp K12-Jun-17
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)15-Jun-17
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA15-Jun-17
IIBEBO-ST360PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over universal BLVD)15-Jun-17
IIBEBO-ST730PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over universal BLVD)15-Jun-17
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening16-Jun-17
IIIBWBO-EW102PH IIIB - Surcharge/ Embankment 3 - WB Outside Widening Area16-Jun-17
TF-CO-001Foundation (FRP SOG)19-Jun-17
TF-CO-013Const. Screen Wall (Con.)20-Jun-17
PRE-FA-030Fabricate and Deliver 042200 Masonry20-Jun-17
PRE-RA-030Review and Approve 042200 Masonry20-Jun-17
IIBR-EHM360PH IIB - Existing High Mast Removal (19-27)21-Jun-17
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)21-Jun-17
TF-CO-008Constr. Pedestal26-Jun-17
IIAR-AP100PH IIB - Asphalt - Structural - Ramp O26-Jun-17
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)26-Jun-17
TF-CO-004Precast Erection27-Jun-17
TF-CO-006FRP Conc. Roof Dec/c27-Jun-17
TF-CO-009Const. Roof System27-Jun-17
TF-CO-012Install Frames & Doors27-Jun-17
TF-CO-015Install HVAC27-Jun-17
IIIBWBO-ST180PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over universal BLVD)27-Jun-17
IIIBWBO-ST300PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)27-Jun-17
IIIBWBO-ST240PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-17
IIIBWBO-ST260PH IIIB - Wall Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-17
IIBR-RW240PH IIB - Stabilization - Ramp L05-Jul-17
IIIBWBO-ST220PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)05-Jul-17
IIIBWBO-ST640PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over universal BLVD)05-Jul-17
IICR-SP120PH IIC - Drainage - Ramp M08-Jul-17
IIIBWBO-ST330PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)08-Jul-17
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR10-Jul-17
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)10-Jul-17
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)11-Jul-17
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA12-Jul-17
IIBR-ITS50PH IIB - Install ITS Poles (1-20)13-Jul-17
IIBR-RW250PH IIB - Base - Ramp L17-Jul-17
IIBR-SP130PH IIB - Drainage - Ramp I-117-Jul-17
IICR-SP100PH IIC - Drainage - Ramp S-217-Jul-17
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O17-Jul-17
PRE-FA-018Fabricate and Deliver 650 Traffic Signals17-Jul-17
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting17-Jul-17
IIIBR-SP100PH IIIB - Drainage (Temp) - Ramp G17-Jul-17
IIBEBO-ST480PH IIB - Set Beams - EB Outside Widening (Bridge over Universal BLVD)17-Jul-17
IIIBWBO-ST340PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Universal BLVD)18-Jul-17
IIBEBO-ST500PH IIB - Superstructure Deck SIP / Overhangs / Edges - EB Outside Widening (Bridge over Universal BLVD)21-Jul-17
IIIBWBO-EW103PH IIIB - Surcharge/ Embankment 4 - WB Outside Widening Area21-Jul-17
IIBR-RW150PH IIB - Stabilization - Ramp I-124-Jul-17
IIIBWBO-ST350PH IIIB - Superstructure Deck SIB & Start Rebar - WB Outside Widening (Area Bridge over Universal BLVD)24-Jul-17
IIBR-RW170PH IIB - Base - Ramp I-126-Jul-17
IIICR-SP110PH IIIC - Drainage - Ramp N28-Jul-17
IIBR-RW120PH IIB - Stabilization - Ramp E31-Jul-17
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive31-Jul-17
IIIAWBO-ST570PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)02-Aug-17
IIBR-AP130PH IIB - Asphalt - Structural - Ramp I-107-Aug-17
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)08-Aug-17
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)10-Aug-17
IIBR-RW130PH IIB - Base - Ramp E10-Aug-17
TF-CO-010FRP Conc. Pad (Generator)14-Aug-17
TF-CO-022Construct Sidewalk14-Aug-17
IIBR-RW180PH IIB - Stabilization - Ramp H14-Aug-17
IIBR-RW200PH IIB - Stabilization - Ramp R-214-Aug-17
IIBEBO-ST520PH IIB - Superstructure Deck Rebar - EB Outside Widening (Bridge over Universal BLVD)14-Aug-17
IIIAWBO-ST120PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)14-Aug-17
IIBEBO-IE20PH IIB - Install 2 Ea Mast Arms at Jyp16-Aug-17
IIBEBO-ST550PH IIB - Lighting Conduit - EB Outside Widening (Bridge over universal BLVD)16-Aug-17
IIIBWBO-TC110PH IIIB - Set Temp Traffic Barriers - WB Outside Widening Area16-Aug-17
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area16-Aug-17
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U17-Aug-17
IIIAWBO-ST590PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)17-Aug-17
IIBR-AP170PH IIB - Asphalt - Structural - Ramp L21-Aug-17
IIIBR-ET40PH IIIB - Erect Trusses (1-8)21-Aug-17
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive21-Aug-17
IIBEBO-ST570PH IIB - Superstructure Deck Pour - EB Outside Widening (Bridge over Universal BLVD)21-Aug-17
IIIAWBO-ST111PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)21-Aug-17
IIIAWBO-ST140PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)21-Aug-17
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)21-Aug-17
IIBR-RW220PH IIB - Base - Ramp R-222-Aug-17
IICR-TC200PH IIC - MOT Shift New Ramp Alignment - Ramp L23-Aug-17
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening23-Aug-17
IIIBWBO-ST100PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over Universal BLVD)23-Aug-17
IIIBWBO-ST631PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over International DR)23-Aug-17
IIBEBO-ST530PH IIB - Approach Slabs - EB Outside Widening (Bridge over universal BLVD)24-Aug-17
IIIAWBO-ST130PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)25-Aug-17
IICR120PH IIC - Construct Ramp M Diversion - Ramp M28-Aug-17
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J28-Aug-17
IICR-EW120PH IIC - Embankment - Ramp M28-Aug-17
IIICR110PH IIIC - Construct Ramp N Diversion - Ramp N29-Aug-17
GC-GCN180PH MS - Start Phase III C Construction29-Aug-17
IIIBWBO-GC100PH IIIB - MISC. Demo - WB Outside Widening Area29-Aug-17
IIIAWBO-ST170PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)30-Aug-17
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-201-Sep-17
IIIBR-SP120PH IIIB - Drainage (Temp) - Ramp V17-Sep-17
IIIBR-SP130PH IIIB - Drainage (Temp) - Ramp K17-Sep-17
IIIBR-TC160PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp J17-Sep-17
IIIBR-TC200PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp K17-Sep-17
IIBR-EW150PH IIB - Embankment - Ramp I-118-Sep-17
IIBR-GC140PH IIB - Demo - Ramp I-118-Sep-17
IIIAWBO-ST600PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)23-Sep-17
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area25-Sep-17
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems29-Sep-17
IIBEBO-ST560PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over universal BLVD)30-Sep-17
IIIBR-RW140PH IIIB - Stabilization - Ramp V02-Oct-17
IIBR-RW190PH IIB - Base - Ramp H03-Oct-17
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)03-Oct-17
IIIBR-RW150PH IIIB - Base - Ramp V04-Oct-17
IIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area04-Oct-17
IIBR-EC10PH IIB - Erect Cantilevers (1-3)05-Oct-17
IIIBR-EW130PH IIIB - Embankment - Ramp K05-Oct-17
IIBR-EW140PH IIB - Embankment - Ramp C09-Oct-17
IIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C10-Oct-17
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E11-Oct-17
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive11-Oct-17
IIIAWBO-AP100PH IIIA - Mill & Resurface (sacrificial) - WB Outside Widening Area (SR528)11-Oct-17
IIIAWBO-TC100PH IIIA - Install Sign & Traffic Control Devices - WB Outside Widening Area11-Oct-17
IIIAWBO-TC110PH IIIA - Temp Striping for Phase - WB Outside Widening Area (SR528)11-Oct-17
IIIAWBO-TC120PH IIIA - MOT Shift for Phase - WB Outside Widening Area11-Oct-17
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area11-Oct-17
IIBR-GC170PH IIB - Demo - Ramp C12-Oct-17
IICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-112-Oct-17
IIIBWBO-ST460PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over universal BLVD)12-Oct-17
IIBR-RW290PH IIB - Shoulder Gutter - Ramp C15-Oct-17
IIBR-SM420PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (14 EA)16-Oct-17
IIBR-SM430PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (7 EA)16-Oct-17
IIBR-SM490PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)16-Oct-17
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware16-Oct-17
IIICWBO-ST100PH IIIA - Demo Bridge - WB Outside Widening Area (Bridge over John Young PKWY)16-Oct-17
IIIBR-RW160PH IIIB - Stabilization - Ramp K18-Oct-17
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)20-Oct-17
IIIBWBO-ST470PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over universal BLVD)20-Oct-17
IIIBR-AP120PH IIIB - Asphalt - Structural - Ramp V23-Oct-17
IIIBR-RW180PH IIIB - Stabilization - Ramp T23-Oct-17
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)23-Oct-17
IICR-TC210PH IIC - MOT Shift New Ramp Alignment - Ramp U24-Oct-17
IIICWBO-ST220PH IIIA - Demo Bridge Deck - WB Outside Widening Area (Bridge over John Young PKWY)25-Oct-17
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)27-Oct-17
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)27-Oct-17
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)27-Oct-17
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H29-Oct-17
IIIBR-RW120PH IIIB - Stabilization - Ramp J30-Oct-17
IIIBR-RW190PH IIIB - Base - Ramp T30-Oct-17
IIIBR-RW170PH IIIB - Base - Ramp K31-Oct-17
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)01-Nov-17
IIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)01-Nov-17
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)01-Nov-17
IIIBR-RW130PH IIIB - Base - Ramp J02-Nov-17
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)02-Nov-17
IIBR-ITS60PH IIB - Install ITS Poles (21-41)06-Nov-17
IIBR-SP150PH IIB - Drainage - Ramp C06-Nov-17
IIIBR-IDS40PH IIIB - Install Drilled Shafts (58-63)06-Nov-17
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area06-Nov-17
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R07-Nov-17
IIBR-RW140PH IIB - Stabilization - Ramp C08-Nov-17
IIIBR-TC120PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp G08-Nov-17
IIIBR-TC130PH IIIB - Temp Striping New Ramp Alignment - Ramp G09-Nov-17
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area09-Nov-17
IIIC-CP10PH IIIC - Construct Ped. Signalization at Ramps G&F12-Nov-17
TF-CO-014Pull Wire & Install Light Fixtures12-Nov-17
TF-CO-018Install Lighting12-Nov-17
TF-CO-019Install Security System12-Nov-17
TF-CO-020Install Lightning Protection12-Nov-17
TF-CO-024Wall Treatments (Ply)12-Nov-17
IIBR-GC390PH IIB - Guardrail (Roadway) - Ramp R12-Nov-17
TF-CO-016F+1 Generator13-Nov-17
TF-CO-017F+1 Fuel Tank13-Nov-17
IIBR-ITS70PH IIB - Install CCTV's (1-8)13-Nov-17
IIBR-ITS80PH IIB - Install CCTV's (9-16)13-Nov-17
IIIBR-GC140PH IIIB - Demo - Ramp J13-Nov-17
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)13-Nov-17
IIIBR-SM630PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (D)13-Nov-17
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)13-Nov-17
IIIBWBO-W101PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over Universal BLVD)13-Nov-17
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)13-Nov-17
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area13-Nov-17
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)15-Nov-17
IIBR-RW160PH IIB - Base - Ramp C20-Nov-17
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G27-Nov-17
IIIBR-EW100PH IIIB - Embankment - Ramp G27-Nov-17
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)27-Nov-17
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area27-Nov-17
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)27-Nov-17
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)29-Nov-17
IIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)02-Dec-17
TF-CO-023Erect Truss04-Dec-17
TF-CO-025Install Equip. Arm Supports04-Dec-17
TF-CO-029Install Conduit/Raceways04-Dec-17
IIIBR-EC20PH IIIB - Erect Cantilevers (4-9)04-Dec-17
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening04-Dec-17
IIBEBO-ST200PH IIB - End Bent 3 - EB Outside Widening (Bridge over International DR)05-Dec-17
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)05-Dec-17
IICR-TC180PH IIC - MOT Shift New Ramp Alignment - Ramp H06-Dec-17
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)06-Dec-17
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive06-Dec-17
GC-GCN190PH MS - Start Phase II D Construction07-Dec-17
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-207-Dec-17
IIIBR-GC100PH IIIB - Demo - Ramp G07-Dec-17
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)08-Dec-17
IIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)11-Dec-17
IICR-TC170PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp S-213-Dec-17
IIIAWBO-ST580PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Dec-17
IICR-TC160PH IIC - Temp Striping New Ramp Alignment - Ramp S-216-Dec-17
IICR-GC100PH IIC - Demo - Ramp S-218-Dec-17
IIBEBO-ST440PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge 750629 Ramp S over JYP)18-Dec-17
IIIBR-RW100PH IIIB - Stabilization - Ramp G20-Dec-17
IIIBWBO-ST28PH IIIB - Rip Rap Under Bridge - WB Outside Widening Area (Bridge over Shingle Creek)03-Jan-18
IIBR-GC220PH IIB - Guardrail (Roadway) - Ramp E08-Jan-18
IIIBR-RW110PH IIIB - Base - Ramp G08-Jan-18
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)08-Jan-18
IIIAWBO-ST181PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge over John Young PKWY)08-Jan-18
IICR-TC1000PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp M10-Jan-18
IIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K10-Jan-18
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening10-Jan-18
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E11-Jan-18
IIIBR-TC170PH IIIB - Temp Striping New Ramp Alignment - Ramp J14-Jan-18
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E16-Jan-18
IICR-TC1020PH IIC - Temp Striping New Ramp Alignment - Ramp M18-Jan-18
IIIBR-SP160PH IIIB - Drainage (Temp) - Ramp Q21-Jan-18
TF-CO-026Cont. Lightning22-Jan-18
TF-CO-027Cont. HVAC22-Jan-18
IIBR-SM380PH IIB - Shoulder Mount Light Pole/Service (I-4 to International) (14 EA)22-Jan-18
IIBR-SP210PH IIB - Drainage - Ramp D23-Jan-18
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)29-Jan-18
IIBEBO-ST340PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over International DR)29-Jan-18
IIDEBO-ST260PH IID - Concrete Slope Pavement - EB Outside Widening (Bridge over John Young PKWY)29-Jan-18
IIIBWBO-ST480PH IIIB - End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)31-Jan-18
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C01-Feb-18
IICR-GC170PH IIC - Demo - Ramp M05-Feb-18
IIBEBO-ST250PH IIB - Set Beams - EB Outside Widening (Bridge over International Drive)05-Feb-18
IIIAWBO-ST150PH IIIA - Set Beams - WB Outside Widening Area (Bridge over John Young PKWY)05-Feb-18
IIICR-GC110PH IIIC - Demo - Ramp N06-Feb-18
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)06-Feb-18
IIBEBO-ST270PH IIB - Superstructure Deck - EB Outside Widening (Bridge over International Drive)07-Feb-18
IIIAWBO-ST160PH IIIA - Superstructure Deck - WB Outside Widening Area (Bridge over John Young PKWY)07-Feb-18
IIIBR-SP110PH IIIB - Drainage - Ramp J08-Feb-18
IIIBWBO-ST520PH IIIB - Curing for End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)09-Feb-18
IICR-RW100PH IIC - Stabilization - Ramp S-212-Feb-18
IIICR-EW110PH IIIC - Embankment - Ramp N12-Feb-18
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q15-Feb-18
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)19-Feb-18
IIBR-ITS90PH IIB - Install CCTV's (17-22)20-Feb-18
IIIBWBO-ST320PH IIIB - Curing for Pier 2, 3, (Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)22-Feb-18
IIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)26-Feb-18
IIDEBO-ST230PH IID - Set Beams - EB Outside Widening (Bridge over John Young PKWY)27-Feb-18
IICR-RW110PH IIC - Base - Ramp S-228-Feb-18
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)28-Feb-18
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)01-Mar-18
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)01-Mar-18
IICR-RW150PH IIC - Stabilization - Ramp M02-Mar-18
IIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl02-Mar-18
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)02-Mar-18
IIIAR110PH IIIA - Construct Ramp T Diversion - Ramps T05-Mar-18
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G05-Mar-18
IVEBO-SS100PH IV - Install OT Structures - East of JYP05-Mar-18
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area05-Mar-18
IIBEBO-ST370PH IIB - Lighting Conduit - EB Outside Widening (Bridge over International DR)06-Mar-18
IIIBR-EW110PH IIIB - Embankment - Ramp J12-Mar-18
IIICR-RW120PH IIIC - Stabilization - Ramp N14-Mar-18
IIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-118-Mar-18
IIIBR-TC270PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp Q18-Mar-18
IIIBR-TC280PH IIIB - Temp Striping New Ramp Alignment - Ramp Q18-Mar-18
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)18-Mar-18
IICR-AP100PH IIC - Asphalt - Structural - Ramp S-219-Mar-18
IIIBR-GC340PH IIIB - Demo - Ramp Q19-Mar-18
IIICR-TC140PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp N19-Mar-18
IIICR-TC150PH IIIC - Temp Striping New Ramp Alignment - Ramp N19-Mar-18
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)20-Mar-18
IIIBR-EW160PH IIIB - Embankment - Ramp Q21-Mar-18
IIBEBO-ST380PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over International DR)21-Mar-18
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S22-Mar-18
IIICR-SP100PH IIIC - Drainage - Ramp F22-Mar-18
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)23-Mar-18
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J27-Mar-18
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive27-Mar-18
IIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K28-Mar-18
IIBR-SP100PH IIB - Drainage - Ramp B29-Mar-18
IIBR-EW210PH IIB - Embankment - Ramp D30-Mar-18
IICR-GC110PH IIC - Performance Turf, SOD - Ramp S-230-Mar-18
IIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)30-Mar-18
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)30-Mar-18
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F02-Apr-18
IIBR-RW320PH IIB - Stabilization - Ramp D02-Apr-18
IIIBR-GC260PH IIIB - Guardrail (Roadway) - Ramp K02-Apr-18
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)02-Apr-18
IICR-RW140PH IIC - Base - Ramp M03-Apr-18
IIIBR-AP110PH IIIB - Asphalt - Structural - Ramp J03-Apr-18
IVWBM-TC100PH IV - Set Temp Traffic Barriers - WB Median Widening04-Apr-18
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive04-Apr-18
GC-GCN160PH MS - Start Phase IV Construction05-Apr-18
IVWBM-GC100PH IV - Demo Temporary - WB Express05-Apr-18
IVWBM-SP100PH IV - Drainage - Median Widening (East of 311)05-Apr-18
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)06-Apr-18
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal06-Apr-18
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)09-Apr-18
IIIBR-RW220PH IIIB - Stabilization - Ramp Q09-Apr-18
IIICR-RW130PH IIIC - Base - Ramp N09-Apr-18
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)09-Apr-18
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)10-Apr-18
IIIAWBO-ST191PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge over John Young PKWY)11-Apr-18
IIIAWBO-ST171PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge over John Young PKWY)12-Apr-18
IVR-ET50PH IV - Erect Trusses (9-17)17-Apr-18
IIIAWBO-ST201PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge over John Young PKWY)23-Apr-18
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)23-Apr-18
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)24-Apr-18
IIIBR-TC250PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp P25-Apr-18
IIIBR-TC260PH IIIB - Temp Striping New Ramp Alignment - Ramp P25-Apr-18
IIIBR-GC250PH IIIB - Demo - Ramp P27-Apr-18
IIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F27-Apr-18
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)30-Apr-18
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O30-Apr-18
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)01-May-18
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)01-May-18
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)01-May-18
IIIBWBO-ST700PH IIIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - WB Outside Widening Area (Bridge over Shingle Creek)03-May-18
IVR-ET60PH IV - Erect Trusses (18-24)06-May-18
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening07-May-18
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area07-May-18
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle10-May-18
IIIBR-RW230PH IIIB - Base - Ramp Q10-May-18
IVR-EC30PH IV - Erect Cantilevers (10-15)13-May-18
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express14-May-18
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)17-May-18
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)21-May-18
IIIBR-SP150PH IIIB - Drainage - Ramp P21-May-18
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express21-May-18
IIICR-RW100PH IIIC - Stabilization - Ramp F22-May-18
IVEBM-TC100PH IV - Shift EB traffic to outside I-Drive through Station 31222-May-18
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)23-May-18
IICR-AP120PH IIC - Asphalt - Structural - Ramp M23-May-18
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M24-May-18
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N24-May-18
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q29-May-18
IIICR-RW110PH IIIC - Base - Ramp F29-May-18
IIIBWBO-ST120PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over Shingle Creek)29-May-18
IIICR-GC160PH IIIC - Guardrail (Roadway) - Ramp N02-Jun-18
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)03-Jun-18
IIIBWBO-ST130PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over Shingle Creek)04-Jun-18
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)04-Jun-18
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)05-Jun-18
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman05-Jun-18
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F07-Jun-18
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle08-Jun-18
IIIBWBO-ST390PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over International Drive)02-Jul-18
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside03-Jul-18
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)03-Jul-18
IIIBWBO-ST690PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over International Drive)08-Jul-18
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)10-Jul-18
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P12-Jul-18
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)17-Jul-18
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle17-Jul-18
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)30-Jul-18
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle31-Jul-18
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle02-Aug-18
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp C13-Aug-18
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening15-Aug-18
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)20-Aug-18
IIBR-GC260PH IIB - Guardrail (Roadway) - Ramp I-120-Aug-18
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R20-Aug-18
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 31120-Aug-18
IVEBM-W180PH IV - Median Wall - FFP Stem - Station 259+50 to 31120-Aug-18
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T20-Aug-18
IIIBWBO-ST490PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over International DR)20-Aug-18
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 31127-Aug-18
IVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express29-Aug-18
IIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)31-Aug-18
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-131-Aug-18
IVWBM-RW240PH IV - Stabilization - Station 259+50 to 311 EB Express05-Sep-18
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)07-Sep-18
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)10-Sep-18
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)10-Sep-18
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)10-Sep-18
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)10-Sep-18
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T11-Sep-18
IIDEBO-ST270PH IID - Lighting Conduit - EB Outside Widening (Bridge over John Young PKWY)13-Sep-18
IIIBWBO-ST530PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over International DR)13-Sep-18
TF-CO-030Pull Wire17-Sep-18
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B17-Sep-18
IIBR-TC170PH IIB - Temp Striping for New Ramp Alignment - Ramp B17-Sep-18
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)17-Sep-18
IIIBWBO-ST540PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over International DR)17-Sep-18
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)24-Sep-18
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express24-Sep-18
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express24-Sep-18
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)26-Sep-18
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)26-Sep-18
IBR-EW100PH IB - Embankment - Ramp B/C Gore08-Oct-18
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge08-Oct-18
IBR-RW100PH IB - Stabilization - Ramp B/C Gore15-Oct-18
IBR-RW110PH IB - Base - Ramp B/C Gore15-Oct-18
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)15-Oct-18
TF-CO-031Toll Facility Finishes and Punchlist19-Oct-18
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP22-Oct-18

The following issues were found:

GC-GCN120
Activity has zero progress
GC-GCN130
Activity has zero progress
GC-GCN140
Activity has zero progress
GC-GCN170
Activity has zero progress
GC-GCN150
Activity has zero progress
GC-GCN200
Activity has zero progress
GC-GCN180
Activity has zero progress
GC-GCN190
Activity has zero progress
GC-GCN160
Activity has zero progress

The following actual finish dates were added in E8P02 Update No 36

Activity IDActivity DescriptionActual Finish
GC-GCN100PH MS - Construction Mobilization03-Sep-15
PRE-PS-003Prepare and Submit 455 Pile Installation Plan (Structures 750091 & 750218-John Young Parkway)26-Sep-15
PRE-PS-004Prepare and Submit 455 Pile Installation Plan (Structure 750629- Ramp S JYP)26-Sep-15
PRE-PS-005Prepare and Submit 455 Pile Installation Plan (Structure 750630- Ramp T JYP)26-Sep-15
IBEBM-ST100PH IB - Construct Crane Access - EB Median Widening (Bridge over Shingle Creek)13-Nov-15
GC-GCN120PH MS - Start Phase IB Construction20-Nov-15
PRE-RA-013Review and Approve 455 Auger Cast Piles (w/noise wall submittal)12-Dec-15
USV-CO-001Verizon15-Dec-15
UST-CO-001TECO16-Dec-15
IBEBM-ST240PH IB - Construct Crane Access - EB Median Widening (Bridge over universal BLVD)22-Feb-16
IBWBM-ST160PH IB - Construct Crane Access - WB Median Widening (Bridge over universal BLVD)23-Feb-16
IBWBM-GC100PH IB - Median Clearing and Grubbing - WB Median Widening24-Feb-16
IAEBO-GC130PH IA - Clear & Grub - EB Outside Widening (I-4 to Ramp H)26-Feb-16
IBEBM-ST110PH IB - DemoTraffic Rail / End Bents - EB Median Widening (Bridge over Shingle Creek)26-Feb-16
PRE-PS-007Prepare and Submit 400 Concrete Structures (Bearing Pads)02-Mar-16
IBEBM-ST390PH IB - Curing for Pier 2, 3, (Pile Cap) - EB Median Widening (Bridge over Shingle Creek)02-Mar-16
IIDEBO-ST100PH IID - Construct Crane Access - EB Outside Widening (Bridge over John Young PKWY)02-Mar-16
IBEBM-ST950PH IB - Demo Bridge Deck - EB Median Widening (Bridge over John Young PKWY)03-Mar-16
IBWBM-ST720PH IB - Demo Bridge Deck - WB Median Widening (Bridge over John Young PKWY)03-Mar-16
IBWBM-SP140PH IB - Drainage for STA 390 to TPK04-Mar-16
IBWBO-SP130PH IB - Jack & Bore JYP to TPK (East of Sta 354+04 to 415+33)04-Mar-16
PRE-RA-007Review and Approve 400 Concrete Structures (Bearing Pads)09-Mar-16
PRE-FA-00123Fabricate and Deliver 455 Structure Foundations Prestressed Concrete Piling 18" (Structures 750089 & 750216)10-Mar-16
IAEBO-W100PH IA - Noise/Sound Wall Prep Work (W-1) - EB Outside Widening15-Mar-16
IAEBO-W130PH IA - Noise/Sound Wall Prep Work (W-2) - EB Outside Widening18-Mar-16
IBEBM-ST140PH IB - Construct Crane Access - EB Median Widening (Bridge over International DR)18-Mar-16
IBWBM-ST110PH IB - Construct Crane Access - WB Median Widening (Bridge over International DR)18-Mar-16
PRE-PS-050Prepare and Submit 400 Concrete Structures (SIP Metal Forms)22-Mar-16
PRE-RA-050Review and Approve 400 Concrete Structures (SIP Metal Forms)30-Mar-16
IBEBM-ST270PH IB - Test Pile - EB Median Widening (Bridge over universal BLVD)31-Mar-16
IIIAWBO-ST27PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over John Young PKWY)06-Apr-16
IBWBM-ST130PH IB - Test Pile H-Piles - WB Median Widening (Bridge over International DR)13-Apr-16
IIIAWBO-ST18PH IIIA - Production Pile (H Piles) (1-32) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Apr-16
IIBEBO-ST22PH IIB - Production Pile (H Piles) (1-31) - EB Outside Widening (Bridge 750629 Ramp S over JYP)18-Apr-16
PRE-FA-0111Fabricate and Deliver 455 Temp Sheet Pile/Critical18-Apr-16
PRE-FA-00145Fabricate and Deliver 455 Structure Foundations Steel Pile HP 14X89 (Structures 750088 and 750215 I-Drive)18-Apr-16
USDED-CO-001Duke Energy Distribution (A)18-Apr-16
IBEBM-ST190PH IB - Production Pile (Concrete) - EB Median Widening (Bridge over Shingle Creek)22-Apr-16
PRE-FA-013Fabricate and Deliver 455 Auger Cast Piles (w/noise wall submittal)29-Apr-16
PRE-FA-014Fabricate and Deliver 534 Noise and Perimeter Walls29-Apr-16
PRE-FA-050Fabricate and Deliver 400 Concrete Structures (SIP Metal Forms)04-May-16
PRE-FA-007Fabricate and Deliver 400 Concrete Structures (Bearing Pads)06-May-16
IBEBM-ST710PH IB - End Bent 3 - EB Median Widening (Bridge over universal BLVD)06-May-16
IBWBM-ST570PH IB - End Bent 3 - WB Median Widening (Bridge over universal BLVD)06-May-16
IAEBO-W110PH IA - Install Posts (1-101)- EB Outside Widening09-May-16
IBEBM-ST700PH IB - Wall Bent 3 - EB Median Widening (Bridge over universal BLVD)10-May-16
IBWBM-ST550PH IB - Wall Bent 3 - WB Median Widening (Bridge over universal BLVD)10-May-16
IBEBM-ST230PH IB - Production Pile - EB Median Widening (Bridge over International DR)11-May-16
IBWBM-ST150PH IB - Production Pile - WB Median Widening (Bridge over International DR)11-May-16
IBEBM-ST410PH IB - End Bent 3 - EB Median Widening (Bridge over International DR)12-May-16
IBWBM-ST330PH IB - End Bent 3 - WB Median Widening (Bridge over International DR)12-May-16
PRE-PS-020Prepare and Submit 992 Under deck Lighting13-May-16
IBEBM-ST370PH IB - End Bent 1 - EB Median Widening (Bridge over International DR)13-May-16
IBWBM-ST290PH IB - End Bent 1 - WB Median Widening (Bridge over International DR)13-May-16
IBEBM-ST430PH IB - End Bent 1 - EB Median Widening (Bridge over Shingle Creek)16-May-16
IBEBM-ST330PH IB - Wall Bent 1 - EB Median Widening (Bridge over International DR)17-May-16
IBEBM-ST970PH IB - Curing for End Bent 3 - EB Median Widening (Bridge over universal BLVD)17-May-16
IBWBM-ST280PH IB - Wall Bent 1 - WB Median Widening (Bridge over International DR)17-May-16
IAEBO-W120PH IA - Install Posts (102- 203) - EB Outside Widening18-May-16
IBEBM-ST200PH IB - Temp Sheet Pile - EB Median Widening (Bridge over International DR)18-May-16
IBEBM-ST530PH IB - End Bent 4 - EB Median Widening (Bridge over Shingle Creek)18-May-16
IBWBM-ST140PH IB - Temp Sheet Pile - WB Median Widening (Bridge over International DR)18-May-16
IBEBM-ST380PH IB - Wall Bent 3 - EB Median Widening (Bridge over International DR)19-May-16
IBEBM-ST420PH IB - Curing for End Bent 3 - EB Median Widening (Bridge over International DR)19-May-16
IBWBM-ST320PH IB - Wall Bent 3 - WB Median Widening (Bridge over International DR)19-May-16
IBWBM-ST750PH IB - Curing for End Bent 3 - WB Median Widening (Bridge over International DR)19-May-16
IBEBM-ST980PH IB - Curing for End Bent 4 - EB Median Widening (Bridge over Shingle Creek)22-May-16
PRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)23-May-16
PRE-RA-020Review and Approve 992 Under deck Lighting23-May-16
IBWBM-ST760PH IB - Curing for End Bent 3 - WB Median Widening (Bridge over universal BLVD)23-May-16
IAEBO-W140PH IA - Install Posts (204-305) - EB Outside Widening26-May-16
IAEBO-IL100PH IA - Temp. ITS Relocate Existing - EB Outside Widening (SR528)10-Jun-16
IBEBM-ST260PH IB - Demo Traffic Rails - EB Median Widening (Bridge over universal BLVD)10-Jun-16
IBEBM-ST850PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over universal BLVD)10-Jun-16
IBEBM-ST900PH IB - Demo Bridge Deck - EB Median Widening (Bridge over universal BLVD)10-Jun-16
IBWBM-ST180PH IB - Demo Traffic Rail / End Bents - WB Median Widening (Bridge over universal BLVD)10-Jun-16
IBWBM-ST710PH IB - Demo Bridge Deck- WB Median Widening (Bridge over universal BLVD)10-Jun-16
IIBEBO-ST3PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge over International DR)13-Jun-16
IIBR-SP121PH IIB - Drainage - Ramp A13-Jun-16
IAEBO-W150PH IA - Install Posts (306- 409) - EB Outside Widening14-Jun-16
IIBR-GC171PH IIB - Clear & Grub/Demo - Ramp A15-Jun-16
IIBR-EW122PH IIB - Embankment - Ramp A21-Jun-16
IBEBM-ST210PH IB - Temp Sheet Pile - EB Median Widening (Bridge over John Young PKWY)21-Jun-16
IBEBM-ST560PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over International DR)24-Jun-16
IBWBM-ST400PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over International DR)24-Jun-16
IAEBO-W160PH IA - Install Panels (0-32000 SF) - EB Outside Widening29-Jun-16
IBWBM-ST200PH IB - Temp Sheet Pile - WB Median Widening (Bridge over universal BLVD)01-Jul-16
IAEBO-W170PH IA - Install Panels (32000-64000 SF) - EB Outside Widening05-Jul-16
IAEBO-W180PH IA - Install Panels (64000-96000 SF)- EB Outside Widening08-Jul-16
IBEBM-W140PH IB - Wire (mse) Retaining Wall TW 20 - EB Median Widening (SR528)08-Jul-16
IBWBM-W140PH IB - Wire (mse) Retaining Wall TW 21 - WB Median Widening (SR528)08-Jul-16
IAEBO-W190PH IA - Install Panels (96000-128000 SF)- EB Outside Widening12-Jul-16
IIIAWBO-ST30PH IIIA - Temp Sheet Pile - WB Outside Widening Area (Bridge over John Young PKWY)12-Jul-16
IIAR-SP100PH IIA - Jack & Bore (42" (Sta 351+00 near Duke energy access platform) - Ramp O13-Jul-16
IIBR-RW141PH IIB - Stabilization - Ramp A13-Jul-16
IAEBO-SP100PH IA - Jack & Bore 42" (Sta 351+00 near Duke energy access platform) - EB Outside Widening (SR528)13-Jul-16
IBWBM-ST250PH IB - Test Pile (H Piles) - WB Median Widening (Bridge over John Young PKWY)13-Jul-16
IIBEBO-ST21PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge 750629 Ramp S over JYP)14-Jul-16
IBEBM-ST220PH IB - Drive Production Pile (H Piles) - EB Median Widening (Bridge over John Young PKWY)15-Jul-16
IBWBM-ST310PH IB - Production Pile (H Piles) - WB Median Widening (Bridge over John Young PKWY)15-Jul-16
IIDEBO-ST120PH IID - Temp Sheet Pile - EB Outside Widening (Bridge over John Young PKWY)15-Jul-16
IIBEBO-ST1PH IIB - Construct Crane Access - EB Outside Widening (Bridge over International DR)18-Jul-16
IBEBM-TC110PH IB - Set Temp Traffic Barriers for Phase IIA - EB Median Widening18-Jul-16
IBEBM-TC130PH IB - Temp Striping for Phase IIA - EB Median Widening18-Jul-16
IBWBM-RW240PH IB - Pavement for Permanent Shoulder Construction (Universal-International Drv.) - WB Median Widening18-Jul-16
IBWBM-ST300PH IB - Temp Sheet Pile - WB Median Widening (Bridge over John Young PKWY)18-Jul-16
IIIBWBO-ST1PH IIIB - Construct Crane Access - WB Outside Widening Area (Bridge over International DR)18-Jul-16
IIIBWBO-ST3PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over International DR)18-Jul-16
IIIAWBO-ST16PH IIIA - Test Pile (H Piles) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)18-Jul-16
IBEBM-ST520PH IB - Wall Bent 5 - EB Median Widening (Bridge over John Young PKWY)22-Jul-16
IBEBM-ST570PH IB - End Bent 5 - EB Median Widening (Bridge over John Young PKWY)22-Jul-16
IBEBM-ST800PH IB - Approach Slabs - EB Median Widening (Bridge over Shingle Creek)22-Jul-16
IBWBM-ST490PH IB - Wall Bent 5 - WB Median Widening (Bridge over John Young PKWY)22-Jul-16
IBWBM-ST530PH IB - End Bent 5 - WB Median Widening (Bridge over John Young PKWY)22-Jul-16
PRE-PS-044Prepare and Submit 783 ITS Fiber Optic Cable26-Jul-16
IBEBM-ST320PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over International DR)26-Jul-16
IBWBM-ST270PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over International DR)26-Jul-16
IBEBM-W130PH IB - Wire (mse) Retaining Wall TW 18 - EB Median Widening (SR528)27-Jul-16
IBWBM-W120PH IB - Wire (mse) Retaining Wall TW 19 - WB Median Widening (SR528)27-Jul-16
IIBEBO-ST8PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge over International DR)27-Jul-16
IBEBM-ST640PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over universal BLVD)27-Jul-16
IBWBM-ST510PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over universal BLVD)27-Jul-16
IBEBM-ST480PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over John Young PKWY)28-Jul-16
IBWBM-ST450PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over John Young PKWY)28-Jul-16
IBWBO-SP140PH IB - Jack & Bore JYP to Int. Dr. (Sta 354+04 to 234+50)28-Jul-16
IIIBWBO-ST9PH IIIB - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over International DR)28-Jul-16
IAEBO-SP110PH IA - Drainage (42") @ JYP Interchange - EB Outside Widening (SR528)29-Jul-16
IBEBM-ST150PH IB - Demo Traffic Rails - EB Median Widening (Bridge over International DR)29-Jul-16
IBEBM-ST280PH IB - Temp Sheet Pile - EB Median Widening (Bridge over universal BLVD)29-Jul-16
IBEBM-ST720PH IB - Curing for End Bent 5 - EB Median Widening (Bridge over John Young PKWY)29-Jul-16
IBEBM-ST890PH IB - Demo Bridge Deck - EB Median Widening (Bridge over International DR)29-Jul-16
IBWBM-ST120PH IB - Demo Traffic Rail - WB Median Widening (Bridge over International DR)29-Jul-16
IBWBM-ST730PH IB - Demo Bridge Deck - WB Median Widening (Bridge over International DR)29-Jul-16
IBWBM-ST740PH IB - Curing for End Bent 5 - WB Median Widening (Bridge over John Young PKWY)29-Jul-16
IIIAWBO-ST17PH IIIA - Temp Sheet Pile - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)01-Aug-16
IIBR-RW151PH IIB - Base - Ramp A03-Aug-16
PRE-PS-046Prepare and Submit 684 ITS Managed Ethernet Hub Switch03-Aug-16
PRE-PS-047Prepare and Submit 785 ITS Uninterruptible Power Source (UPS)03-Aug-16
IBEBM-ST300PH IB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Median Widening (Bridge over International DR)03-Aug-16
IBWBM-ST220PH IB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Median Widening (Bridge over International DR)03-Aug-16
IBEBM-ST810PH IB - Grind and Groove - EB Median Widening (Bridge over Shingle Creek)04-Aug-16
IBEBM-ST510PH IB - End Bent 1 - EB Median Widening (Bridge over John Young PKWY)05-Aug-16
IBWBM-ST460PH IB - End Bent 1 - WB Median Widening (Bridge over John Young PKWY)05-Aug-16
IIBEBO-ST28PH IIB - Construct Crane Access - EB Outside Widening (Bridge over Shingle Creek)05-Aug-16
IBEBM-ST990PH IB - Bolt/Pin Temp B/W - EB Median Widening (Bridge over Shingle Creek)08-Aug-16
PRE-PS-015Prepare and Submit 548 Retaining/MSE Wall Systems09-Aug-16
IBEBM-ST440PH IB - Curing For Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Median Widening (Bridge over John Young PKWY)09-Aug-16
IBEBM-ST490PH IB - Wall Bent 1 - EB Median Widening (Bridge over John Young PKWY)09-Aug-16
IBWBM-ST370PH IB - Curing For Pier 2, 3, 4(Footer, Column & Pier Cap) - WB Median Widening (Bridge over John Young PKWY)09-Aug-16
IBWBM-ST420PH IB - Wall Bent 1 - WB Median Widening (Bridge over John Young PKWY)09-Aug-16
IIDEBO-ST170PH IID - Temp Sheet Pile Removal - EB Outside Widening (Bridge over John Young PKWY)10-Aug-16
IBEBM-ST610PH IB - Curing for Pier 2,(Footer, Column & Pier Cap) - EB Median Widening (Bridge over Universal BLVD)11-Aug-16
IBWBM-ST480PH IB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Median Widening (Bridge over Universal BLVD)11-Aug-16
IAEBO-W200PH IA - Install Panels (128000-160000 SF) - EB Outside Widening12-Aug-16
IIBEBO-ST6PH IIB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over International DR)12-Aug-16
IBWBM-ST190PH IB - Test Pile Concrete - WB Median Widening (Bridge over universal BLVD)12-Aug-16
IBWBM-ST210PH IB - Production Pile Concrete - WB Median Widening (Bridge over universal BLVD)12-Aug-16
IIBEBO-ST27PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge 750629 Ramp S over JYP)12-Aug-16
IIIAWBO-ST35PH IIIA - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over John Young PKWY)12-Aug-16
IIAR100PH IIA - Construct Ramp O Diversion - Ramp O15-Aug-16
IIIAWBO-ST23PH IIIA - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)15-Aug-16
PRE-FA-047Fabricate and Deliver 685 ITS Uninterruptible Power Source (UPS)16-Aug-16
PRE-RA-046Review and Approve 684 ITS Managed Ethernet Hub Switch16-Aug-16
PRE-RA-047Review and Approve 685 ITS Uninterruptible Power Source (UPS)16-Aug-16
IIIBWBO-ST6PH IIIB - Construct Crane Access - WB Outside Widening Area (Bridge over universal BLVD)16-Aug-16
IBEBM-ST290PH IB - Production Pile - EB Median Widening (Bridge over universal BLVD)17-Aug-16
IBEBO-EW110PH IB - Pond Excav/Embank JYP to TPK - EB Outside Widening19-Aug-16
IIBEBO-ST9PH IIB - Construct Crane Access - EB Outside Widening (Bridge over universal BLVD)22-Aug-16
PRE-PS-042Prepare and Submit 781 DMS25-Aug-16
IBEBM-ST680PH IB - End Bent 1 - EB Median Widening (Bridge over universal BLVD)25-Aug-16
IBWBM-ST540PH IB - End Bent 1 - WB Median Widening (Bridge over universal BLVD)25-Aug-16
PRE-RA-015Review and Approve 548 Retaining/MSE Wall Systems31-Aug-16
IIAR-TC140PH IIA - Temp Striping New Ramp Alignment - Ramp O07-Sep-16
IBEBM-TC210PH IB - Construct Diversion at Shingle Creek- EB Median Widening07-Sep-16
IIAEBO-TC120PH IIA - MOT Shift for Phase IIA - EB Outside Widening07-Sep-16
IBEBM-ST650PH IB - Wall Bent 1 - EB Median Widening (Bridge over universal BLVD)08-Sep-16
IBWBM-ST520PH IB - Wall Bent 1 - WB Median Widening (Bridge over universal BLVD)08-Sep-16
IBEBO-GC100PH IB - Remove Existing Overhead Sign (sta 356+25) & Foundation - EB Outside Widening09-Sep-16
IBWBO-GC100PH IB - Remove Existing Overhead Sign (sta 356+25) & Foundation - WB Outside Widening Area09-Sep-16
IBWBM-ST620PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over John Young PKWY)12-Sep-16
IIBR-GC191PH IIB - Performance Turf, SOD - Ramp A13-Sep-16
PRE-PS-025Prepare and Submit 635 Pull, Splice, & Junction Boxes13-Sep-16
IBR-IDS10PH IB - Install Drilled Shafts (1-13)14-Sep-16
PRE-PS-021Prepare and Submit 05500 Metal Fabrications16-Sep-16
PRE-RA-021Review and Approve 05500 Metal Fabrications16-Sep-16
IBEBM-ST740PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over John Young PKWY)16-Sep-16
GC-GCN130PH MS - Start Phase IIA Construction19-Sep-16
IBEBO-EW170PH IB - Pond Excav/Embank Int. Dr. to I-4 - WB Outside Widening19-Sep-16
IIIBWBO-ST5PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over International DR)20-Sep-16
IIDEBO-ST310PH IID - Pier 2, 3, 4 (F/R/P) ( Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)21-Sep-16
IIIAWBO-ST690PH IIIA - Pier 2, 3, 4 (F/R/P)(Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)22-Sep-16
IIIAWBO-ST710PH IIIA - Pier 2, 3, 4 (F/R/P) (Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)22-Sep-16
IIDEBO-ST160PH IID - Remove Concrete form for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over JYP)23-Sep-16
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)27-Sep-16
IIDEBO-ST150PH IID - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)28-Sep-16
IIIAWBO-ST21PH IIIA - Curing for Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)28-Sep-16
IIIAWBO-ST22PH IIIA - Remove Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T28-Sep-16
IIIAWBO-ST33PH IIIA - Curing of Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)28-Sep-16
IIIAWBO-ST34PH IIIA - Remove Concrete Form for Pier 2, 3, 4(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John28-Sep-16
IBWBM-ST660PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over universal BLVD)29-Sep-16
IBEBM-ST660PH IB - Set Beams - EB Median Widening (Bridge over John Young PKWY)02-Oct-16
IBWBM-ST560PH IB - Set Beams - WB Median Widening (Bridge over John Young PKWY)02-Oct-16
IIAR110PH IIA - Construct Ramp O Diversion - Ramp O (Tie in to EB)03-Oct-16
IIAEBO-TC100PH IIA - Install Sign & Traffic Control Devices - EB Outside Widening03-Oct-16
GC-GCN140PH MS - Start Phase II B Construction04-Oct-16
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)11-Oct-16
IIBEBO-ST110PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over Shingle Creek)11-Oct-16
IIBEBO-ST650PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over Shingle Creek)12-Oct-16
IIBEBO-ST660PH IIB - Remove Beams - EB Outside Widening (Bridge over Shingle Creek)12-Oct-16
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)13-Oct-16
IIBEBO-ST670PH IIB - Demo Pile Cap - EB Outside Widening (Bridge over Shingle Creek)13-Oct-16
IIBEBO-ST680PH IIB - Extract Piles - EB Outside Widening (Bridge over Shingle Creek)14-Oct-16
IBEBM-ST450PH IB - Set Beams - EB Median Widening (Bridge over International Drive)18-Oct-16
IBWBM-ST350PH IB - Set Beams - WB Median Widening (Bridge over International Drive)18-Oct-16
IIBEBO-ST11PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge over universal BLVD)18-Oct-16
IBEBM-ST750PH IB - Set Beams - EB Median Widening (Bridge over Universal BLVD)20-Oct-16
IBWBM-ST590PH IB - Set Beams - WB Median Widening (Bridge over Universal BLVD)20-Oct-16
IBWBM-SP120PH IB - Drainage for JYP to Int. Dr. (Sta 354+04 to 234+50)24-Oct-16
PRE-PS-029Prepare and Submit 033000 Cast-In-Place Concrete26-Oct-16
PRE-PS-031Prepare and Submit 081100 Metal Doors and Frames26-Oct-16
PRE-PS-032Prepare and Submit 099100 Painting Product Data and Sample26-Oct-16
IBWBM-RW130PH IB - Grade (JYP-Universal) - WB Median Widening31-Oct-16
IIIBWBO-ST8PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over universal BLVD)31-Oct-16
IBWBM-SP110PH IB - Drainage for JYP to STA 39002-Nov-16
IBWBM-RW140PH IB - Stabilization (JYP-Universal) - WB Median Widening03-Nov-16
IBWBO-SP100PH IB - Jack & Bore JYP Interchange (Sta 354 +04)09-Nov-16
IBWBM-RW150PH IB - Base (JYP-Universal) - WB Median Widening10-Nov-16
IBWBM-SP100PH IB - Drainage for JYP Interchange (Sta 354 +04)10-Nov-16
IAWBO-SP110PH IA - Drainage (42") @ JYP Interchange - WB Outside Widening Area (SR528)11-Nov-16
PRE-RA-031Review and Approve 081100 Metal Doors and Frames15-Nov-16
IIBEBO-ST690PH IIB - Pier 2, 3, 4 (F/R/P)(Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)15-Nov-16
PRE-RA-032Review and Approve 099100 Painting Product Data and Sample16-Nov-16
IIBEBO-ST26PH IIB - Remove of Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S ov17-Nov-16
IIBEBO-ST25PH IIB - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)21-Nov-16
IBEBM-ST460PH IB - Superstructure Deck - EB Median Widening (Bridge over International Drive)06-Dec-16
IIBEBO-ST14PH IIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)08-Dec-16
IIIBWBO-ST11PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)09-Dec-16
IBWBM-RW160PH IB - Grade (Universal-International Drv.) - WB Median Widening14-Dec-16
IBWBM-RW170PH IB - Stabilization (Universal-International Drv.) - WB Median Widening14-Dec-16
IBEBM-ST670PH IB - Superstructure Deck - EB Median Widening (Bridge over John Young PKWY)15-Dec-16
IBWBM-RW190PH IB - Grade (International Drive-I4) - WB Median Widening15-Dec-16
IBWBM-RW200PH IB - Stabilization (International Drv.-I4) - WB Median Widening15-Dec-16
IIBEBO-ST16PH IIB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)15-Dec-16
IIIBWBO-ST12PH IIIB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)15-Dec-16
IIBEBO-ST17PH IIB - Removal of Concrete Forms Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLV16-Dec-16
IIBEBO-ST18PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge over universal BLVD)16-Dec-16
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)16-Dec-16
IIIBWBO-ST13PH IIIB - Removal for Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Uni16-Dec-16
IIIBWBO-ST14PH IIIB - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over universal BLVD)16-Dec-16
IBR-AP120PH IB - Asphalt - Structural - Ramp C (Redundant)19-Dec-16
IBR-EW110PH IB - Embankment - Ramp C (Redundant)19-Dec-16
IBR-GC120PH IB - Guardrail (Roadway) - Ramp B/C Gore (Activity Not Req'd)19-Dec-16
IBR-GC130PH IB - Clear & Grub/Demo - Ramp C (Redundant)19-Dec-16
IBR-GC150PH IB - Performance Turf, SOD - Ramp C (Redundant)19-Dec-16
IBR-GC160PH IB - Guardrail (Roadway) - Ramp C (Redundant)19-Dec-16
IBR-RW120PH IB - Stabilization - Ramp C (Redundant)19-Dec-16
IBR-RW130PH IB - Base - Ramp C (Redundant)19-Dec-16
IBR-TC110PH IB - Set Temp Traffic Barriers - Ramp C (Redundant)19-Dec-16
IIBR-AP160PH IIB - Asphalt - Structural - Ramp I4- Interstate19-Dec-16
IIBR-EW180PH IIB - Embankment - Ramp I4- Interstate19-Dec-16
IIBR-GC300PH IIB - Demo - Ramp I4- Interstate19-Dec-16
IIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate19-Dec-16
IIBR-GC400PH IIB - Guardrail (Roadway) - Ramp I4- Interstate19-Dec-16
IIBR-RW210PH IIB - Stabilization - Ramp I4- Interstate19-Dec-16
IIBR-RW230PH IIB - Base - Ramp I4- Interstate19-Dec-16
IIBR-SP180PH IIB - Drainage (Temp) - Ramp I4 Interstate19-Dec-16
IIBR-SP190PH IIB - Drainage (Temp) - Ramp L19-Dec-16
IIBR-SP200PH IIB - Drainage (Temp) - Ramp U19-Dec-16
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate19-Dec-16
IIBR-TC360PH IIB - Temp Striping New Ramp Alignment - Ramp I4- Interstate19-Dec-16
IIBR-TC370PH IIB - MOT Shift New Ramp Alignment - Ramp I4- Interstate19-Dec-16
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C19-Dec-16
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening19-Dec-16
IIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T19-Dec-16
IBEBM-ST760PH IB - Superstructure Deck - EB Median Widening Bridge over Universal BLVD)10-Jan-17
IBWBM-ST360PH IB - Superstructure Deck - WB Median Widening (Bridge over International Drive)11-Jan-17
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)11-Jan-17
PRE-PS-006Prepare and Submit Precast Erection12-Jan-17
PRE-PS-022Prepare and Submit 133420 Pre-Engineered Precast Concrete Structure12-Jan-17
PRE-PS-038Prepare and Submit 238119 Packaged Air Conditioners12-Jan-17
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)13-Jan-17
IIBR-GC150PH IIB - Demo - Ramp S-116-Jan-17
IIBR-SP140PH IIB - Drainage (Temp) - Ramp S-116-Jan-17
IIBR-TC280PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I-116-Jan-17
IIBR-TC380PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp L16-Jan-17
IIBR-TC400PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp U16-Jan-17
IBEBO-EW120PH IB - Pond Excav/Embank I-4 to Int. Dr. - EB Outside Widening16-Jan-17
PRE-RA-038Review and Approve 238119 Packaged Air Conditioners17-Jan-17
IBEBM-ST550PH IB - Approach Slabs - EB Median Widening (Bridge over International DR)17-Jan-17
IBWBM-ST390PH IB - Approach Slabs - WB Median Widening (Bridge over International DR)17-Jan-17
IIBEBO-ST23PH IIB - Production Pile (H Piles) (32-62) -EB Outside Widening (Bridge 750629 Ramp S over JYP)17-Jan-17
IIBEBO-ST210PH IIB - Curing Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)17-Jan-17
IIBR151PH IIB - Construct Ramp L Diversion - Ramp L18-Jan-17
PRE-PS-036Prepare and Submit 232000 Piping and Specialties18-Jan-17
PRE-PS-039Prepare and Submit 260536 Cable Trays18-Jan-17
IBEBM-RW270PH IB - Stabilization (Universal - JYP) - EB Median Widening18-Jan-17
PRE-PS-001Prepare and Submit 506 Bridge Drainage System19-Jan-17
IBEBM-RW300PH IB - Base (Universal - JYP) - EB Median Widening20-Jan-17
IIBEBO-ST260PH IIB - End Bent 1 - EB Outside Widening (Bridge over Shingle Creek)20-Jan-17
GC-GCN170PH MS - Start Phase III B Construction23-Jan-17
PRE-RA-001Review and Approve 506 Bridge Drainage System24-Jan-17
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr24-Jan-17
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)24-Jan-17
PRE-RA-036Review and Approve 232000 Piping and Specialties25-Jan-17
IBEBM-ST840PH IB - Approach Slabs - EB Median Widening (Bridge over universal BLVD)25-Jan-17
IBWBM-ST580PH IB - Superstructure Deck - WB Median Widening (Bridge over John Young PKWY)25-Jan-17
IBWBM-ST600PH IB - Superstructure Deck - WB Median Widening Bridge over Universal BLVD)25-Jan-17
PRE-FA-036Fabricate and Deliver 232000 Piping and Specialties26-Jan-17
IBEBM-ST580PH IB - Lighting Conduit - EB Median Widening (Bridge over International DR)26-Jan-17
IBWBM-ST430PH IB - Lighting Conduit - WB Median Widening (Bridge over International DR)26-Jan-17
PRE-FA-001Fabricate and Deliver 506 Bridge Drainage System27-Jan-17
PRE-RA-025Review and Approve 635 Pull, Splice, & Junction Boxes27-Jan-17
IIBEBO-ST310PH IIB - End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)27-Jan-17
IIBR170PH IIB - Construct Ramp U Diversion - Ramp U30-Jan-17
TF-RA-001Review and Approve Precast Erection30-Jan-17
PRE-RA-022Review and Approve 133420 Pre-Engineered Precast Concrete Structure30-Jan-17
IBEBM-ST860PH IB - Lighting Conduit - EB Median Widening (Bridge over universal BLVD)30-Jan-17
IBWBM-ST650PH IB - Approach Slabs - WB Median Widening (Bridge over universal BLVD)30-Jan-17
IIBEBO-ST220PH IIB - End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)30-Jan-17
IBWBM-ST680PH IB - Lighting Conduit - WB Median Widening (Bridge over universal BLVD)31-Jan-17
IIBEBO-ST150PH IIB - End Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)31-Jan-17
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)31-Jan-17
IIBR-SP160PH IIB - Drainage (Temp) - Ramp H01-Feb-17
PRE-PS-023Prepare and Submit 263213 Engine Generator01-Feb-17
IBEBM-ST770PH IB - Lighting Conduit - EB Median Widening (Bridge over John Young PKWY)01-Feb-17
IBWBM-ST630PH IB - Lighting Conduit - WB Median Widening (Bridge over John Young PKWY)01-Feb-17
IIBEBO-ST120PH IIB - Wall Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)01-Feb-17
IIBEBO-ST180PH IIB - Wall Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)01-Feb-17
IIIBR120PH IIIB - Construct Ramp V Diversion - Ramp V02-Feb-17
IBEBM-RW230PH IB - Grade (International Drive - Universal) - EB Median Widening02-Feb-17
IIBEBO-ST740PH IIB - Curing for End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)03-Feb-17
IIBEBO-ST710PH IIB - Curing for End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)06-Feb-17
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening07-Feb-17
IBEBM-RW220PH IB - Grade (I4-International Drive) - EB Median Widening08-Feb-17
IBEBM-RW260PH IB - Stabilization (International Drive - Universal) - EB Median Widening08-Feb-17
IBEBM-ST590PH IB - Traffic Railing (32") - EB Median Widening (Bridge over International DR)08-Feb-17
IBWBM-ST440PH IB - Traffic Railing (32") - WB Median Widening (Bridge over International DR)08-Feb-17
PRE-RA-039Review and Approve 260536 Cable Trays09-Feb-17
IBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening10-Feb-17
IBEBM-ST870PH IB - Traffic Railing (32") - EB Median Widening (Bridge over universal BLVD)10-Feb-17
IBWBM-ST690PH IB - Traffic Railing (32") - WB Median Widening (Bridge over universal BLVD)10-Feb-17
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)11-Feb-17
IBWBM-RW180PH IB - Base (Universal-International Drv.) - WB Median Widening15-Feb-17
IBWBM-RW210PH IB - Base (International Drv.-I4) - WB Median Widening15-Feb-17
IBEBM-RW250PH IB - Stabilization (I4-international Drive) - EB Median Widening17-Feb-17
IBEBM-RW280PH IB - Base (I4-International Drive) - EB Median Widening17-Feb-17
IBEBM-RW310PH IB - Guard Rail Removal - EB Median Widening17-Feb-17
IIBEBO-ST280PH IIB - Set Beams - EB Outside Widening (Bridge 750629 Ramp S over JYP)17-Feb-17
IBEBM-ST600PH IB - Grind and Groove - EB Median Widening (Bridge over International DR)21-Feb-17
IBEBM-ST730PH IB - Approach Slabs - EB Median Widening (Bridge over John Young PKWY)21-Feb-17
IBWBM-ST470PH IB - Grind and Groove - WB Median Widening (Bridge over International DR)21-Feb-17
IBWBM-ST610PH IB - Approach Slabs - WB Median Widening (Bridge over John Young PKWY)21-Feb-17
PRE-PS-041Prepare and Submit 682 CCTV Camera22-Feb-17
IBEBM-ST880PH IB - Grind and Groove - EB Median Widening (Bridge over universal BLVD)22-Feb-17
IBWBM-ST700PH IB - Grind and Groove - WB Median Widening (Bridge over universal BLVD)22-Feb-17
IIBEBO-ST31PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)22-Feb-17
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-123-Feb-17
IIBR-TC300PH IIB - Temp Striping New Ramp Alignment - Ramp I-123-Feb-17
IIBEBO-ST490PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over Shingle Creek)25-Feb-17
IIBR-TC310PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp H27-Feb-17
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E28-Feb-17
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H28-Feb-17
GC-GCN150PH MS - Start Phase II C Construction28-Feb-17
IIBR-TC220PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp E28-Feb-17
IIBR-TC230PH IIB - Temp Striping New Ramp Alignment - Ramp E28-Feb-17
IIBR-TC320PH IIB - Temp Striping New Ramp Alignment - Ramp H28-Feb-17
IIBR-TC390PH IIB - Temp Striping New Ramp Alignment - Ramp L28-Feb-17
IBWBM-ST670PH IB - Grind and Groove - WB Median Widening (Bridge over John Young PKWY)28-Feb-17
PRE-RA-041Review and Approve 682 CCTV Camera01-Mar-17
IBEBM-ST790PH IB - Grind and Groove - EB Median Widening (Bridge over John Young PKWY)01-Mar-17
IBEBM-ST780PH IB - Traffic Railing (32") - EB Median Widening (Bridge over John Young PKWY)04-Mar-17
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)06-Mar-17
IBWBM-TC150PH IB - Construct Diversion at I-Drive - WB Median Widening06-Mar-17
IIBR-EW110PH IIB - Embankment - Ramp E07-Mar-17
IIBR-GC110PH IIB - Demo - Ramp E07-Mar-17
IIBR-GC240PH IIB - Demo - Ramp H07-Mar-17
PRE-PS-019Prepare and Submit 700 Highway Signing (Single, Multi, Panel, and Overhead)07-Mar-17
IBWBM-ST640PH IB - Traffic Railing (32") - WB Median Widening (Bridge over John Young PKWY)07-Mar-17
IIBR-TC410PH IIB - Temp Striping New Ramp Alignment - Ramp U09-Mar-17
PRE-RA-044Review and Approve 633 ITS Fiber Optic Cable09-Mar-17
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening09-Mar-17
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening11-Mar-17
IIBEBO-ST290PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge 750629 Ramp S over JYP)11-Mar-17
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-213-Mar-17
IIBR-TC330PH IIB - Temp Striping New Ramp Alignment - Ramp R-213-Mar-17
IIBR-TC340PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp R-213-Mar-17
IIBR-EW120PH IIB - Embankment - Ramp S-117-Mar-17
IIIBR-TC190PH IIIB - Temp Striping New Ramp Alignment - Ramp V17-Mar-17
IIIAWBO-ST230PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)17-Mar-17
IIBR-SP170PH IIB - Drainage (Temp) - Ramp R-220-Mar-17
IIBR-TC450PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp D20-Mar-17
IIBR-GC310PH IIB - Demo - Ramp L21-Mar-17
IIBR-GC130PH IIB - Demo - Ramp R-122-Mar-17
IIBR-GC290PH IIB - Demo - Ramp R-222-Mar-17
TF-CO-002Install Upright 1 D.S.23-Mar-17
PRE-PS-017Prepare and Submit 646 Aluminum Pedestal Poles23-Mar-17
PRE-PS-018Prepare and Submit 650 Traffic Signals23-Mar-17
PRE-PS-026Prepare and Submit 653 Pedestrian Signals23-Mar-17
PRE-PS-028Prepare and Submit 665 Pedestrian Detector23-Mar-17
IIIAWBO-ST200PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)23-Mar-17
TF-CO-005Install Upright 2 D.S.24-Mar-17
IIBR-EW200PH IIB - Embankment - Ramp U24-Mar-17
TF-CO-007Install Upright 3 D.S.28-Mar-17
PRE-PS-016Prepare and Submit 641 Prestressed Concrete Poles28-Mar-17
PRE-PS-035Prepare and Submit 231323 Aboveground Diesel Storage Tank and Piping28-Mar-17
PRE-PS-040Prepare and Submit 264113 Lighting Protection System Product Data and Shop Drawing28-Mar-17
PRE-PS-049Prepare and Submit 639 ITS Standby Generator Product Data and Shop Drawing28-Mar-17
PRE-RA-049Review and Approve 639 ITS Standby Generator Product Data and Shop Drawing28-Mar-17
PRE-PS-033Prepare and Submit 101400 Signage29-Mar-17
PRE-PS-045Prepare and Submit 660 ITS Vehicle Detection System29-Mar-17
IIIBR-GC180PH IIIB - Demo - Ramp V29-Mar-17
GC-GCN200PH MS - Start Phase III A Construction30-Mar-17
IIBR-GC350PH IIB - Demo - Ramp U30-Mar-17
IIAEBO-AP100PH IIA - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)30-Mar-17
TF-CO-011AS Build D.S.31-Mar-17
IIBR-EW160PH IIB - Embankment - Ramp H31-Mar-17
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)03-Apr-17
IIBEBO-ST350PH IIB - Superstructure Deck Finish Rebar\Set screed\Pouring - EB Outside Widening (Bridge 750629 Ramp S over JYP)05-Apr-17
IIIAWBO-ST19PH IIIA - Production Pile (H Piles) (33-65) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)05-Apr-17
PRE-RA-017Review and Approve 646 Aluminum Pedestal Poles06-Apr-17
PRE-RA-018Review and Approve 650 Traffic Signals06-Apr-17
PRE-RA-026Review and Approve 653 Pedestrian Signals06-Apr-17
PRE-RA-028Review and Approve 665 Pedestrian Detector06-Apr-17
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)06-Apr-17
IIBR-EW190PH IIB - Embankment - Ramp L07-Apr-17
IIBR-RW260PH IIB - Stabilization - Ramp U07-Apr-17
IIBR-TC440PH IIB - Temp Striping New Ramp Alignment - Ramp D11-Apr-17
IIBR-SP120PH IIB - Drainage (Temp) - Ramp R-112-Apr-17
IIBEBO-ST320PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over universal BLVD)12-Apr-17
IIBR-RES120PH IIB - Remove Existing Sign Structures (2-4)13-Apr-17
IIIAWBO-ST330PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Apr-17
IIBR-EW170PH IIB - Embankment - Ramp R-214-Apr-17
PRE-RA-033Review and Approve 101400 Signage14-Apr-17
IIBEBO-ST130PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over International DR)14-Apr-17
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)14-Apr-17
IIBR-TC250PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp C16-Apr-17
PRE-RA-040Review and Approve 264113 Lighting Protection System Product Data and Shop Drawing19-Apr-17
IIIAWBO-ST290PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)19-Apr-17
IIIBR-TC180PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp V20-Apr-17
IBEBM-W100PH IB - Median Wall - Grading (JYP to TPK)21-Apr-17
PRE-PS-034Prepare and Submit 231113 Fuel Oil Piping21-Apr-17
IIBEBO-ST600PH IIB - Lighting Conduit - EB Outside Widening (Bridge over Shingle Creek)21-Apr-17
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility24-Apr-17
IIIBR130PH IIIB - Construct Ramp K Diversion/Temp Pavement - Ramp K25-Apr-17
IBEBM-W110PH IB - Median Wall - FFP Footing/Stem (JYP to TPK)25-Apr-17
IBWBM-W100PH IB - Median Wall - Construct/ slip Top (JYP to TPK)25-Apr-17
PRE-RA-016Review and Approve 641 Prestressed Concrete Poles25-Apr-17
IIBEBO-ST610PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over Shingle Creek)25-Apr-17
IIIAWBO-ST340PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)26-Apr-17
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside Widening27-Apr-17
IIAR-EW100PH IIB - Embankment - Ramp O28-Apr-17
PRE-RA-019Review and Approve 700 Highway Signing (Single, Multi, Panel, and Overhead)01-May-17
IIBEBO-GC100PH IIB - MISC. Demo - EB Outside Widening01-May-17
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)01-May-17
IIIBR-TC210PH IIIB - Temp Striping New Ramp Alignment - Ramp K02-May-17
IIAR-SP110PH IIB - Drainage - Ramp O03-May-17
IIBR-IDS20PH IIB - Install Drilled Shafts (14-35)04-May-17
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)04-May-17
IIBR-EHM340PH IIB - Existing High Mast Removal (1-8)04-May-17
PRE-RA-034Review and Approve 231113 Fuel Oil Piping05-May-17
PRE-RA-035Review and Approve 231323 Aboveground Diesel Storage Tank and Piping05-May-17
PRE-FA-026Fabricate and Deliver 653 Pedestrian Signals08-May-17
PRE-FA-028Fabricate and Deliver 665 Pedestrian Detector08-May-17
PRE-FA-040Fabricate and Deliver 264113 Lighting Protection System Product Data and Shop Drawing08-May-17
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)09-May-17
IIBEBO-ST430PH IIB - Approach Slabs - EB Outside Widening (Bridge 750629 Ramp S over JYP)10-May-17
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)10-May-17
IIBEBO-ST630PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over International DR)11-May-17
IIBEBO-ST640PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over universal BLVD)11-May-17
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)11-May-17
IIIAWBO-ST31PH IIIA - Production Pile (H Piles) - WB Outside Widening Area (Bridge over John Young PKWY)11-May-17
IIIAWBO-ST410PH IIIA - Set Beams - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)11-May-17
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)12-May-17
PRE-PS-024Prepare and Submit 633 Communication Cable15-May-17
PRE-RA-042Review and Approve 781 DMS18-May-17
IIBEBO-ST460PH IIB - Lighting Conduit - EB Outside Widening (Bridge 750629 Ramp S over JYP)18-May-17
IIDEBO-ST340PH IID - Curing for End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)19-May-17
IIIBWBO-EW100PH IIIB - Surcharge/ Embankment 1 - WB Outside Widening Area19-May-17
IIBEBO-ST470PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge 750629 Ramp S over JYP)20-May-17
IBR-TC100PH IB - Set Temp Traffic Barriers - Ramp B/C Gore22-May-17
PRE-FA-029Fabricate and Deliver 033000 Cast-In-Place Concrete22-May-17
PRE-FA-037Fabricate and Deliver 233113 Ductwork Product Data and Shop Drawing22-May-17
PRE-PS-037Prepare and Submit 233113 Ductwork Product Data and Shop Drawing22-May-17
PRE-RA-023Review and Approve 263213 Engine Generator22-May-17
PRE-RA-037Review and Approve 233113 Ductwork Product Data and Shop Drawing22-May-17
IIIBR-EW120PH IIIB - Embankment - Ramp V22-May-17
IIBR-RW270PH IIB - Base - Ramp U24-May-17
IIAR-RW100PH IIB - Stabilization - Ramp O26-May-17
IBEBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening26-May-17
IIIAWBO-ST420PH IIIA - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)30-May-17
PRE-FA-039Fabricate and Deliver 260536 Cable Trays31-May-17
IIBEBO-ST10PH IIB - Test Pile - EB Outside Widening (Bridge over universal BLVD)02-Jun-17
IIBEBO-ST12PH IIB - Production Pile - EB Outside Widening (Bridge over universal BLVD)02-Jun-17
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles05-Jun-17
PRE-FA-033Fabricate and Deliver 101400 Signage05-Jun-17
PRE-RA-029Review and Approve 033000 Cast-In-Place Concrete07-Jun-17
IIBR-EHM350PH IIB - Existing High Mast Removal (9-18)07-Jun-17
IIBEBO-ST450PH IIB - End Bent 3 - EB Outside Widening (Bridge over universal BLVD)07-Jun-17
IIBR-SP110PH IIB - Drainage - Ramp E08-Jun-17
PRE-RA-024Review and Approve 633 Communication Cable08-Jun-17
PRE-RA-045Review and Approve 660 ITS Vehicle Detection System08-Jun-17
IBWBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening09-Jun-17
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)09-Jun-17
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)09-Jun-17
IIIBR-GC190PH IIIB - Demo - Ramp K13-Jun-17
IIBEBO-ST400PH IIB - End Bent 1 - EB Outside Widening (Bridge over universal BLVD)15-Jun-17
IIBEBO-ST420PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over universal BLVD)15-Jun-17
IIIBWBO-EW101PH IIIB - Surcharge/ Embankment 2 - WB Outside Widening Area16-Jun-17
PRE-PS-030Prepare and Submit 042200 Masonry20-Jun-17
IIBEBO-ST360PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over universal BLVD)20-Jun-17
IIIAWBO-ST520PH IIIA - Superstructure Deck Finish Rebar\Set Screed\ Pour - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)21-Jun-17
TF-CO-013Const. Screen Wall (Con.)22-Jun-17
PRE-FA-030Fabricate and Deliver 042200 Masonry22-Jun-17
IIBEBO-ST730PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over universal BLVD)22-Jun-17
TF-FA-001Fabricate and Deliver Precast Erection27-Jun-17
PRE-FA-022Fabricate and Deliver 133420 Pre-Engineered Precast Concrete Structure27-Jun-17
PRE-FA-032Fabricate and Deliver 099100 Painting Product Data and Sample27-Jun-17
TF-CO-004Precast Erection28-Jun-17
TF-CO-006FRP Conc. Roof Dec/c28-Jun-17
TF-CO-009Const. Roof System28-Jun-17
TF-CO-012Install Frames & Doors28-Jun-17
TF-CO-015Install HVAC28-Jun-17
PRE-RA-030Review and Approve 042200 Masonry29-Jun-17
TF-CO-001Foundation (FRP SOG)30-Jun-17
TF-CO-008Constr. Pedestal30-Jun-17
IIIBWBO-ST7PH IIIB - Test Pile - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-17
IIIBWBO-ST10PH IIIB - Production Pile - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-17
IIIBWBO-ST180PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-17
IIIBWBO-ST300PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-17
IBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening06-Jul-17
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)07-Jul-17
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)07-Jul-17
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)07-Jul-17
IIIBWBO-ST240PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)08-Jul-17
IIIBWBO-ST260PH IIIB - Wall Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)08-Jul-17
IIBR-SM440PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (A)11-Jul-17
IIIBWBO-ST220PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)11-Jul-17
IIAR-RW110PH IIB - Base - Ramp O12-Jul-17
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA12-Jul-17
IIIBWBO-ST640PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over universal BLVD)12-Jul-17
IIBR-SM480PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)13-Jul-17
PRE-FA-016Fabricate and Deliver 641 Prestressed Concrete Poles13-Jul-17
IIAR-AP100PH IIB - Asphalt - Structural - Ramp O14-Jul-17
IIBR-RW240PH IIB - Stabilization - Ramp L14-Jul-17
IIIBWBO-ST330PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)15-Jul-17
USDED-CO-002Duke Energy Distribution (B)17-Jul-17
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O18-Jul-17
IIIBR-SP100PH IIIB - Drainage (Temp) - Ramp G18-Jul-17
IIBEBO-ST480PH IIB - Set Beams - EB Outside Widening (Bridge over Universal BLVD)18-Jul-17
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)19-Jul-17
IIIBWBO-ST340PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Universal BLVD)19-Jul-17
IIBR-RW250PH IIB - Base - Ramp L21-Jul-17
IIIBWBO-EW102PH IIIB - Surcharge/ Embankment 3 - WB Outside Widening Area21-Jul-17
IIBR-RW150PH IIB - Stabilization - Ramp I-128-Jul-17
IIBR-RW170PH IIB - Base - Ramp I-104-Aug-17
IIBEBO-ST500PH IIB - Superstructure Deck SIP / Overhangs / Edges - EB Outside Widening (Bridge over Universal BLVD)07-Aug-17
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening09-Aug-17
IIBR-AP130PH IIB - Asphalt - Structural - Ramp I-110-Aug-17
IIIAWBO-ST570PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)11-Aug-17
IIBR-RW200PH IIB - Stabilization - Ramp R-217-Aug-17
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening17-Aug-17
IIBEBO-ST550PH IIB - Lighting Conduit - EB Outside Widening (Bridge over universal BLVD)17-Aug-17
TF-CO-010FRP Conc. Pad (Generator)18-Aug-17
TF-CO-022Construct Sidewalk18-Aug-17
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U18-Aug-17
IIBEBO-ST520PH IIB - Superstructure Deck Rebar - EB Outside Widening (Bridge over Universal BLVD)18-Aug-17
IIIAWBO-ST120PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)18-Aug-17
IIIAWBO-ST590PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)18-Aug-17
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-121-Aug-17
IIBR-AP170PH IIB - Asphalt - Structural - Ramp L21-Aug-17
IIBR-EW130PH IIB - Embankment - Ramp R-121-Aug-17
PRE-FA-021Fabricate and Deliver 05500 Metal Fabrications21-Aug-17
PRE-FA-031Fabricate and Deliver 081100 Metal Doors and Frames21-Aug-17
PRE-FA-038Fabricate and Deliver 238119 Packaged Air Conditioners21-Aug-17
IIIBWBO-EW103PH IIIB - Surcharge/ Embankment 4 - WB Outside Widening Area22-Aug-17
IIIBWBO-ST350PH IIIB - Superstructure Deck SIB & Start Rebar - WB Outside Widening (Area Bridge over Universal BLVD)22-Aug-17
IIBEBO-ST570PH IIB - Superstructure Deck Pour - EB Outside Widening (Bridge over Universal BLVD)23-Aug-17
IIIAWBO-ST111PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)23-Aug-17
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)23-Aug-17
IICR-TC200PH IIC - MOT Shift New Ramp Alignment - Ramp L24-Aug-17
IIIAWBO-ST140PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)24-Aug-17
IBWBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening25-Aug-17
PRE-FA-045Fabricate and Deliver 786 ITS Vehicle Detection System28-Aug-17
GC-GCN180PH MS - Start Phase III C Construction29-Aug-17
IIIAWBO-ST130PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)30-Aug-17
PRE-FA-042Fabricate and Deliver 781 DMS31-Aug-17
IIBEBO-ST530PH IIB - Approach Slabs - EB Outside Widening (Bridge over universal BLVD)31-Aug-17
IIIAWBO-ST170PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)06-Sep-17
PRE-PS-027Prepare and Submit 663 Signal Priority and Preemption Systems13-Sep-17
IIIBR-SP120PH IIIB - Drainage (Temp) - Ramp V17-Sep-17
IIIBR-SP130PH IIIB - Drainage (Temp) - Ramp K17-Sep-17
IIIBR-TC160PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp J17-Sep-17
IIIBR-TC200PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp K17-Sep-17
IIBR-GC140PH IIB - Demo - Ramp I-119-Sep-17
IIBR-EW150PH IIB - Embankment - Ramp I-122-Sep-17
IIIAWBO-ST600PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)24-Sep-17
PRE-RA-027Review and Approve 663 Signal Priority and Preemption Systems29-Sep-17
IIBEBO-ST560PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over universal BLVD)01-Oct-17
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)03-Oct-17
IIIBR-RW140PH IIIB - Stabilization - Ramp V04-Oct-17
IIIBWBO-ST100PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over Universal BLVD)05-Oct-17
IBWBM-RW220PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening06-Oct-17
IIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area06-Oct-17
IIBR-RW130PH IIB - Base - Ramp E09-Oct-17
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening09-Oct-17
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening09-Oct-17
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)09-Oct-17
IIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C11-Oct-17
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J12-Oct-17
IIIAWBO-AP100PH IIIA - Mill & Resurface (sacrificial) - WB Outside Widening Area (SR528)12-Oct-17
IIIAWBO-TC100PH IIIA - Install Sign & Traffic Control Devices - WB Outside Widening Area12-Oct-17
IIIAWBO-TC110PH IIIA - Temp Striping for Phase - WB Outside Widening Area (SR528)12-Oct-17
IIIAWBO-TC120PH IIIA - MOT Shift for Phase - WB Outside Widening Area12-Oct-17
IIIBWBO-TC110PH IIIB - Set Temp Traffic Barriers - WB Outside Widening Area12-Oct-17
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)13-Oct-17
IIBR-GC170PH IIB - Demo - Ramp C13-Oct-17
IIBR-RW220PH IIB - Base - Ramp R-213-Oct-17
IICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-113-Oct-17
IIIBWBO-ST460PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over universal BLVD)13-Oct-17
IIBR-RW290PH IIB - Shoulder Gutter - Ramp C15-Oct-17
IIBR-AP180PH IIB - Asphalt - Structural - Ramp U16-Oct-17
IIBR-RW120PH IIB - Stabilization - Ramp E16-Oct-17
IIBR-SM470PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)16-Oct-17
IIBR-SP130PH IIB - Drainage - Ramp I-117-Oct-17
IIIBR-RW150PH IIIB - Base - Ramp V17-Oct-17
IIIBWBO-ST470PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over universal BLVD)21-Oct-17
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)23-Oct-17
IIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)25-Oct-17
IICR-TC210PH IIC - MOT Shift New Ramp Alignment - Ramp U25-Oct-17
IIIBR-AP120PH IIIB - Asphalt - Structural - Ramp V25-Oct-17
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)25-Oct-17
IIICWBO-ST100PH IIIA - Demo Bridge - WB Outside Widening Area (Bridge over John Young PKWY)25-Oct-17
IIBR-IDS30PH IIB - Install Drilled Shafts (36-57)27-Oct-17
IIBR-RW180PH IIB - Stabilization - Ramp H27-Oct-17
IIIBR-RW160PH IIIB - Stabilization - Ramp K30-Oct-17
IIBR-EC10PH IIB - Erect Cantilevers (1-3)31-Oct-17
IIBR-ITS50PH IIB - Install ITS Poles (1-20)31-Oct-17
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)02-Nov-17
IIICWBO-ST220PH IIIA - Demo Bridge Deck - WB Outside Widening Area (Bridge over John Young PKWY)02-Nov-17
IIIBR-RW120PH IIIB - Stabilization - Ramp J03-Nov-17
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)03-Nov-17
IIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)04-Nov-17
IIIBR-RW130PH IIIB - Base - Ramp J08-Nov-17
IIBR-RW190PH IIB - Base - Ramp H09-Nov-17
IIIBR-TC120PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp G09-Nov-17
IIIBR-TC130PH IIIB - Temp Striping New Ramp Alignment - Ramp G10-Nov-17
IIIC-CP10PH IIIC - Construct Ped. Signalization at Ramps G&F12-Nov-17
IIBR-GC390PH IIB - Guardrail (Roadway) - Ramp R12-Nov-17
IIIBR-GC140PH IIIB - Demo - Ramp J15-Nov-17
TF-CO-016F+1 Generator17-Nov-17
TF-CO-017F+1 Fuel Tank17-Nov-17
IIIBWBO-W101PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over Universal BLVD)17-Nov-17
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping27-Nov-17
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)30-Nov-17
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-203-Dec-17
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G05-Dec-17
IIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)06-Dec-17
GC-GCN190PH MS - Start Phase II D Construction07-Dec-17
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R07-Dec-17
IICR-TC180PH IIC - MOT Shift New Ramp Alignment - Ramp H07-Dec-17
PRE-FA-018Fabricate and Deliver 650 Traffic Signals07-Dec-17
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping07-Dec-17
IIBEBO-IE20PH IIB - Install 2 Ea Mast Arms at Jyp07-Dec-17
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)07-Dec-17
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)07-Dec-17
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-208-Dec-17
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)08-Dec-17
IIBEBO-ST200PH IIB - End Bent 3 - EB Outside Widening (Bridge over International DR)08-Dec-17
TF-CO-025Install Equip. Arm Supports11-Dec-17
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)11-Dec-17
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)12-Dec-17
TF-CO-023Erect Truss13-Dec-17
IIIBR-EW100PH IIIB - Embankment - Ramp G13-Dec-17
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)14-Dec-17
IBEBO-SP150PH IB - Drainage (Pond 5C @ John Young) - EB Outside Widening (Ponds)15-Dec-17
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-216-Dec-17
IIBR-EW140PH IIB - Embankment - Ramp C18-Dec-17
IICR-TC160PH IIC - Temp Striping New Ramp Alignment - Ramp S-218-Dec-17
IICR-TC170PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp S-218-Dec-17
IIIBR-GC100PH IIIB - Demo - Ramp G18-Dec-17
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)18-Dec-17
IIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)18-Dec-17
IIIBWBO-SP110PH IIIB - Drainage (Universal - International) - WB Outside Widening Area (SR528)18-Dec-17
IICR-GC100PH IIC - Demo - Ramp S-220-Dec-17
IIIBR-EW130PH IIIB - Embankment - Ramp K20-Dec-17
IIBR-RW140PH IIB - Stabilization - Ramp C21-Dec-17
PRE-FA-023Fabricate and Deliver 263213 Engine Generator21-Dec-17
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems02-Jan-18
PRE-FA-049Fabricate and Deliver 262913 ITS Standby Generator Product Data and Shop Drawing02-Jan-18
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)03-Jan-18
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)03-Jan-18
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)03-Jan-18
IIBR-ITS30PH IIB - Install Conduit/Boxes (Univ to JYP)04-Jan-18
IIIBR-RW170PH IIIB - Base - Ramp K04-Jan-18
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)08-Jan-18
IIBR-SP150PH IIB - Drainage - Ramp C09-Jan-18
IIBR-GC220PH IIB - Guardrail (Roadway) - Ramp E10-Jan-18
IICR120PH IIC - Construct Ramp M Diversion - Ramp M12-Jan-18
IICR-TC1000PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp M12-Jan-18
IIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K12-Jan-18
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E15-Jan-18
PRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes15-Jan-18
PRE-FA-041Fabricate and Deliver 682 CCTV Camera15-Jan-18
IIIBR-TC170PH IIIB - Temp Striping New Ramp Alignment - Ramp J15-Jan-18
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E17-Jan-18
IIIAWBO-ST181PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge over John Young PKWY)18-Jan-18
IICR-TC1020PH IIC - Temp Striping New Ramp Alignment - Ramp M19-Jan-18
TF-CO-014Pull Wire & Install Light Fixtures22-Jan-18
TF-CO-018Install Lighting22-Jan-18
TF-CO-019Install Security System22-Jan-18
TF-CO-020Install Lightning Protection22-Jan-18
TF-CO-024Wall Treatments (Ply)22-Jan-18
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)22-Jan-18
IBEBO-EW150PH IB - Pond Excav/Embank Universal to Int. Dr. - EB Outside Widening22-Jan-18
IBEBO-EW160PH IB - Pond Excav/Embank Universal to JYP - EB Outside Widening22-Jan-18
IIIBR-SP160PH IIIB - Drainage (Temp) - Ramp Q22-Jan-18
IIBR-RW160PH IIB - Base - Ramp C24-Jan-18
IIBR-SP210PH IIB - Drainage - Ramp D26-Jan-18
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area26-Jan-18
IIIAWBO-ST580PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)31-Jan-18
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive01-Feb-18
IIBEBO-ST250PH IIB - Set Beams - EB Outside Widening (Bridge over International Drive)06-Feb-18
IIIBWBO-ST480PH IIIB - End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)06-Feb-18
IIICR110PH IIIC - Construct Ramp N Diversion - Ramp N07-Feb-18
IICR-GC170PH IIC - Demo - Ramp M07-Feb-18
IIIAWBO-ST150PH IIIA - Set Beams - WB Outside Widening Area (Bridge over John Young PKWY)07-Feb-18
IIICR-GC110PH IIIC - Demo - Ramp N08-Feb-18
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)08-Feb-18
IIBEBO-ST440PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge 750629 Ramp S over JYP)09-Feb-18
IIDEBO-ST260PH IID - Concrete Slope Pavement - EB Outside Widening (Bridge over John Young PKWY)09-Feb-18
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)09-Feb-18
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive12-Feb-18
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive12-Feb-18
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H16-Feb-18
IIIBWBO-ST520PH IIIB - Curing for End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)16-Feb-18
IICR-EW100PH IIC - Embankment - Ramp S-219-Feb-18
IICR-SP100PH IIC - Drainage - Ramp S-219-Feb-18
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening19-Feb-18
IBEBO-EW130PH IB - Pond Excav/Embank JYP to Universal - WB Outside Widening20-Feb-18
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening21-Feb-18
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening21-Feb-18
IBEBO-EW140PH IB - Pond Excav/Embank Universal to Int. Dr. - WB Outside Widening22-Feb-18
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)22-Feb-18
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)22-Feb-18
IIBR-ITS60PH IIB - Install ITS Poles (21-41)23-Feb-18
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)23-Feb-18
IIIBWBO-ST28PH IIIB - Rip Rap Under Bridge - WB Outside Widening Area (Bridge over Shingle Creek)23-Feb-18
IIIBR-EW140PH IIIB - Embankment - Ramp T28-Feb-18
IIIBR-RW100PH IIIB - Stabilization - Ramp G28-Feb-18
IIIBWBO-ST320PH IIIB - Curing for Pier 2, 3, (Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)28-Feb-18
IIDEBO-ST230PH IID - Set Beams - EB Outside Widening (Bridge over John Young PKWY)01-Mar-18
IICR-RW100PH IIC - Stabilization - Ramp S-202-Mar-18
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR02-Mar-18
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA02-Mar-18
IIBEBO-ST270PH IIB - Superstructure Deck - EB Outside Widening (Bridge over International Drive)02-Mar-18
IIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl03-Mar-18
IICR-RW110PH IIC - Base - Ramp S-209-Mar-18
IIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)12-Mar-18
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)14-Mar-18
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)15-Mar-18
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q16-Mar-18
IIBR-SM400PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)19-Mar-18
IIBR-SM410PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (C)19-Mar-18
IIBR-SM420PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (14 EA)19-Mar-18
IIBR-SM430PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (7 EA)19-Mar-18
IIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-119-Mar-18
IIIBR-TC270PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp Q19-Mar-18
IIIBR-TC280PH IIIB - Temp Striping New Ramp Alignment - Ramp Q19-Mar-18
IIICR-EW110PH IIIC - Embankment - Ramp N19-Mar-18
IIBEBO-ST370PH IIB - Lighting Conduit - EB Outside Widening (Bridge over International DR)19-Mar-18
PRE-FA-024Fabricate and Deliver 633 Communication Cable20-Mar-18
IIICR-TC140PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp N20-Mar-18
IIICR-TC150PH IIIC - Temp Striping New Ramp Alignment - Ramp N20-Mar-18
IIIBWBO-ST631PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over International DR)21-Mar-18
IIIBR-GC340PH IIIB - Demo - Ramp Q22-Mar-18
IIBEBO-ST380PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over International DR)22-Mar-18
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)22-Mar-18
IICR-AP100PH IIC - Asphalt - Structural - Ramp S-223-Mar-18
IIIBR-SP110PH IIIB - Drainage - Ramp J23-Mar-18
IIICR-SP110PH IIIC - Drainage - Ramp N23-Mar-18
IIBEBO-ST340PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over International DR)23-Mar-18
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S24-Mar-18
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)26-Mar-18
IIIBR-EW110PH IIIB - Embankment - Ramp J27-Mar-18
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J28-Mar-18
IIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K29-Mar-18
IICR-EW120PH IIC - Embankment - Ramp M30-Mar-18
IICR-GC110PH IIC - Performance Turf, SOD - Ramp S-230-Mar-18
IIBR-ITS70PH IIB - Install CCTV's (1-8)30-Mar-18
IIBR-ITS80PH IIB - Install CCTV's (9-16)30-Mar-18
IIBR-ITS90PH IIB - Install CCTV's (17-22)30-Mar-18
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)01-Apr-18
IIIBR-SM610PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)01-Apr-18
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)01-Apr-18
IIIBR-SM630PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (D)01-Apr-18
IIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)02-Apr-18
IIBR-EW210PH IIB - Embankment - Ramp D03-Apr-18
IICR-RW150PH IIC - Stabilization - Ramp M03-Apr-18
IIIBR-EC20PH IIIB - Erect Cantilevers (4-9)03-Apr-18
IIIBR-GC260PH IIIB - Guardrail (Roadway) - Ramp K03-Apr-18
GC-GCN160PH MS - Start Phase IV Construction05-Apr-18
IIIBR-AP110PH IIIB - Asphalt - Structural - Ramp J05-Apr-18
IIICR-RW120PH IIIC - Stabilization - Ramp N06-Apr-18
IIIBR-ET40PH IIIB - Erect Trusses (1-8)09-Apr-18
IIIAR110PH IIIA - Construct Ramp T Diversion - Ramps T12-Apr-18
IIIAWBO-ST160PH IIIA - Superstructure Deck - WB Outside Widening Area (Bridge over John Young PKWY)12-Apr-18
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems13-Apr-18
IIIBWBO-ST4PH IIIB - Production Pile - WB Outside Widening Area (Bridge over International DR)13-Apr-18
IIIAWBO-ST191PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge over John Young PKWY)13-Apr-18
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)13-Apr-18
IIBR-SM490PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)18-Apr-18
IIIAWBO-ST171PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge over John Young PKWY)20-Apr-18
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)25-Apr-18
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F25-Apr-18
IIIBR-TC250PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp P26-Apr-18
IIIBR-TC260PH IIIB - Temp Striping New Ramp Alignment - Ramp P26-Apr-18
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening27-Apr-18
IIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F29-Apr-18
IIIAWBO-ST201PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge over John Young PKWY)30-Apr-18
IIIBR-GC250PH IIIB - Demo - Ramp P30-Apr-18
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)02-May-18
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area02-May-18
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)04-May-18
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)05-May-18
IIICR-RW130PH IIIC - Base - Ramp N07-May-18
PRE-FA-044Fabricate and (Ready to) Deliver 783 ITS Fiber Optic Cable07-May-18
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)08-May-18
IICR-RW140PH IIC - Base - Ramp M09-May-18
IIBR-SM450PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (19 EA)10-May-18
IICR-SP120PH IIC - Drainage - Ramp M10-May-18
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)11-May-18
TF-CO-027Cont. HVAC11-May-18
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)11-May-18
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening11-May-18
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area11-May-18
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O12-May-18
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)12-May-18
IIICR-SP100PH IIIC - Drainage - Ramp F14-May-18
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area14-May-18
IIIBWBO-ST700PH IIIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - WB Outside Widening Area (Bridge over Shingle Creek)15-May-18
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area16-May-18
IVR-ET50PH IV - Erect Trusses (9-17)18-May-18
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive18-May-18
IIIBR-IDS40PH IIIB - Install Drilled Shafts (58-63)21-May-18
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)21-May-18
IIICR-EW100PH IIIC - Embankment - Ramp F22-May-18
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)22-May-18
PRE-FA-019Fabricate and Deliver 700 Highway Signing (Single, Multi, Panel, and Overhead)24-May-18
IIBR-SM380PH IIB - Shoulder Mount Light Pole/Service (I-4 to International) (14 EA)24-May-18
IIBR-SM390PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)24-May-18
IICR-AP120PH IIC - Asphalt - Structural - Ramp M24-May-18
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area24-May-18
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)25-May-18
IBR-IHM300PH IB - Install High Mast/Service (1-3)25-May-18
IIIBR-EW160PH IIIB - Embankment - Ramp Q25-May-18
IIIBR-RW220PH IIIB - Stabilization - Ramp Q25-May-18
IIICR-RW100PH IIIC - Stabilization - Ramp F25-May-18
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)25-May-18
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal29-May-18
IIIBR-SP150PH IIIB - Drainage - Ramp P30-May-18
IIBR-IHM310PH IIB - Install High Mast/Service (4-6)31-May-18
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q31-May-18
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)31-May-18
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)01-Jun-18
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N03-Jun-18
IIIBWBO-ST130PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over Shingle Creek)04-Jun-18
IIBR-EHM360PH IIB - Existing High Mast Removal (19-27)05-Jun-18
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)05-Jun-18
IIIBWBO-ST120PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over Shingle Creek)05-Jun-18
IIIBWBO-GC100PH IIIB - MISC. Demo - WB Outside Widening Area06-Jun-18
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)07-Jun-18
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle08-Jun-18
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)08-Jun-18
IIICR-RW110PH IIIC - Base - Ramp F08-Jun-18
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F12-Jun-18
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area21-Jun-18
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive23-Jun-18
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area25-Jun-18
IIIBR-RW180PH IIIB - Stabilization - Ramp T29-Jun-18
IIICR-GC160PH IIIC - Guardrail (Roadway) - Ramp N29-Jun-18
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle02-Jul-18
IVEBM-TC100PH IV - Shift EB traffic to outside I-Drive through Station 31203-Jul-18
IIIBR-RW230PH IIIB - Base - Ramp Q06-Jul-18
IIIBWBO-ST390PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over International Drive)07-Jul-18
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)09-Jul-18
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)11-Jul-18
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C12-Jul-18
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)13-Jul-18
IIIBWBO-ST690PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over International Drive)14-Jul-18
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)25-Jul-18
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)03-Aug-18
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area03-Aug-18
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)08-Aug-18
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle10-Aug-18
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman10-Aug-18
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle17-Aug-18
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P17-Aug-18
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle17-Aug-18
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express20-Aug-18
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)20-Aug-18
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside20-Aug-18
IIBR-GC260PH IIB - Guardrail (Roadway) - Ramp I-121-Aug-18
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R21-Aug-18
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area22-Aug-18
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express22-Aug-18
IIIBWBO-ST490PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over International DR)24-Aug-18
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 31127-Aug-18
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)31-Aug-18
IVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express05-Sep-18
IVEBM-W180PH IV - Median Wall - FFP Stem - Station 259+50 to 31108-Sep-18
IVWBM-RW240PH IV - Stabilization - Station 259+50 to 311 EB Express10-Sep-18
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 31110-Sep-18
IIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)10-Sep-18
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T11-Sep-18
IIDEBO-ST270PH IID - Lighting Conduit - EB Outside Widening (Bridge over John Young PKWY)13-Sep-18
IIIBWBO-ST530PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over International DR)13-Sep-18
IIBR-TC170PH IIB - Temp Striping for New Ramp Alignment - Ramp B17-Sep-18
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)19-Sep-18
IIIBWBO-ST540PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over International DR)19-Sep-18
IVR-ET60PH IV - Erect Trusses (18-24)27-Sep-18
IVEBO-SS100PH IV - Install OT Structures - East of JYP27-Sep-18
IIDEBO-ST290PH IID - Grind and Groove - EB Outside Widening (Bridge over John Young PKWY)28-Sep-18
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)28-Sep-18
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening05-Oct-18
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express05-Oct-18
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express05-Oct-18
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)06-Oct-18
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge10-Oct-18
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting12-Oct-18
IBR-EW100PH IB - Embankment - Ramp B/C Gore12-Oct-18
IVWBM-SP100PH IV - Drainage - Median Widening (East of 311)12-Oct-18
IBR-RW100PH IB - Stabilization - Ramp B/C Gore16-Oct-18
PRE-FA-046Fabricate and Deliver 784 ITS Managed Ethernet Hub Switch19-Oct-18
IBR-RW110PH IB - Base - Ramp B/C Gore19-Oct-18
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T19-Oct-18
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)19-Oct-18
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)19-Oct-18
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)19-Oct-18
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive19-Oct-18
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP22-Oct-18

The following issues were found:

IAWBO-EW100
Activity status has changed from "started" to "not started" in the current update
GC-GCN120
Activity has zero progress
GC-GCN130
Activity has zero progress
GC-GCN140
Activity has zero progress
GC-GCN170
Activity has zero progress
GC-GCN150
Activity has zero progress
GC-GCN200
Activity has zero progress
GC-GCN180
Activity has zero progress
GC-GCN190
Activity has zero progress
GC-GCN160
Activity has zero progress

This table represents activities with actual start dates bigger than data date in E8P02 Update No 36

Activity IDActivity DescriptionActual StartActual Finish
IVEBM-TC120PH IV - TCP Shift to Phase IV - EB traffic to outside at JYP22-Oct-1822-Oct-18

This table represents activities with no predecessor relationships in E8P02 Update No 36

Activity IDActivity Description
GC-DP100PH MS - NTP

This table represents activities with no successor relationships in E8P02 Update No 36

Activity IDActivity Description
GC-DP110PH MS - Project Completion

This table represents activities completed out-of-sequence in E8P02 Update No 36

Activity IDActivity DescriptionAct start dateParent end date
GC-GCN130PH MS - Start Phase IIA Construction19-Sep-1621-Oct-18
GC-GCN140PH MS - Start Phase II B Construction04-Oct-1621-Oct-18
GC-GCN150PH MS - Start Phase II C Construction28-Feb-1721-Oct-18
GC-GCN160PH MS - Start Phase IV Construction05-Apr-1822-Oct-18
GC-GCN170PH MS - Start Phase III B Construction23-Jan-1721-Oct-18
GC-GCN180PH MS - Start Phase III C Construction29-Aug-1721-Oct-18
GC-GCN190PH MS - Start Phase II D Construction07-Dec-1721-Oct-18
GC-GCN200PH MS - Start Phase III A Construction30-Mar-1721-Oct-18
GC-GCN220Written Suspend order - FOC related to pending change24-May-1821-Oct-18
IAWBO-SP110PH IA - Drainage (42") @ JYP Interchange - WB Outside Widening Area (SR528)10-Nov-1621-Oct-18
IBEBM-AP100PH IB - Asphalt - Structural - EB Median Widening (I-4 to I-Drive)02-Mar-1721-Oct-18
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)06-Feb-1721-Oct-18
IBEBM-AP120PH IB - Asphalt - Structural - EB Median Widening (Univ to JYP)23-Jan-1721-Oct-18
IBEBM-RW220PH IB - Grade (I4-International Drive) - EB Median Widening06-Feb-1721-Oct-18
IBEBM-RW230PH IB - Grade (International Drive - Universal) - EB Median Widening30-Jan-1721-Oct-18
IBEBM-RW240PH IB - Grade (Universal - JYP) - EB Median Widening19-Dec-1621-Oct-18
IBEBM-RW250PH IB - Stabilization (I4-international Drive) - EB Median Widening17-Feb-1721-Oct-18
IBEBM-RW260PH IB - Stabilization (International Drive - Universal) - EB Median Widening08-Feb-1721-Oct-18
IBEBM-RW270PH IB - Stabilization (Universal - JYP) - EB Median Widening18-Jan-1721-Oct-18
IBEBM-RW290PH IB - Base (International Drive - Universal) - EB Median Widening08-Feb-1721-Oct-18
IBEBM-RW300PH IB - Base (Universal - JYP) - EB Median Widening18-Jan-1721-Oct-18
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening01-Nov-1621-Oct-18
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening17-Nov-1621-Oct-18
IBEBM-ST450PH IB - Set Beams - EB Median Widening (Bridge over International Drive)13-Oct-1621-Oct-18
IBEBM-ST460PH IB - Superstructure Deck - EB Median Widening (Bridge over International Drive)24-Oct-1621-Oct-18
IBEBM-ST550PH IB - Approach Slabs - EB Median Widening (Bridge over International DR)12-Jan-1721-Oct-18
IBEBM-ST580PH IB - Lighting Conduit - EB Median Widening (Bridge over International DR)26-Jan-1721-Oct-18
IBEBM-ST590PH IB - Traffic Railing (32") - EB Median Widening (Bridge over International DR)07-Feb-1721-Oct-18
IBEBM-ST600PH IB - Grind and Groove - EB Median Widening (Bridge over International DR)20-Feb-1721-Oct-18
IBEBM-ST660PH IB - Set Beams - EB Median Widening (Bridge over John Young PKWY)27-Sep-1621-Oct-18
IBEBM-ST670PH IB - Superstructure Deck - EB Median Widening (Bridge over John Young PKWY)21-Oct-1621-Oct-18
IBEBM-ST730PH IB - Approach Slabs - EB Median Widening (Bridge over John Young PKWY)15-Feb-1721-Oct-18
IBEBM-ST750PH IB - Set Beams - EB Median Widening (Bridge over Universal BLVD)11-Oct-1621-Oct-18
IBEBM-ST760PH IB - Superstructure Deck - EB Median Widening Bridge over Universal BLVD)24-Oct-1621-Oct-18
IBEBM-ST770PH IB - Lighting Conduit - EB Median Widening (Bridge over John Young PKWY)01-Feb-1721-Oct-18
IBEBM-ST780PH IB - Traffic Railing (32") - EB Median Widening (Bridge over John Young PKWY)03-Mar-1721-Oct-18
IBEBM-ST790PH IB - Grind and Groove - EB Median Widening (Bridge over John Young PKWY)28-Feb-1721-Oct-18
IBEBM-ST840PH IB - Approach Slabs - EB Median Widening (Bridge over universal BLVD)20-Jan-1721-Oct-18
IBEBM-ST860PH IB - Lighting Conduit - EB Median Widening (Bridge over universal BLVD)30-Jan-1721-Oct-18
IBEBM-ST870PH IB - Traffic Railing (32") - EB Median Widening (Bridge over universal BLVD)09-Feb-1721-Oct-18
IBEBM-ST880PH IB - Grind and Groove - EB Median Widening (Bridge over universal BLVD)21-Feb-1721-Oct-18
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening23-Aug-1721-Oct-18
IBEBO-EW120PH IB - Pond Excav/Embank I-4 to Int. Dr. - EB Outside Widening16-Jan-1721-Oct-18
IBR-AP120PH IB - Asphalt - Structural - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-EW100PH IB - Embankment - Ramp B/C Gore08-Oct-1826-Oct-18
IBR-EW110PH IB - Embankment - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-GC120PH IB - Guardrail (Roadway) - Ramp B/C Gore (Activity Not Req'd)19-Dec-1626-Oct-18
IBR-GC130PH IB - Clear & Grub/Demo - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-GC150PH IB - Performance Turf, SOD - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-GC160PH IB - Guardrail (Roadway) - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-RW100PH IB - Stabilization - Ramp B/C Gore15-Oct-1826-Oct-18
IBR-RW110PH IB - Base - Ramp B/C Gore15-Oct-1826-Oct-18
IBR-RW120PH IB - Stabilization - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-RW130PH IB - Base - Ramp C (Redundant)19-Dec-1621-Oct-18
IBR-TC100PH IB - Set Temp Traffic Barriers - Ramp B/C Gore22-May-1721-Oct-18
IBR-TC110PH IB - Set Temp Traffic Barriers - Ramp C (Redundant)19-Dec-1621-Oct-18
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening16-Nov-1621-Oct-18
IBWBM-RW130PH IB - Grade (JYP-Universal) - WB Median Widening26-Oct-1621-Oct-18
IBWBM-RW140PH IB - Stabilization (JYP-Universal) - WB Median Widening28-Oct-1621-Oct-18
IBWBM-RW150PH IB - Base (JYP-Universal) - WB Median Widening03-Nov-1621-Oct-18
IBWBM-RW160PH IB - Grade (Universal-International Drv.) - WB Median Widening14-Dec-1621-Oct-18
IBWBM-RW170PH IB - Stabilization (Universal-International Drv.) - WB Median Widening14-Dec-1621-Oct-18
IBWBM-RW180PH IB - Base (Universal-International Drv.) - WB Median Widening14-Dec-1621-Oct-18
IBWBM-RW190PH IB - Grade (International Drive-I4) - WB Median Widening15-Dec-1621-Oct-18
IBWBM-RW200PH IB - Stabilization (International Drv.-I4) - WB Median Widening15-Dec-1621-Oct-18
IBWBM-RW210PH IB - Base (International Drv.-I4) - WB Median Widening15-Dec-1621-Oct-18
IBWBM-RW220PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening27-Oct-1621-Oct-18
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening15-Nov-1621-Oct-18
IBWBM-ST350PH IB - Set Beams - WB Median Widening (Bridge over International Drive)13-Oct-1621-Oct-18
IBWBM-ST360PH IB - Superstructure Deck - WB Median Widening (Bridge over International Drive)24-Oct-1621-Oct-18
IBWBM-ST390PH IB - Approach Slabs - WB Median Widening (Bridge over International DR)12-Jan-1721-Oct-18
IBWBM-ST430PH IB - Lighting Conduit - WB Median Widening (Bridge over International DR)26-Jan-1721-Oct-18
IBWBM-ST440PH IB - Traffic Railing (32") - WB Median Widening (Bridge over International DR)07-Feb-1721-Oct-18
IBWBM-ST470PH IB - Grind and Groove - WB Median Widening (Bridge over International DR)20-Feb-1721-Oct-18
IBWBM-ST560PH IB - Set Beams - WB Median Widening (Bridge over John Young PKWY)27-Sep-1621-Oct-18
IBWBM-ST580PH IB - Superstructure Deck - WB Median Widening (Bridge over John Young PKWY)18-Nov-1621-Oct-18
IBWBM-ST590PH IB - Set Beams - WB Median Widening (Bridge over Universal BLVD)11-Oct-1621-Oct-18
IBWBM-ST600PH IB - Superstructure Deck - WB Median Widening Bridge over Universal BLVD)06-Dec-1621-Oct-18
IBWBM-ST610PH IB - Approach Slabs - WB Median Widening (Bridge over John Young PKWY)15-Feb-1721-Oct-18
IBWBM-ST630PH IB - Lighting Conduit - WB Median Widening (Bridge over John Young PKWY)31-Jan-1721-Oct-18
IBWBM-ST640PH IB - Traffic Railing (32") - WB Median Widening (Bridge over John Young PKWY)06-Mar-1721-Oct-18
IBWBM-ST650PH IB - Approach Slabs - WB Median Widening (Bridge over universal BLVD)25-Jan-1721-Oct-18
IBWBM-ST670PH IB - Grind and Groove - WB Median Widening (Bridge over John Young PKWY)27-Feb-1721-Oct-18
IBWBM-ST680PH IB - Lighting Conduit - WB Median Widening (Bridge over universal BLVD)31-Jan-1721-Oct-18
IBWBM-ST690PH IB - Traffic Railing (32") - WB Median Widening (Bridge over universal BLVD)09-Feb-1721-Oct-18
IBWBM-ST700PH IB - Grind and Groove - WB Median Widening (Bridge over universal BLVD)21-Feb-1721-Oct-18
IBWBM-TC150PH IB - Construct Diversion at I-Drive - WB Median Widening08-Feb-1721-Oct-18
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)24-Oct-1622-Oct-18
IIAEBO-AP100PH IIA - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)29-Mar-1721-Oct-18
IIAR-AP100PH IIB - Asphalt - Structural - Ramp O26-Jun-1721-Oct-18
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O30-Apr-1821-Oct-18
IIAR-RW100PH IIB - Stabilization - Ramp O18-May-1721-Oct-18
IIAR-RW110PH IIB - Base - Ramp O30-May-1721-Oct-18
IIAR-TC120PH IIB - Construction 12' Widening on I-4 (Ramp C to EB I-4)24-Sep-1821-Oct-18
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive14-May-1821-Oct-18
IIBEBO-AP100PH IIB - Mill & Resurface (sacrificial) - EB Outside Widening (SR528)05-Apr-1721-Oct-18
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)29-Jan-1821-Oct-18
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)04-Aug-1721-Oct-18
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 32028-Jun-1721-Oct-18
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 33222-Jun-1721-Oct-18
IIBEBO-AP145PH IIB - Mill and resurface - EB Inside (I-4 to I-Drive)23-May-1821-Oct-18
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening16-Jun-1721-Oct-18
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening03-Oct-1621-Oct-18
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility10-Oct-1621-Oct-18
IIBEBO-GC100PH IIB - MISC. Demo - EB Outside Widening06-Feb-1721-Oct-18
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening20-Mar-1721-Oct-18
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening07-May-1821-Oct-18
IIBEBO-IE20PH IIB - Install 2 Ea Mast Arms at Jyp16-Aug-1721-Oct-18
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening04-Dec-1721-Oct-18
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening03-Apr-1721-Oct-18
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)17-Mar-1721-Oct-18
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening10-Jan-1821-Oct-18
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR10-Jul-1721-Oct-18
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)11-Jul-1721-Oct-18
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA12-Jul-1721-Oct-18
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA15-Jun-1721-Oct-18
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)17-Mar-1721-Oct-18
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)01-May-1721-Oct-18
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)08-Jan-1821-Oct-18
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)07-Nov-1621-Oct-18
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)20-Mar-1721-Oct-18
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)26-May-1721-Oct-18
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)08-May-1721-Oct-18
IIBEBO-SP150PH IIB - Gutter Drainage - STA 326 - 336 (EB Outside)05-Apr-1721-Oct-18
IIBEBO-SP160PH IIB - Gutter Drainage - STA 407 - 412 (EB Outside)08-Jan-1821-Oct-18
IIBEBO-ST10PH IIB - Test Pile - EB Outside Widening (Bridge over universal BLVD)10-Oct-1621-Oct-18
IIBEBO-ST11PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge over universal BLVD)17-Oct-1621-Oct-18
IIBEBO-ST110PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over Shingle Creek)10-Oct-1621-Oct-18
IIBEBO-ST12PH IIB - Production Pile - EB Outside Widening (Bridge over universal BLVD)17-Oct-1621-Oct-18
IIBEBO-ST120PH IIB - Wall Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)30-Jan-1721-Oct-18
IIBEBO-ST130PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over International DR)12-Apr-1721-Oct-18
IIBEBO-ST14PH IIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)31-Oct-1621-Oct-18
IIBEBO-ST140PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over International DR)06-Dec-1721-Oct-18
IIBEBO-ST150PH IIB - End Bent 1 - EB Outside Widening (Bridge 750629 Ramp S over JYP)24-Jan-1721-Oct-18
IIBEBO-ST16PH IIB - Curing for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)08-Dec-1621-Oct-18
IIBEBO-ST160PH IIB - End Bent 1 - EB Outside Widening (Bridge over International DR)02-Dec-1721-Oct-18
IIBEBO-ST17PH IIB - Removal of Concrete Forms Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLV15-Dec-1621-Oct-18
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)07-Nov-1621-Oct-18
IIBEBO-ST18PH IIB - Temp Sheet Pile Removal - EB Outside Widening (Bridge over universal BLVD)15-Dec-1621-Oct-18
IIBEBO-ST180PH IIB - Wall Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)13-Jan-1721-Oct-18
IIBEBO-ST190PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over International DR)08-Dec-1721-Oct-18
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)10-Aug-1721-Oct-18
IIBEBO-ST200PH IIB - End Bent 3 - EB Outside Widening (Bridge over International DR)05-Dec-1721-Oct-18
IIBEBO-ST210PH IIB - Curing Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)10-Jan-1721-Oct-18
IIBEBO-ST220PH IIB - End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)10-Jan-1721-Oct-18
IIBEBO-ST230PH IIB - Removal concrete form for Pier 2, 3, (Pile Cap) - EB Outside Widening (Bridge over Shingle Cr20-Jan-1721-Oct-18
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)11-Jan-1721-Oct-18
IIBEBO-ST25PH IIB - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)14-Nov-1621-Oct-18
IIBEBO-ST250PH IIB - Set Beams - EB Outside Widening (Bridge over International Drive)05-Feb-1821-Oct-18
IIBEBO-ST260PH IIB - End Bent 1 - EB Outside Widening (Bridge over Shingle Creek)11-Jan-1721-Oct-18
IIBEBO-ST270PH IIB - Superstructure Deck - EB Outside Widening (Bridge over International Drive)07-Feb-1821-Oct-18
IIBEBO-ST280PH IIB - Set Beams - EB Outside Widening (Bridge 750629 Ramp S over JYP)13-Feb-1721-Oct-18
IIBEBO-ST290PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge 750629 Ramp S over JYP)17-Feb-1721-Oct-18
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)17-Oct-1621-Oct-18
IIBEBO-ST300PH IIB - Wall Bent 4 - EB Outside Widening (Bridge over Shingle Creek)26-Jan-1721-Oct-18
IIBEBO-ST310PH IIB - End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)13-Jan-1721-Oct-18
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)02-Dec-1621-Oct-18
IIBEBO-ST320PH IIB - Demo Traffic Rails - EB Outside Widening (Bridge over universal BLVD)10-Apr-1721-Oct-18
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)01-Mar-1821-Oct-18
IIBEBO-ST340PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over International DR)29-Jan-1821-Oct-18
IIBEBO-ST350PH IIB - Superstructure Deck Finish Rebar\Set screed\Pouring - EB Outside Widening (Bridge 750629 Ramp S over JYP)10-Mar-1721-Oct-18
IIBEBO-ST360PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over universal BLVD)15-Jun-1721-Oct-18
IIBEBO-ST370PH IIB - Lighting Conduit - EB Outside Widening (Bridge over International DR)06-Mar-1821-Oct-18
IIBEBO-ST380PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over International DR)21-Mar-1821-Oct-18
IIBEBO-ST390PH IIB - Grind and Groove - EB Outside Widening (Bridge over International DR)30-Mar-1821-Oct-18
IIBEBO-ST400PH IIB - End Bent 1 - EB Outside Widening (Bridge over universal BLVD)06-Jun-1721-Oct-18
IIBEBO-ST410PH IIB - Set Beams - EB Outside Widening (Bridge over Shingle Creek)06-Feb-1721-Oct-18
IIBEBO-ST420PH IIB - Wall Bent 3 - EB Outside Widening (Bridge over universal BLVD)08-Jun-1721-Oct-18
IIBEBO-ST430PH IIB - Approach Slabs - EB Outside Widening (Bridge 750629 Ramp S over JYP)01-May-1721-Oct-18
IIBEBO-ST440PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge 750629 Ramp S over JYP)18-Dec-1721-Oct-18
IIBEBO-ST450PH IIB - End Bent 3 - EB Outside Widening (Bridge over universal BLVD)31-May-1721-Oct-18
IIBEBO-ST460PH IIB - Lighting Conduit - EB Outside Widening (Bridge 750629 Ramp S over JYP)17-May-1721-Oct-18
IIBEBO-ST470PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge 750629 Ramp S over JYP)19-May-1721-Oct-18
IIBEBO-ST480PH IIB - Set Beams - EB Outside Widening (Bridge over Universal BLVD)17-Jul-1721-Oct-18
IIBEBO-ST490PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over Shingle Creek)10-Feb-1721-Oct-18
IIBEBO-ST500PH IIB - Superstructure Deck SIP / Overhangs / Edges - EB Outside Widening (Bridge over Universal BLVD)21-Jul-1721-Oct-18
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)02-Jun-1721-Oct-18
IIBEBO-ST520PH IIB - Superstructure Deck Rebar - EB Outside Widening (Bridge over Universal BLVD)14-Aug-1721-Oct-18
IIBEBO-ST530PH IIB - Approach Slabs - EB Outside Widening (Bridge over universal BLVD)24-Aug-1721-Oct-18
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)27-Nov-1721-Oct-18
IIBEBO-ST550PH IIB - Lighting Conduit - EB Outside Widening (Bridge over universal BLVD)16-Aug-1721-Oct-18
IIBEBO-ST560PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over universal BLVD)30-Sep-1721-Oct-18
IIBEBO-ST570PH IIB - Superstructure Deck Pour - EB Outside Widening (Bridge over Universal BLVD)21-Aug-1721-Oct-18
IIBEBO-ST580PH IIB - Grind and Groove - EB Outside Widening (Bridge over universal BLVD)01-Nov-1721-Oct-18
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)27-Mar-1721-Oct-18
IIBEBO-ST600PH IIB - Lighting Conduit - EB Outside Widening (Bridge over Shingle Creek)20-Apr-1721-Oct-18
IIBEBO-ST610PH IIB - Traffic Railing (32") - EB Outside Widening (Bridge over Shingle Creek)24-Apr-1721-Oct-18
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)31-May-1721-Oct-18
IIBEBO-ST630PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over International DR)24-Apr-1721-Oct-18
IIBEBO-ST640PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over universal BLVD)24-Apr-1721-Oct-18
IIBEBO-ST650PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over Shingle Creek)11-Oct-1621-Oct-18
IIBEBO-ST660PH IIB - Remove Beams - EB Outside Widening (Bridge over Shingle Creek)11-Oct-1621-Oct-18
IIBEBO-ST670PH IIB - Demo Pile Cap - EB Outside Widening (Bridge over Shingle Creek)12-Oct-1621-Oct-18
IIBEBO-ST680PH IIB - Extract Piles - EB Outside Widening (Bridge over Shingle Creek)13-Oct-1621-Oct-18
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)24-Feb-1721-Oct-18
IIBEBO-ST710PH IIB - Curing for End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)30-Jan-1721-Oct-18
IIBEBO-ST720PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over International DR)11-Dec-1721-Oct-18
IIBEBO-ST730PH IIB - Curing for End Bent 3 - EB Outside Widening (Bridge over universal BLVD)15-Jun-1721-Oct-18
IIBEBO-ST740PH IIB - Curing for End Bent 4 - EB Outside Widening (Bridge over Shingle Creek)27-Jan-1721-Oct-18
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside Widening21-Mar-1721-Oct-18
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive31-Jul-1721-Oct-18
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive21-Aug-1721-Oct-18
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive11-Oct-1721-Oct-18
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)08-Aug-1721-Oct-18
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)09-Apr-1821-Oct-18
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening15-Aug-1821-Oct-18
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside05-Sep-1822-Oct-18
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E11-Oct-1721-Oct-18
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C01-Feb-1821-Oct-18
IIBR-AP130PH IIB - Asphalt - Structural - Ramp I-107-Aug-1721-Oct-18
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H29-Oct-1721-Oct-18
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-201-Sep-1721-Oct-18
IIBR-AP160PH IIB - Asphalt - Structural - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-AP170PH IIB - Asphalt - Structural - Ramp L21-Aug-1721-Oct-18
IIBR-AP180PH IIB - Asphalt - Structural - Ramp U11-May-1721-Oct-18
IIBR-EC10PH IIB - Erect Cantilevers (1-3)05-Oct-1721-Oct-18
IIBR-EHM340PH IIB - Existing High Mast Removal (1-8)01-Mar-1721-Oct-18
IIBR-EHM350PH IIB - Existing High Mast Removal (9-18)05-May-1721-Oct-18
IIBR-EHM360PH IIB - Existing High Mast Removal (19-27)21-Jun-1721-Oct-18
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)06-Apr-1824-Oct-18
IIBR-EW130PH IIB - Embankment - Ramp R-120-Mar-1721-Oct-18
IIBR-EW140PH IIB - Embankment - Ramp C09-Oct-1721-Oct-18
IIBR-EW150PH IIB - Embankment - Ramp I-118-Sep-1721-Oct-18
IIBR-EW160PH IIB - Embankment - Ramp H28-Nov-1621-Oct-18
IIBR-EW170PH IIB - Embankment - Ramp R-220-Mar-1721-Oct-18
IIBR-EW180PH IIB - Embankment - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-EW190PH IIB - Embankment - Ramp L03-Apr-1721-Oct-18
IIBR-EW210PH IIB - Embankment - Ramp D30-Mar-1821-Oct-18
IIBR-GC110PH IIB - Demo - Ramp E06-Mar-1721-Oct-18
IIBR-GC130PH IIB - Demo - Ramp R-121-Mar-1721-Oct-18
IIBR-GC140PH IIB - Demo - Ramp I-118-Sep-1721-Oct-18
IIBR-GC150PH IIB - Demo - Ramp S-116-Jan-1721-Oct-18
IIBR-GC170PH IIB - Demo - Ramp C12-Oct-1721-Oct-18
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E11-Jan-1821-Oct-18
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp C13-Aug-1821-Oct-18
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-131-Aug-1821-Oct-18
IIBR-GC220PH IIB - Guardrail (Roadway) - Ramp E08-Jan-1821-Oct-18
IIBR-GC240PH IIB - Demo - Ramp H07-Mar-1721-Oct-18
IIBR-GC260PH IIB - Guardrail (Roadway) - Ramp I-120-Aug-1821-Oct-18
IIBR-GC290PH IIB - Demo - Ramp R-221-Mar-1721-Oct-18
IIBR-GC300PH IIB - Demo - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-GC310PH IIB - Demo - Ramp L20-Mar-1721-Oct-18
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R20-Aug-1821-Oct-18
IIBR-GC340PH IIB - Performance Turf, SOD - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-GC350PH IIB - Demo - Ramp U29-Mar-1721-Oct-18
IIBR-GC390PH IIB - Guardrail (Roadway) - Ramp R12-Nov-1721-Oct-18
IIBR-GC400PH IIB - Guardrail (Roadway) - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-GC450PH IIB - Performance Turf, SOD - Ramp U17-Aug-1721-Oct-18
IIBR-IB180PH IIB - Install Bores/Boxes/Ped Signals at Ramp R07-Nov-1721-Oct-18
IIBR-IDS30PH IIB - Install Drilled Shafts (36-57)03-May-1721-Oct-18
IIBR-IHM310PH IIB - Install High Mast/Service (4-6)27-Oct-1621-Oct-18
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)07-Mar-1721-Oct-18
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)28-Sep-1621-Oct-18
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)24-Feb-1722-Oct-18
IIBR-ITS50PH IIB - Install ITS Poles (1-20)13-Jul-1722-Oct-18
IIBR-ITS60PH IIB - Install ITS Poles (21-41)06-Nov-1723-Oct-18
IIBR-ITS70PH IIB - Install CCTV's (1-8)13-Nov-1721-Oct-18
IIBR-ITS80PH IIB - Install CCTV's (9-16)13-Nov-1725-Oct-18
IIBR-ITS90PH IIB - Install CCTV's (17-22)20-Feb-1825-Oct-18
IIBR-RES120PH IIB - Remove Existing Sign Structures (2-4)20-Mar-1721-Oct-18
IIBR-RW120PH IIB - Stabilization - Ramp E31-Jul-1721-Oct-18
IIBR-RW130PH IIB - Base - Ramp E10-Aug-1721-Oct-18
IIBR-RW140PH IIB - Stabilization - Ramp C08-Nov-1721-Oct-18
IIBR-RW150PH IIB - Stabilization - Ramp I-124-Jul-1721-Oct-18
IIBR-RW160PH IIB - Base - Ramp C20-Nov-1721-Oct-18
IIBR-RW170PH IIB - Base - Ramp I-126-Jul-1721-Oct-18
IIBR-RW180PH IIB - Stabilization - Ramp H14-Aug-1721-Oct-18
IIBR-RW190PH IIB - Base - Ramp H03-Oct-1721-Oct-18
IIBR-RW200PH IIB - Stabilization - Ramp R-214-Aug-1721-Oct-18
IIBR-RW210PH IIB - Stabilization - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-RW220PH IIB - Base - Ramp R-222-Aug-1721-Oct-18
IIBR-RW230PH IIB - Base - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-RW240PH IIB - Stabilization - Ramp L05-Jul-1721-Oct-18
IIBR-RW250PH IIB - Base - Ramp L17-Jul-1721-Oct-18
IIBR-RW260PH IIB - Stabilization - Ramp U03-Apr-1721-Oct-18
IIBR-RW270PH IIB - Base - Ramp U12-Apr-1721-Oct-18
IIBR-RW290PH IIB - Shoulder Gutter - Ramp C15-Oct-1721-Oct-18
IIBR-RW320PH IIB - Stabilization - Ramp D02-Apr-1824-Oct-18
IIBR-SM380PH IIB - Shoulder Mount Light Pole/Service (I-4 to International) (14 EA)22-Jan-1821-Oct-18
IIBR-SM390PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)19-Dec-1621-Oct-18
IIBR-SM400PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)27-Mar-1721-Oct-18
IIBR-SM410PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (C)25-Apr-1721-Oct-18
IIBR-SM420PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (14 EA)16-Oct-1721-Oct-18
IIBR-SM430PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (7 EA)16-Oct-1721-Oct-18
IIBR-SM450PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (19 EA)10-May-1721-Oct-18
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)16-May-1721-Oct-18
IIBR-SM490PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)16-Oct-1721-Oct-18
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)07-Sep-1821-Oct-18
IIBR-SP100PH IIB - Drainage - Ramp B29-Mar-1805-Nov-18
IIBR-SP110PH IIB - Drainage - Ramp E22-May-1721-Oct-18
IIBR-SP120PH IIB - Drainage (Temp) - Ramp R-110-Apr-1721-Oct-18
IIBR-SP130PH IIB - Drainage - Ramp I-117-Jul-1721-Oct-18
IIBR-SP140PH IIB - Drainage (Temp) - Ramp S-116-Jan-1721-Oct-18
IIBR-SP150PH IIB - Drainage - Ramp C06-Nov-1721-Oct-18
IIBR-SP160PH IIB - Drainage (Temp) - Ramp H31-Jan-1721-Oct-18
IIBR-SP170PH IIB - Drainage (Temp) - Ramp R-220-Mar-1721-Oct-18
IIBR-SP180PH IIB - Drainage (Temp) - Ramp I4 Interstate19-Dec-1621-Oct-18
IIBR-SP190PH IIB - Drainage (Temp) - Ramp L19-Dec-1621-Oct-18
IIBR-SP200PH IIB - Drainage (Temp) - Ramp U19-Dec-1621-Oct-18
IIBR-SP210PH IIB - Drainage - Ramp D23-Jan-1821-Oct-18
IIBR-SP240PH IIB - Drainage - Ramp R-112-Jun-1721-Oct-18
IIBR-SP250PH IIB - Drainage - Ramp R-217-Apr-1721-Oct-18
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B17-Sep-1821-Oct-18
IIBR-TC170PH IIB - Temp Striping for New Ramp Alignment - Ramp B17-Sep-1821-Oct-18
IIBR-TC220PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp E27-Feb-1721-Oct-18
IIBR-TC230PH IIB - Temp Striping New Ramp Alignment - Ramp E28-Feb-1721-Oct-18
IIBR-TC250PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp C16-Apr-1721-Oct-18
IIBR-TC270PH IIB - Temp Striping New Ramp Alignment - Ramp C10-Oct-1721-Oct-18
IIBR-TC280PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I-116-Jan-1721-Oct-18
IIBR-TC290PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-TC300PH IIB - Temp Striping New Ramp Alignment - Ramp I-123-Feb-1721-Oct-18
IIBR-TC310PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp H27-Feb-1721-Oct-18
IIBR-TC320PH IIB - Temp Striping New Ramp Alignment - Ramp H28-Feb-1721-Oct-18
IIBR-TC330PH IIB - Temp Striping New Ramp Alignment - Ramp R-213-Mar-1721-Oct-18
IIBR-TC340PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp R-209-Mar-1721-Oct-18
IIBR-TC360PH IIB - Temp Striping New Ramp Alignment - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-TC370PH IIB - MOT Shift New Ramp Alignment - Ramp I4- Interstate19-Dec-1621-Oct-18
IIBR-TC380PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp L16-Jan-1721-Oct-18
IIBR-TC390PH IIB - Temp Striping New Ramp Alignment - Ramp L28-Feb-1721-Oct-18
IIBR-TC400PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp U16-Jan-1721-Oct-18
IIBR-TC410PH IIB - Temp Striping New Ramp Alignment - Ramp U09-Mar-1721-Oct-18
IIBR-TC440PH IIB - Temp Striping New Ramp Alignment - Ramp D10-Apr-1721-Oct-18
IIBR-TC450PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp D20-Mar-1721-Oct-18
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E07-Dec-1621-Oct-18
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-121-Nov-1621-Oct-18
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-106-Feb-1721-Oct-18
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-206-Feb-1721-Oct-18
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H06-Dec-1621-Oct-18
IIBR170PH IIB - Construct Ramp U Diversion - Ramp U04-Jan-1721-Oct-18
IICR-AP100PH IIC - Asphalt - Structural - Ramp S-219-Mar-1821-Oct-18
IICR-AP120PH IIC - Asphalt - Structural - Ramp M23-May-1821-Oct-18
IICR-EW100PH IIC - Embankment - Ramp S-204-Oct-1621-Oct-18
IICR-EW120PH IIC - Embankment - Ramp M28-Aug-1721-Oct-18
IICR-GC100PH IIC - Demo - Ramp S-218-Dec-1721-Oct-18
IICR-GC110PH IIC - Performance Turf, SOD - Ramp S-230-Mar-1821-Oct-18
IICR-GC120PH IIC - Guardrail (Roadway) - Ramp S22-Mar-1821-Oct-18
IICR-GC170PH IIC - Demo - Ramp M05-Feb-1821-Oct-18
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M24-May-1821-Oct-18
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-202-Jan-1821-Oct-18
IICR-RW100PH IIC - Stabilization - Ramp S-212-Feb-1821-Oct-18
IICR-RW110PH IIC - Base - Ramp S-228-Feb-1821-Oct-18
IICR-RW140PH IIC - Base - Ramp M03-Apr-1821-Oct-18
IICR-RW150PH IIC - Stabilization - Ramp M02-Mar-1821-Oct-18
IICR-RW330PH IIC - Complete Widening - Ramp E12-Feb-1821-Oct-18
IICR-RW340PH IIC - Complete Widening - Ramp H29-Nov-1721-Oct-18
IICR-RW350PH IIC - Complete Widening - Ramp I-127-Nov-1702-Nov-18
IICR-RW360PH IIC - Complete Widening - Ramp L14-Dec-1721-Oct-18
IICR-SP100PH IIC - Drainage - Ramp S-217-Jul-1721-Oct-18
IICR-SP120PH IIC - Drainage - Ramp M08-Jul-1721-Oct-18
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In18-Jul-1721-Oct-18
IICR-TC1000PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp M10-Jan-1821-Oct-18
IICR-TC1020PH IIC - Temp Striping New Ramp Alignment - Ramp M18-Jan-1821-Oct-18
IICR-TC120PH IIC - MOT Shift New Ramp Alignment - Ramp E16-Jan-1821-Oct-18
IICR-TC130PH IIC - MOT Shift New Ramp Alignment - Ramp O17-Jul-1721-Oct-18
IICR-TC140PH IIC - MOT Shift for New Ramp Alignment - Ramp C19-Dec-1621-Oct-18
IICR-TC150PH IIC - MOT Shift New Ramp Alignment - Ramp I-112-Oct-1721-Oct-18
IICR-TC160PH IIC - Temp Striping New Ramp Alignment - Ramp S-216-Dec-1721-Oct-18
IICR-TC170PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp S-213-Dec-1721-Oct-18
IICR-TC180PH IIC - MOT Shift New Ramp Alignment - Ramp H06-Dec-1721-Oct-18
IICR-TC190PH IIC - MOT Shift New Ramp Alignment - Ramp R-207-Dec-1721-Oct-18
IICR-TC200PH IIC - MOT Shift New Ramp Alignment - Ramp L23-Aug-1721-Oct-18
IICR-TC210PH IIC - MOT Shift New Ramp Alignment - Ramp U24-Oct-1721-Oct-18
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-215-Feb-1721-Oct-18
IICR120PH IIC - Construct Ramp M Diversion - Ramp M28-Aug-1721-Oct-18
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 36922-Jan-1821-Oct-18
IIDEBO-ST150PH IID - Curing for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)21-Sep-1621-Oct-18
IIDEBO-ST180PH IID - Demo Traffic Rails - EB Outside Widening (Bridge over John Young PKWY)19-Feb-1821-Oct-18
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)17-Jul-1821-Oct-18
IIDEBO-ST200PH IID - End Bent 1 - EB Outside Widening (Bridge over John Young PKWY)08-May-1721-Oct-18
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)30-Jul-1821-Oct-18
IIDEBO-ST220PH IID - End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)09-May-1721-Oct-18
IIDEBO-ST230PH IID - Set Beams - EB Outside Widening (Bridge over John Young PKWY)27-Feb-1821-Oct-18
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)03-Jun-1821-Oct-18
IIDEBO-ST250PH IID - Approach Slabs - EB Outside Widening (Bridge over John Young PKWY)31-Aug-1821-Oct-18
IIDEBO-ST260PH IID - Concrete Slope Pavement - EB Outside Widening (Bridge over John Young PKWY)29-Jan-1821-Oct-18
IIDEBO-ST270PH IID - Lighting Conduit - EB Outside Widening (Bridge over John Young PKWY)13-Sep-1821-Oct-18
IIDEBO-ST280PH IID - Traffic Railing (32") - EB Outside Widening (Bridge over JYP)17-Sep-1821-Oct-18
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)20-Mar-1821-Oct-18
IIDEBO-ST330PH IID - Superstructure Deck Finish Rebar\Set Screed\ Pour - EB Outside Widening (Bridge over John Young PKWY)20-Aug-1821-Oct-18
IIDEBO-ST340PH IID - Curing for End Bent 5 - EB Outside Widening (Bridge over John Young PKWY)12-May-1721-Oct-18
IIDR-TC100PH IID - MOT Shift New Ramp Alignment - Ramp S-118-Mar-1821-Oct-18
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)10-Jan-1721-Oct-18
IIIAR110PH IIIA - Construct Ramp T Diversion - Ramps T05-Mar-1822-Oct-18
IIIAR120PH IIIA - Construct Ramp Diversion P - Ramp P (Tie-in to SC Diversion)12-Oct-1721-Oct-18
IIIAWBO-AP100PH IIIA - Mill & Resurface (sacrificial) - WB Outside Widening Area (SR528)11-Oct-1721-Oct-18
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)24-Apr-1721-Oct-18
IIIAWBO-ST111PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)21-Aug-1721-Oct-18
IIIAWBO-ST120PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge over John Young PKWY)14-Aug-1721-Oct-18
IIIAWBO-ST130PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)25-Aug-1721-Oct-18
IIIAWBO-ST140PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)21-Aug-1721-Oct-18
IIIAWBO-ST150PH IIIA - Set Beams - WB Outside Widening Area (Bridge over John Young PKWY)05-Feb-1821-Oct-18
IIIAWBO-ST160PH IIIA - Superstructure Deck - WB Outside Widening Area (Bridge over John Young PKWY)07-Feb-1821-Oct-18
IIIAWBO-ST170PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge over John Young PKWY)30-Aug-1721-Oct-18
IIIAWBO-ST171PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge over John Young PKWY)12-Apr-1821-Oct-18
IIIAWBO-ST181PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge over John Young PKWY)08-Jan-1821-Oct-18
IIIAWBO-ST191PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge over John Young PKWY)11-Apr-1821-Oct-18
IIIAWBO-ST200PH IIIA - Wall Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)17-Mar-1721-Oct-18
IIIAWBO-ST201PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge over John Young PKWY)23-Apr-1821-Oct-18
IIIAWBO-ST21PH IIIA - Curing for Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)21-Sep-1621-Oct-18
IIIAWBO-ST211PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge over John Young PKWY)10-Jul-1821-Oct-18
IIIAWBO-ST230PH IIIA - End Bent 1 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)15-Mar-1721-Oct-18
IIIAWBO-ST24PH IIIA - Construct Crane Access - WB Outside Widening Area (Bridge over Shingle Creek)20-Oct-1721-Oct-18
IIIAWBO-ST290PH IIIA - Wall Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Apr-1721-Oct-18
IIIAWBO-ST33PH IIIA - Curing of Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)21-Sep-1621-Oct-18
IIIAWBO-ST330PH IIIA - End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)05-Apr-1721-Oct-18
IIIAWBO-ST340PH IIIA - Curing for End Bent 5 - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)19-Apr-1721-Oct-18
IIIAWBO-ST410PH IIIA - Set Beams - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)10-May-1721-Oct-18
IIIAWBO-ST420PH IIIA - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)15-May-1721-Oct-18
IIIAWBO-ST520PH IIIA - Superstructure Deck Finish Rebar\Set Screed\ Pour - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)31-May-1721-Oct-18
IIIAWBO-ST570PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)02-Aug-1721-Oct-18
IIIAWBO-ST580PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)13-Dec-1721-Oct-18
IIIAWBO-ST590PH IIIA - Lighting Conduit - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)17-Aug-1721-Oct-18
IIIAWBO-ST600PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)23-Sep-1721-Oct-18
IIIAWBO-ST620PH IIIA - Grind and Groove - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)01-Nov-1721-Oct-18
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)15-Nov-1721-Oct-18
IIIAWBO-TC100PH IIIA - Install Sign & Traffic Control Devices - WB Outside Widening Area11-Oct-1721-Oct-18
IIIAWBO-TC110PH IIIA - Temp Striping for Phase - WB Outside Widening Area (SR528)11-Oct-1721-Oct-18
IIIAWBO-TC120PH IIIA - MOT Shift for Phase - WB Outside Widening Area11-Oct-1721-Oct-18
IIIAWBO-TC130PH IIIA - Set Temp Traffic Barriers - WB Outside Widening Area04-Oct-1721-Oct-18
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G05-Mar-1822-Oct-18
IIIBR-AP110PH IIIB - Asphalt - Structural - Ramp J03-Apr-1822-Oct-18
IIIBR-AP120PH IIIB - Asphalt - Structural - Ramp V23-Oct-1722-Oct-18
IIIBR-AP130PH IIIB - Asphalt - Structural - Ramp K10-Jan-1822-Oct-18
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T20-Aug-1805-Nov-18
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle31-Jul-1822-Oct-18
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q29-May-1822-Oct-18
IIIBR-EC20PH IIIB - Erect Cantilevers (4-9)04-Dec-1721-Oct-18
IIIBR-ET40PH IIIB - Erect Trusses (1-8)21-Aug-1721-Oct-18
IIIBR-EW100PH IIIB - Embankment - Ramp G27-Nov-1722-Oct-18
IIIBR-EW110PH IIIB - Embankment - Ramp J12-Mar-1822-Oct-18
IIIBR-EW120PH IIIB - Embankment - Ramp V18-May-1722-Oct-18
IIIBR-EW130PH IIIB - Embankment - Ramp K05-Oct-1722-Oct-18
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle10-May-1822-Oct-18
IIIBR-EW160PH IIIB - Embankment - Ramp Q21-Mar-1822-Oct-18
IIIBR-GC100PH IIIB - Demo - Ramp G07-Dec-1721-Oct-18
IIIBR-GC140PH IIIB - Demo - Ramp J13-Nov-1722-Oct-18
IIIBR-GC150PH IIIB - Performance Turf, SOD - Ramp J27-Mar-1822-Oct-18
IIIBR-GC180PH IIIB - Demo - Ramp V28-Mar-1722-Oct-18
IIIBR-GC190PH IIIB - Demo - Ramp K12-Jun-1722-Oct-18
IIIBR-GC220PH IIIB - Performance Turf, SOD - Ramp K28-Mar-1822-Oct-18
IIIBR-GC250PH IIIB - Demo - Ramp P27-Apr-1822-Oct-18
IIIBR-GC260PH IIIB - Guardrail (Roadway) - Ramp K02-Apr-1822-Oct-18
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P12-Jul-1822-Oct-18
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle02-Aug-1822-Oct-18
IIIBR-GC340PH IIIB - Demo - Ramp Q19-Mar-1822-Oct-18
IIIBR-GC370PH IIIB - Demo - Median Widening STA 2030+00 to STA 217+00 - (Redundant)15-Oct-1825-Oct-18
IIIBR-GC380PH IIIB - Base - Median Widening STA 2030+00 to STA 217+00 - (Redundant)08-Oct-1825-Oct-18
IIIBR-IDS40PH IIIB - Install Drilled Shafts (58-63)06-Nov-1721-Oct-18
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)14-Mar-1722-Oct-18
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)02-Apr-1821-Oct-18
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)13-Nov-1721-Oct-18
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)10-Jul-1722-Oct-18
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)26-Jun-1722-Oct-18
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)01-May-1801-Nov-18
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)13-Nov-1708-Nov-18
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)01-Mar-1808-Nov-18
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware16-Oct-1723-Oct-18
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal06-Apr-1822-Oct-18
IIIBR-RW100PH IIIB - Stabilization - Ramp G20-Dec-1722-Oct-18
IIIBR-RW110PH IIIB - Base - Ramp G08-Jan-1822-Oct-18
IIIBR-RW120PH IIIB - Stabilization - Ramp J30-Oct-1722-Oct-18
IIIBR-RW130PH IIIB - Base - Ramp J02-Nov-1722-Oct-18
IIIBR-RW140PH IIIB - Stabilization - Ramp V02-Oct-1722-Oct-18
IIIBR-RW150PH IIIB - Base - Ramp V04-Oct-1722-Oct-18
IIIBR-RW160PH IIIB - Stabilization - Ramp K18-Oct-1722-Oct-18
IIIBR-RW170PH IIIB - Base - Ramp K31-Oct-1722-Oct-18
IIIBR-RW180PH IIIB - Stabilization - Ramp T23-Oct-1722-Oct-18
IIIBR-RW190PH IIIB - Base - Ramp T30-Oct-1722-Oct-18
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle08-Jun-1822-Oct-18
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle17-Jul-1822-Oct-18
IIIBR-RW220PH IIIB - Stabilization - Ramp Q09-Apr-1822-Oct-18
IIIBR-RW230PH IIIB - Base - Ramp Q10-May-1822-Oct-18
IIIBR-RW240PH IIIB - Median Wall - Median Widening STA 2030+00 to STA 217+00 - (Redundant)24-Sep-1825-Oct-18
IIIBR-RW250PH IIIB - Stabilization - Median Widening STA 2030+00 to STA 217+00 - (Redundant)12-Oct-1825-Oct-18
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T05-Jun-1805-Nov-18
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T29-May-1822-Oct-18
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)10-Sep-1821-Oct-18
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)15-Jun-1721-Oct-18
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)13-Nov-1721-Oct-18
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)19-Dec-1621-Oct-18
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)21-May-1821-Oct-18
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)10-Sep-1821-Oct-18
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)17-Oct-1621-Oct-18
IIIBR-SM610PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)17-Oct-1621-Oct-18
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)17-Oct-1621-Oct-18
IIIBR-SM630PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (D)13-Nov-1721-Oct-18
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)10-Sep-1821-Oct-18
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)10-Sep-1825-Oct-18
IIIBR-SP100PH IIIB - Drainage (Temp) - Ramp G17-Jul-1722-Oct-18
IIIBR-SP110PH IIIB - Drainage - Ramp J08-Feb-1821-Oct-18
IIIBR-SP120PH IIIB - Drainage (Temp) - Ramp V17-Sep-1722-Oct-18
IIIBR-SP130PH IIIB - Drainage (Temp) - Ramp K17-Sep-1722-Oct-18
IIIBR-SP140PH IIIB - Drainage (Temp) - Ramp T19-Dec-1622-Oct-18
IIIBR-SP150PH IIIB - Drainage - Ramp P21-May-1822-Oct-18
IIIBR-SP160PH IIIB - Drainage (Temp) - Ramp Q21-Jan-1821-Oct-18
IIIBR-SP170PH IIIB - Jack & Bore Pressure Testing (1-15)30-Apr-1821-Oct-18
IIIBR-SP180PH IIIB - Jack & Bore Pressure Testing (16-30)03-May-1821-Oct-18
IIIBR-SP190PH IIIB - Jack & Bore Pressure Testing (31-45)07-May-1821-Oct-18
IIIBR-TC120PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp G08-Nov-1721-Oct-18
IIIBR-TC130PH IIIB - Temp Striping New Ramp Alignment - Ramp G09-Nov-1721-Oct-18
IIIBR-TC160PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp J17-Sep-1721-Oct-18
IIIBR-TC170PH IIIB - Temp Striping New Ramp Alignment - Ramp J14-Jan-1822-Oct-18
IIIBR-TC180PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp V19-Apr-1722-Oct-18
IIIBR-TC190PH IIIB - Temp Striping New Ramp Alignment - Ramp V16-Mar-1722-Oct-18
IIIBR-TC200PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp K17-Sep-1722-Oct-18
IIIBR-TC210PH IIIB - Temp Striping New Ramp Alignment - Ramp K01-May-1722-Oct-18
IIIBR-TC230PH III C - Temp Striping New Ramp Alignment - Ramp T11-Sep-1805-Nov-18
IIIBR-TC250PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp P25-Apr-1822-Oct-18
IIIBR-TC260PH IIIB - Temp Striping New Ramp Alignment - Ramp P25-Apr-1822-Oct-18
IIIBR-TC270PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp Q18-Mar-1821-Oct-18
IIIBR-TC280PH IIIB - Temp Striping New Ramp Alignment - Ramp Q18-Mar-1821-Oct-18
IIIBR-TC290PH IIIB - Shift ramp traffic to completed Shingle bridge and Ramp P20-Aug-1822-Oct-18
IIIBR-TC300PH III C - Shift WB traffic to outside - through JYP bridge11-Sep-1807-Nov-18
IIIBR100PH IIIB - Construct Ramp G Diversion/Temp Pavement - Ramp G27-Nov-1721-Oct-18
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J28-Aug-1721-Oct-18
IIIBR120PH IIIB - Construct Ramp V Diversion - Ramp V23-Jan-1722-Oct-18
IIIBR130PH IIIB - Construct Ramp K Diversion/Temp Pavement - Ramp K03-Apr-1722-Oct-18
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q15-Feb-1821-Oct-18
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB29-May-1821-Oct-18
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive06-Dec-1722-Oct-18
IIIBWBO-AP110PH IIIB - Asphalt - Median Widening STA 2030+00 to STA 217+00 - (Redundant)12-Oct-1825-Oct-18
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening12-Oct-1822-Oct-18
IIIBWBO-EW100PH IIIB - Surcharge/ Embankment 1 - WB Outside Widening Area01-May-1722-Oct-18
IIIBWBO-EW101PH IIIB - Surcharge/ Embankment 2 - WB Outside Widening Area19-May-1722-Oct-18
IIIBWBO-EW102PH IIIB - Surcharge/ Embankment 3 - WB Outside Widening Area16-Jun-1722-Oct-18
IIIBWBO-EW103PH IIIB - Surcharge/ Embankment 4 - WB Outside Widening Area21-Jul-1722-Oct-18
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area13-Nov-1721-Oct-18
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening19-Sep-1622-Oct-18
IIIBWBO-GC100PH IIIB - MISC. Demo - WB Outside Widening Area29-Aug-1721-Oct-18
IIIBWBO-GC120PH IIIB - Guardrail (Roadway) - WB Outside Widening ea side of I-Drive Bridge08-Oct-1822-Oct-18
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area06-Nov-1721-Oct-18
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area25-Sep-1721-Oct-18
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area09-Nov-1721-Oct-18
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area27-Nov-1722-Oct-18
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area07-May-1821-Oct-18
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening24-Sep-1822-Oct-18
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area04-Oct-1822-Oct-18
IIIBWBO-SP120PH IIIB - Drainage (International - I4)- WB Outside Widening Area (SR528)30-Mar-1821-Oct-18
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)26-Jun-1721-Oct-18
IIIBWBO-SP140PH IIIB - Gutter Drainage - STA 332 - 329 (WB Outside)21-Jun-1822-Oct-18
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)27-Jul-1721-Oct-18
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)15-Aug-1722-Oct-18
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)22-May-1825-Oct-18
IIIBWBO-ST100PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over Universal BLVD)23-Aug-1721-Oct-18
IIIBWBO-ST11PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)01-Nov-1621-Oct-18
IIIBWBO-ST12PH IIIB - Curing for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)08-Dec-1621-Oct-18
IIIBWBO-ST120PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over Shingle Creek)29-May-1821-Oct-18
IIIBWBO-ST13PH IIIB - Removal for Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Uni15-Dec-1621-Oct-18
IIIBWBO-ST130PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over Shingle Creek)04-Jun-1821-Oct-18
IIIBWBO-ST14PH IIIB - Temp Sheet Pile Removal - WB Outside Widening Area (Bridge over universal BLVD)16-Dec-1621-Oct-18
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)04-Jun-1821-Oct-18
IIIBWBO-ST150PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over Shingle Creek)03-Jul-1821-Oct-18
IIIBWBO-ST171PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over International DR)21-Aug-1721-Oct-18
IIIBWBO-ST180PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over universal BLVD)27-Jun-1721-Oct-18
IIIBWBO-ST190PH IIIB - Demo Traffic Rails - WB Outside Widening Area (Bridge over Shingle Creek)23-Oct-1721-Oct-18
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)18-Mar-1821-Oct-18
IIIBWBO-ST211PH IIIB - Backwall Bent 1 - WB Outside Widening Area (Bridge over International Dr)17-May-1821-Oct-18
IIIBWBO-ST220PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)05-Jul-1721-Oct-18
IIIBWBO-ST240PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-1721-Oct-18
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)30-Apr-1821-Oct-18
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)29-Nov-1721-Oct-18
IIIBWBO-ST260PH IIIB - Wall Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)30-Jun-1721-Oct-18
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)05-Dec-1721-Oct-18
IIIBWBO-ST28PH IIIB - Rip Rap Under Bridge - WB Outside Widening Area (Bridge over Shingle Creek)03-Jan-1821-Oct-18
IIIBWBO-ST280PH IIIB - Backwall Bent 3 - WB Outside Widening Area (Bridge over International DR)01-May-1821-Oct-18
IIIBWBO-ST300PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)27-Jun-1721-Oct-18
IIIBWBO-ST310PH IIIB - End Bent 3 - WB Outside Widening Area (Bridge over International DR)24-Apr-1821-Oct-18
IIIBWBO-ST320PH IIIB - Curing for Pier 2, 3, (Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)22-Feb-1821-Oct-18
IIIBWBO-ST330PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over universal BLVD)08-Jul-1721-Oct-18
IIIBWBO-ST340PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Universal BLVD)18-Jul-1721-Oct-18
IIIBWBO-ST350PH IIIB - Superstructure Deck SIB & Start Rebar - WB Outside Widening (Area Bridge over Universal BLVD)24-Jul-1721-Oct-18
IIIBWBO-ST360PH IIIB - Remove Concrete Forms for Pier 2, 3,(Pile Cap) - WB Outside Widening Area (Bridge over Shingl02-Mar-1821-Oct-18
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)28-Feb-1821-Oct-18
IIIBWBO-ST380PH IIIB - Set Beams - WB Outside Widening Area (Bridge over International Drive)23-May-1821-Oct-18
IIIBWBO-ST390PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over International Drive)02-Jul-1821-Oct-18
IIIBWBO-ST400PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)26-Feb-1821-Oct-18
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)01-May-1821-Oct-18
IIIBWBO-ST430PH IIIB - Wall Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)06-Feb-1821-Oct-18
IIIBWBO-ST440PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over universal BLVD)03-Oct-1721-Oct-18
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)27-Nov-1721-Oct-18
IIIBWBO-ST460PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over universal BLVD)12-Oct-1721-Oct-18
IIIBWBO-ST470PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over universal BLVD)20-Oct-1721-Oct-18
IIIBWBO-ST480PH IIIB - End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)31-Jan-1821-Oct-18
IIIBWBO-ST490PH IIIB - Approach Slabs - WB Outside Widening Area (Bridge over International DR)20-Aug-1821-Oct-18
IIIBWBO-ST510PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over universal BLVD)02-Nov-1721-Oct-18
IIIBWBO-ST520PH IIIB - Curing for End Bent 4 - WB Outside Widening Area (Bridge over Shingle Creek)09-Feb-1821-Oct-18
IIIBWBO-ST530PH IIIB - Lighting Conduit - WB Outside Widening Area (Bridge over International DR)13-Sep-1821-Oct-18
IIIBWBO-ST540PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over International DR)17-Sep-1821-Oct-18
IIIBWBO-ST550PH IIIB - Grind and Groove - WB Outside Widening Area (Bridge over International DR)26-Sep-1821-Oct-18
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)02-Mar-1821-Oct-18
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)23-Mar-1821-Oct-18
IIIBWBO-ST631PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over International DR)23-Aug-1721-Oct-18
IIIBWBO-ST640PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over universal BLVD)05-Jul-1721-Oct-18
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)27-Oct-1721-Oct-18
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)27-Oct-1721-Oct-18
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)27-Oct-1721-Oct-18
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)01-Nov-1721-Oct-18
IIIBWBO-ST690PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over International Drive)08-Jul-1821-Oct-18
IIIBWBO-ST700PH IIIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - WB Outside Widening Area (Bridge over Shingle Creek)03-May-1821-Oct-18
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)15-Jan-1821-Oct-18
IIIBWBO-ST8PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over universal BLVD)28-Oct-1621-Oct-18
IIIBWBO-TC110PH IIIB - Set Temp Traffic Barriers - WB Outside Widening Area16-Aug-1721-Oct-18
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area16-Aug-1721-Oct-18
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive27-Mar-1822-Oct-18
IIIBWBO-W101PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over Universal BLVD)13-Nov-1721-Oct-18
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside03-Jul-1821-Oct-18
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)05-Jun-1822-Oct-18
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive04-Apr-1822-Oct-18
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman05-Jun-1822-Oct-18
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive26-Jul-1822-Oct-18
IIIC-CP10PH IIIC - Construct Ped. Signalization at Ramps G&F12-Nov-1723-Oct-18
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F07-Jun-1821-Oct-18
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N24-May-1821-Oct-18
IIICR-EW110PH IIIC - Embankment - Ramp N12-Feb-1821-Oct-18
IIICR-GC110PH IIIC - Demo - Ramp N06-Feb-1821-Oct-18
IIICR-GC160PH IIIC - Guardrail (Roadway) - Ramp N02-Jun-1821-Oct-18
IIICR-RW100PH IIIC - Stabilization - Ramp F22-May-1821-Oct-18
IIICR-RW110PH IIIC - Base - Ramp F29-May-1821-Oct-18
IIICR-RW120PH IIIC - Stabilization - Ramp N14-Mar-1821-Oct-18
IIICR-RW130PH IIIC - Base - Ramp N09-Apr-1821-Oct-18
IIICR-SP100PH IIIC - Drainage - Ramp F22-Mar-1821-Oct-18
IIICR-SP110PH IIIC - Drainage - Ramp N28-Jul-1721-Oct-18
IIICR-TC120PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp F27-Apr-1821-Oct-18
IIICR-TC140PH IIIC - Set Temp Traffic Barriers (Shoulder) - Ramp N19-Mar-1821-Oct-18
IIICR-TC150PH IIIC - Temp Striping New Ramp Alignment - Ramp N19-Mar-1821-Oct-18
IIICR100PH IIIC - Construct Ramp F Diversion - Ramp F02-Apr-1821-Oct-18
IIICR110PH IIIC - Construct Ramp N Diversion - Ramp N29-Aug-1721-Oct-18
IIICR130PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp G03-May-1823-Oct-18
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J18-Mar-1822-Oct-18
IIICR150PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp N02-Jul-1821-Oct-18
IIICR160PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp K01-Mar-1822-Oct-18
IIICR170PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp P21-Aug-1822-Oct-18
IIICR190PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp Q12-Jun-1824-Oct-18
IIICR200PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp V05-Dec-1722-Oct-18
IIICWBO-ST100PH IIIA - Demo Bridge - WB Outside Widening Area (Bridge over John Young PKWY)16-Oct-1721-Oct-18
IIICWBO-ST220PH IIIA - Demo Bridge Deck - WB Outside Widening Area (Bridge over John Young PKWY)25-Oct-1721-Oct-18
ITS10-1000Issue Identification15-May-1821-Oct-18
ITS10-1010NOI submitted - Potential Delay to Project Schedule31-Jul-1821-Oct-18
ITS10-1020Plan Revision 10 Officially transmitted22-Aug-1821-Oct-18
ITS10-1030Plan Revision 10 - Review and Procurement23-Aug-1821-Oct-18
ITS10-1040Fabrication and Delivery - Conduits05-Oct-1821-Oct-18
ITS10-1050Prepare & Submit - 639 ITS Standby Generator Product Data & Shop Drawings20-Aug-1821-Oct-18
ITS10-1060Review and Approve - 639 ITS Standby Generator Product Data & Shop Drawings29-Aug-1821-Oct-18
ITS10-1070Fabrication & Delivery - ITS Standby Generators05-Oct-1821-Oct-18
ITS10-1110Fabrication and Delivery - Conductors05-Oct-1821-Oct-18
ITS10-1140Fabrication & Delivery - Step Up / Step Down Transformers05-Oct-1821-Oct-18
IVEBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 EB Express08-Oct-1830-Oct-18
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)09-Apr-1830-Oct-18
IVEBM-TC100PH IV - Shift EB traffic to outside I-Drive through Station 31222-May-1823-Oct-18
IVEBM-W170PH IV - Median Wall - Excavate - Station 259+50 to 31120-Aug-1830-Oct-18
IVEBM-W180PH IV - Median Wall - FFP Stem - Station 259+50 to 31120-Aug-1830-Oct-18
IVEBM-W190PH IV - Median Wall - Rebar/ slip Top - Station 259+50 to 31127-Aug-1830-Oct-18
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 33201-Oct-1830-Oct-18
IVEBM-W240PH IV - Median Wall - FFP Stem Station 311 to 33204-Oct-1830-Oct-18
IVEBM-W250PH IV - Median Wall - Rebar/ slip Top Station 311 to 33217-Oct-1830-Oct-18
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 35204-Oct-1814-Nov-18
IVEBM-W270PH IV - Median Wall - FFP FOOTER+Stem Station 335 to 35212-Oct-1814-Nov-18
IVEBM-W280PH IV - Median Wall - Rebar/ slip Top Station 335 to 35219-Oct-1814-Nov-18
IVEBO-SS100PH IV - Install OT Structures - East of JYP05-Mar-1821-Oct-18
IVR-EC30PH IV - Erect Cantilevers (10-15)13-May-1821-Oct-18
IVR-ET50PH IV - Erect Trusses (9-17)17-Apr-1822-Oct-18
IVR-ET60PH IV - Erect Trusses (18-24)06-May-1821-Oct-18
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)15-Oct-1821-Oct-18
IVWBM-AP110PH IV - Asphalt - Structural - Station 259+50 to 311 WB Express08-Oct-1830-Oct-18
IVWBM-GC100PH IV - Demo Temporary - WB Express05-Apr-1825-Oct-18
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express21-May-1821-Oct-18
IVWBM-RW170PH IV - Base - Station 259+50 to 311 WB Express24-Sep-1830-Oct-18
IVWBM-RW230PH IV - Grade for road - Station 259+50 to 311 EB Express29-Aug-1830-Oct-18
IVWBM-RW240PH IV - Stabilization - Station 259+50 to 311 EB Express05-Sep-1830-Oct-18
IVWBM-RW250PH IV - Base - Station 259+50 to 311 EB Express24-Sep-1830-Oct-18
IVWBM-TC100PH IV - Set Temp Traffic Barriers - WB Median Widening04-Apr-1823-Oct-18
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area05-Mar-1821-Oct-18
PRE-FA-001Fabricate and Deliver 506 Bridge Drainage System25-Jan-1721-Oct-18
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles07-Apr-1721-Oct-18
PRE-FA-018Fabricate and Deliver 650 Traffic Signals17-Jul-1721-Oct-18
PRE-FA-019Fabricate and Deliver 700 Highway Signing (Single, Multi, Panel, and Overhead)09-Mar-1721-Oct-18
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting17-Jul-1721-Oct-18
PRE-FA-021Fabricate and Deliver 05500 Metal Fabrications20-Mar-1721-Oct-18
PRE-FA-022Fabricate and Deliver 133420 Pre-Engineered Precast Concrete Structure27-Feb-1721-Oct-18
PRE-FA-023Fabricate and Deliver 263213 Engine Generator22-May-1721-Oct-18
PRE-FA-026Fabricate and Deliver 653 Pedestrian Signals07-Apr-1721-Oct-18
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems29-Sep-1721-Oct-18
PRE-FA-028Fabricate and Deliver 665 Pedestrian Detector07-Apr-1721-Oct-18
PRE-FA-029Fabricate and Deliver 033000 Cast-In-Place Concrete15-May-1721-Oct-18
PRE-FA-030Fabricate and Deliver 042200 Masonry20-Jun-1721-Oct-18
PRE-FA-031Fabricate and Deliver 081100 Metal Doors and Frames16-Jan-1721-Oct-18
PRE-FA-032Fabricate and Deliver 099100 Painting Product Data and Sample16-Jan-1721-Oct-18
PRE-FA-033Fabricate and Deliver 101400 Signage30-May-1721-Oct-18
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping05-May-1721-Oct-18
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping05-May-1721-Oct-18
PRE-FA-036Fabricate and Deliver 232000 Piping and Specialties25-Jan-1721-Oct-18
PRE-FA-037Fabricate and Deliver 233113 Ductwork Product Data and Shop Drawing22-May-1721-Oct-18
PRE-FA-038Fabricate and Deliver 238119 Packaged Air Conditioners17-Jan-1721-Oct-18
PRE-FA-039Fabricate and Deliver 260536 Cable Trays09-Feb-1721-Oct-18
PRE-FA-040Fabricate and Deliver 264113 Lighting Protection System Product Data and Shop Drawing19-Apr-1721-Oct-18
PRE-FA-042Fabricate and Deliver 781 DMS18-May-1721-Oct-18
PRE-FA-045Fabricate and Deliver 786 ITS Vehicle Detection System09-Jun-1721-Oct-18
PRE-PS-017Prepare and Submit 646 Aluminum Pedestal Poles20-Mar-1721-Oct-18
PRE-PS-023Prepare and Submit 263213 Engine Generator18-Nov-1621-Oct-18
PRE-PS-026Prepare and Submit 653 Pedestrian Signals20-Mar-1721-Oct-18
PRE-PS-028Prepare and Submit 665 Pedestrian Detector20-Mar-1721-Oct-18
PRE-PS-029Prepare and Submit 033000 Cast-In-Place Concrete26-Sep-1621-Oct-18
PRE-PS-030Prepare and Submit 042200 Masonry20-Feb-1721-Oct-18
PRE-PS-031Prepare and Submit 081100 Metal Doors and Frames19-Oct-1621-Oct-18
PRE-PS-032Prepare and Submit 099100 Painting Product Data and Sample19-Oct-1621-Oct-18
PRE-PS-033Prepare and Submit 101400 Signage27-Feb-1721-Oct-18
PRE-PS-034Prepare and Submit 231113 Fuel Oil Piping13-Feb-1721-Oct-18
PRE-PS-035Prepare and Submit 231323 Aboveground Diesel Storage Tank and Piping13-Feb-1721-Oct-18
PRE-PS-036Prepare and Submit 232000 Piping and Specialties16-Jan-1721-Oct-18
PRE-PS-037Prepare and Submit 233113 Ductwork Product Data and Shop Drawing20-Feb-1721-Oct-18
PRE-PS-038Prepare and Submit 238119 Packaged Air Conditioners09-Jan-1721-Oct-18
PRE-PS-039Prepare and Submit 260536 Cable Trays16-Jan-1721-Oct-18
PRE-PS-040Prepare and Submit 264113 Lighting Protection System Product Data and Shop Drawing20-Mar-1721-Oct-18
PRE-RA-001Review and Approve 506 Bridge Drainage System19-Jan-1721-Oct-18
PRE-RA-017Review and Approve 646 Aluminum Pedestal Poles23-Mar-1721-Oct-18
PRE-RA-018Review and Approve 650 Traffic Signals23-Mar-1721-Oct-18
PRE-RA-022Review and Approve 133420 Pre-Engineered Precast Concrete Structure12-Jan-1721-Oct-18
PRE-RA-023Review and Approve 263213 Engine Generator01-Feb-1721-Oct-18
PRE-RA-026Review and Approve 653 Pedestrian Signals23-Mar-1721-Oct-18
PRE-RA-028Review and Approve 665 Pedestrian Detector23-Mar-1721-Oct-18
PRE-RA-029Review and Approve 033000 Cast-In-Place Concrete26-Oct-1621-Oct-18
PRE-RA-030Review and Approve 042200 Masonry20-Jun-1721-Oct-18
PRE-RA-031Review and Approve 081100 Metal Doors and Frames26-Oct-1621-Oct-18
PRE-RA-032Review and Approve 099100 Painting Product Data and Sample26-Oct-1621-Oct-18
PRE-RA-033Review and Approve 101400 Signage29-Mar-1721-Oct-18
PRE-RA-034Review and Approve 231113 Fuel Oil Piping21-Apr-1721-Oct-18
PRE-RA-035Review and Approve 231323 Aboveground Diesel Storage Tank and Piping28-Mar-1721-Oct-18
PRE-RA-036Review and Approve 232000 Piping and Specialties18-Jan-1721-Oct-18
PRE-RA-037Review and Approve 233113 Ductwork Product Data and Shop Drawing22-May-1721-Oct-18
PRE-RA-038Review and Approve 238119 Packaged Air Conditioners12-Jan-1721-Oct-18
PRE-RA-039Review and Approve 260536 Cable Trays18-Jan-1721-Oct-18
PRE-RA-040Review and Approve 264113 Lighting Protection System Product Data and Shop Drawing28-Mar-1721-Oct-18
TF-CO-001Foundation (FRP SOG)19-Jun-1721-Oct-18
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)23-May-1721-Oct-18
TF-CO-004Precast Erection27-Jun-1721-Oct-18
TF-CO-005Install Upright 2 D.S.22-Mar-1721-Oct-18
TF-CO-006FRP Conc. Roof Dec/c27-Jun-1721-Oct-18
TF-CO-007Install Upright 3 D.S.24-Mar-1721-Oct-18
TF-CO-008Constr. Pedestal26-Jun-1721-Oct-18
TF-CO-009Const. Roof System27-Jun-1721-Oct-18
TF-CO-010FRP Conc. Pad (Generator)14-Aug-1721-Oct-18
TF-CO-011AS Build D.S.30-Mar-1721-Oct-18
TF-CO-012Install Frames & Doors27-Jun-1721-Oct-18
TF-CO-013Const. Screen Wall (Con.)20-Jun-1721-Oct-18
TF-CO-014Pull Wire & Install Light Fixtures12-Nov-1721-Oct-18
TF-CO-015Install HVAC27-Jun-1721-Oct-18
TF-CO-016F+1 Generator13-Nov-1721-Oct-18
TF-CO-017F+1 Fuel Tank13-Nov-1721-Oct-18
TF-CO-018Install Lighting12-Nov-1721-Oct-18
TF-CO-019Install Security System12-Nov-1721-Oct-18
TF-CO-020Install Lightning Protection12-Nov-1721-Oct-18
TF-CO-022Construct Sidewalk14-Aug-1721-Oct-18
TF-CO-023Erect Truss04-Dec-1721-Oct-18
TF-CO-024Wall Treatments (Ply)12-Nov-1721-Oct-18
TF-CO-025Install Equip. Arm Supports04-Dec-1721-Oct-18
TF-CO-026Cont. Lightning22-Jan-1826-Oct-18
TF-CO-027Cont. HVAC22-Jan-1826-Oct-18
TF-CO-029Install Conduit/Raceways04-Dec-1721-Oct-18
TF-CO-030Pull Wire17-Sep-1829-Oct-18
TF-CO-031Toll Facility Finishes and Punchlist19-Oct-1821-Oct-18
TF-FA-001Fabricate and Deliver Precast Erection30-Jan-1721-Oct-18
TF-RA-001Review and Approve Precast Erection12-Jan-1721-Oct-18
  • Activities with Identical Descriptions

Potential Project Delays

We noticed that 418 activities took longer than it was originally anticipated. The following table compares original and actual durations for some of the completed activities. This table should be used as a tool to review the durations for similar activities not yet started.

Activity IDActivity DescriptionOriginal DurationActual Duration
IIAR110PH IIA - Construct Ramp O Diversion - Ramp O (Tie in to EB)518
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E1856
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-12063
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-120138
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-22025
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H2057
IIBR151PH IIB - Construct Ramp L Diversion - Ramp L20117
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-220212
IICR120PH IIC - Construct Ramp M Diversion - Ramp M2093
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)15194
IIIAR110PH IIIA - Construct Ramp T Diversion - Ramps T628
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J2032
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q2021
IIICR110PH IIIC - Construct Ramp N Diversion - Ramp N20109
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J1214
IVR-ET50PH IV - Erect Trusses (9-17)1824
IVR-ET60PH IV - Erect Trusses (18-24)14101
GC-GCN220Written Suspend order - FOC related to pending change5091
IBR-RW110PH IB - Base - Ramp B/C Gore45
IIBR-EC10PH IIB - Erect Cantilevers (1-3)318
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)2031
TF-CO-014Pull Wire & Install Light Fixtures1545
TF-CO-018Install Lighting2245
TF-CO-019Install Security System2245
TF-CO-020Install Lightning Protection1045
TF-CO-023Erect Truss57
TF-CO-024Wall Treatments (Ply)2245
TF-CO-027Cont. HVAC2580
TF-FA-001Fabricate and Deliver Precast Erection20148
IBEBM-W100PH IB - Median Wall - Grading (JYP to TPK)20238
IBEBM-W110PH IB - Median Wall - FFP Footing/Stem (JYP to TPK)15233
IBR-IHM300PH IB - Install High Mast/Service (1-3)10490
IBWBM-W100PH IB - Median Wall - Construct/ slip Top (JYP to TPK)15208
IIAR-AP100PH IIB - Asphalt - Structural - Ramp O413
IIAR-EW100PH IIB - Embankment - Ramp O20347
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O110
IIAR-RW100PH IIB - Stabilization - Ramp O46
IIAR-RW110PH IIB - Base - Ramp O830
IIAR-SP110PH IIB - Drainage - Ramp O20194
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)337
IIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)11375
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E263
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C4114
IIBR-AP130PH IIB - Asphalt - Structural - Ramp I-123
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H273
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-2262
IIBR-AP180PH IIB - Asphalt - Structural - Ramp U2109
IIBR-EW110PH IIB - Embankment - Ramp E5300
IIBR-EW120PH IIB - Embankment - Ramp S-15205
IIBR-EW130PH IIB - Embankment - Ramp R-15108
IIBR-EW140PH IIB - Embankment - Ramp C447
IIBR-EW160PH IIB - Embankment - Ramp H586
IIBR-EW170PH IIB - Embankment - Ramp R-2519
IIBR-EW200PH IIB - Embankment - Ramp U5321
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R12
IIBR-IDS20PH IIB - Install Drilled Shafts (14-35)22156
IIBR-IDS30PH IIB - Install Drilled Shafts (36-57)22124
IIBR-ITS30PH IIB - Install Conduit/Boxes (Univ to JYP)20353
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)20365
IIBR-ITS50PH IIB - Install ITS Poles (1-20)2077
IIBR-ITS60PH IIB - Install ITS Poles (21-41)2069
IIBR-ITS70PH IIB - Install CCTV's (1-8)1691
IIBR-ITS80PH IIB - Install CCTV's (9-16)1491
IIBR-ITS90PH IIB - Install CCTV's (17-22)1029
IIBR-RW120PH IIB - Stabilization - Ramp E254
IIBR-RW130PH IIB - Base - Ramp E841
IIBR-RW140PH IIB - Stabilization - Ramp C1228
IIBR-RW150PH IIB - Stabilization - Ramp I-124
IIBR-RW160PH IIB - Base - Ramp C2242
IIBR-RW180PH IIB - Stabilization - Ramp H253
IIBR-RW190PH IIB - Base - Ramp H827
IIBR-RW200PH IIB - Stabilization - Ramp R-223
IIBR-RW220PH IIB - Base - Ramp R-2837
IIBR-RW240PH IIB - Stabilization - Ramp L27
IIBR-RW260PH IIB - Stabilization - Ramp U24
IIBR-RW270PH IIB - Base - Ramp U830
IIBR-SM380PH IIB - Shoulder Mount Light Pole/Service (I-4 to International) (14 EA)1489
IIBR-SM390PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)20354
IIBR-SM400PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)20242
IIBR-SM410PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (C)20221
IIBR-SM420PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (14 EA)14100
IIBR-SM430PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (7 EA)7100
IIBR-SM440PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (A)18236
IIBR-SM450PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (19 EA)19249
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)18243
IIBR-SM470PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)20305
IIBR-SM480PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)20293
IIBR-SM490PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)20123
IIBR-SP110PH IIB - Drainage - Ramp E1012
IIBR-SP130PH IIB - Drainage - Ramp I-11065
IIBR-SP150PH IIB - Drainage - Ramp C1041
IIBR-SP240PH IIB - Drainage - Ramp R-1725
IICR-AP100PH IIC - Asphalt - Structural - Ramp S-224
IICR-EW100PH IIC - Embankment - Ramp S-25344
IICR-EW120PH IIC - Embankment - Ramp M5147
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-21043
IICR-RW100PH IIC - Stabilization - Ramp S-2214
IICR-RW140PH IIC - Base - Ramp M826
IICR-RW150PH IIC - Stabilization - Ramp M222
IICR-RW330PH IIC - Complete Widening - Ramp E828
IICR-RW340PH IIC - Complete Widening - Ramp H854
IICR-RW360PH IIC - Complete Widening - Ramp L843
IICR-SP100PH IIC - Drainage - Ramp S-25148
IICR-SP120PH IIC - Drainage - Ramp M10212
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In1525
IIIBR-EC20PH IIIB - Erect Cantilevers (4-9)679
IIIBR-ET40PH IIIB - Erect Trusses (1-8)16154
ITS10-1030Plan Revision 10 - Review and Procurement1430
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 33223
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 35247
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)20235
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)20233
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)20219
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)20443
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems42634
PRE-FA-016Fabricate and Deliver 641 Prestressed Concrete Poles35325
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles5659
PRE-FA-018Fabricate and Deliver 650 Traffic Signals56143
PRE-FA-019Fabricate and Deliver 700 Highway Signing (Single, Multi, Panel, and Overhead)126442
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting56453
PRE-FA-021Fabricate and Deliver 05500 Metal Fabrications140154
PRE-FA-022Fabricate and Deliver 133420 Pre-Engineered Precast Concrete Structure84120
PRE-FA-023Fabricate and Deliver 263213 Engine Generator84213
PRE-FA-024Fabricate and Deliver 633 Communication Cable42575
PRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes42511
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems3095
PRE-FA-031Fabricate and Deliver 081100 Metal Doors and Frames56217
PRE-FA-032Fabricate and Deliver 099100 Painting Product Data and Sample42162
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping70206
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping84216
PRE-FA-038Fabricate and Deliver 238119 Packaged Air Conditioners42216
PRE-FA-039Fabricate and Deliver 260536 Cable Trays42111
PRE-FA-041Fabricate and Deliver 682 CCTV Camera42511
PRE-FA-042Fabricate and Deliver 781 DMS56105
PRE-FA-044Fabricate and (Ready to) Deliver 783 ITS Fiber Optic Cable56624
PRE-FA-045Fabricate and Deliver 786 ITS Vehicle Detection System5680
PRE-FA-046Fabricate and Deliver 784 ITS Managed Ethernet Hub Switch42789
PRE-FA-049Fabricate and Deliver 262913 ITS Standby Generator Product Data and Shop Drawing70498
PRE-PS-001Prepare and Submit 506 Bridge Drainage System28164
PRE-PS-006Prepare and Submit Precast Erection28223
PRE-PS-016Prepare and Submit 641 Prestressed Concrete Poles28407
PRE-PS-018Prepare and Submit 650 Traffic Signals28402
PRE-PS-019Prepare and Submit 700 Highway Signing (Single, Multi, Panel, and Overhead)28421
PRE-PS-022Prepare and Submit 133420 Pre-Engineered Precast Concrete Structure28223
PRE-PS-023Prepare and Submit 263213 Engine Generator2875
PRE-PS-024Prepare and Submit 633 Communication Cable28455
PRE-PS-027Prepare and Submit 663 Signal Priority and Preemption Systems28594
PRE-PS-029Prepare and Submit 033000 Cast-In-Place Concrete2830
PRE-PS-030Prepare and Submit 042200 Masonry28120
PRE-PS-033Prepare and Submit 101400 Signage2830
PRE-PS-034Prepare and Submit 231113 Fuel Oil Piping2867
PRE-PS-035Prepare and Submit 231323 Aboveground Diesel Storage Tank and Piping2843
PRE-PS-037Prepare and Submit 233113 Ductwork Product Data and Shop Drawing2891
PRE-PS-041Prepare and Submit 682 CCTV Camera28205
PRE-PS-045Prepare and Submit 660 ITS Vehicle Detection System28240
PRE-PS-049Prepare and Submit 639 ITS Standby Generator Product Data and Shop Drawing28372
PRE-RA-016Review and Approve 641 Prestressed Concrete Poles45434
PRE-RA-019Review and Approve 700 Highway Signing (Single, Multi, Panel, and Overhead)45469
PRE-RA-023Review and Approve 263213 Engine Generator45110
PRE-RA-024Review and Approve 633 Communication Cable45478
PRE-RA-025Review and Approve 635 Pull, Splice, & Junction Boxes45346
PRE-RA-027Review and Approve 663 Signal Priority and Preemption Systems45591
PRE-RA-029Review and Approve 033000 Cast-In-Place Concrete45224
PRE-RA-041Review and Approve 682 CCTV Camera45210
PRE-RA-042Review and Approve 781 DMS45266
PRE-RA-044Review and Approve 633 ITS Fiber Optic Cable45226
PRE-RA-045Review and Approve 660 ITS Vehicle Detection System45309
PRE-RA-049Review and Approve 639 ITS Standby Generator Product Data and Shop Drawing45363
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)36
IBEBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10222
IBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10247
IBEBM-RW280PH IB - Base (I4-International Drive) - EB Median Widening8150
IBEBM-RW310PH IB - Guard Rail Removal - EB Median Widening3299
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10193
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10188
IBEBM-ST450PH IB - Set Beams - EB Median Widening (Bridge over International Drive)13
IBEBM-ST460PH IB - Superstructure Deck - EB Median Widening (Bridge over International Drive)1526
IBEBM-ST660PH IB - Set Beams - EB Median Widening (Bridge over John Young PKWY)34
IBEBM-ST670PH IB - Superstructure Deck - EB Median Widening (Bridge over John Young PKWY)2234
IBEBM-ST750PH IB - Set Beams - EB Median Widening (Bridge over Universal BLVD)27
IBEBM-ST760PH IB - Superstructure Deck - EB Median Widening Bridge over Universal BLVD)1549
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening1532
IBEBO-EW130PH IB - Pond Excav/Embank JYP to Universal - WB Outside Widening20567
IBEBO-EW140PH IB - Pond Excav/Embank Universal to Int. Dr. - WB Outside Widening20566
IBEBO-EW150PH IB - Pond Excav/Embank Universal to Int. Dr. - EB Outside Widening20546
IBEBO-EW160PH IB - Pond Excav/Embank Universal to JYP - EB Outside Widening20538
IBEBO-EW170PH IB - Pond Excav/Embank Int. Dr. to I-4 - WB Outside Widening20171
IBEBO-SP150PH IB - Drainage (Pond 5C @ John Young) - EB Outside Widening (Ponds)15343
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening776
IBWBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10255
IBWBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10283
IBWBM-RW180PH IB - Base (Universal-International Drv.) - WB Median Widening842
IBWBM-RW210PH IB - Base (International Drv.-I4) - WB Median Widening841
IBWBM-RW220PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10237
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10226
IBWBM-SP100PH IB - Drainage for JYP Interchange (Sta 354 +04)20149
IBWBM-SP110PH IB - Drainage for JYP to STA 39020181
IBWBM-SP120PH IB - Drainage for JYP to Int. Dr. (Sta 354+04 to 234+50)20136
IBWBM-ST350PH IB - Set Beams - WB Median Widening (Bridge over International Drive)23
IBWBM-ST360PH IB - Superstructure Deck - WB Median Widening (Bridge over International Drive)1550
IBWBM-ST560PH IB - Set Beams - WB Median Widening (Bridge over John Young PKWY)34
IBWBM-ST580PH IB - Superstructure Deck - WB Median Widening (Bridge over John Young PKWY)2242
IBWBM-ST590PH IB - Set Beams - WB Median Widening (Bridge over Universal BLVD)27
IBWBM-ST600PH IB - Superstructure Deck - WB Median Widening Bridge over Universal BLVD)1533
IBWBM-ST660PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over universal BLVD)310
IBWBO-SP100PH IB - Jack & Bore JYP Interchange (Sta 354 +04)20149
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)20256
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)2054
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive17
IIBEBO-IE20PH IIB - Install 2 Ea Mast Arms at Jyp1077
IIBEBO-ST10PH IIB - Test Pile - EB Outside Widening (Bridge over universal BLVD)3162
IIBEBO-ST12PH IIB - Production Pile - EB Outside Widening (Bridge over universal BLVD)7157
IIBEBO-ST14PH IIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)1023
IIBEBO-ST23PH IIB - Production Pile (H Piles) (32-62) -EB Outside Widening (Bridge 750629 Ramp S over JYP)8187
IIBEBO-ST26PH IIB - Remove of Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S ov343
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)2241
IIBEBO-ST31PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)10193
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)20106
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive15126
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive15118
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive1582
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)10136
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)2283
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening2237
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside1014
IIBR-EHM340PH IIB - Existing High Mast Removal (1-8)1846
IIBR-EHM350PH IIB - Existing High Mast Removal (9-18)1822
IIBR-EHM360PH IIB - Existing High Mast Removal (19-27)18237
IIBR-IHM310PH IIB - Install High Mast/Service (4-6)10391
IIBR-RES120PH IIB - Remove Existing Sign Structures (2-4)618
IICR-TC1000PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp M12
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T344
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle214
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q23
IIIBR-EW100PH IIIB - Embankment - Ramp G512
IIIBR-EW110PH IIIB - Embankment - Ramp J511
IIIBR-EW130PH IIIB - Embankment - Ramp K551
IIIBR-EW140PH IIIB - Embankment - Ramp T5547
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle521
IIIBR-EW160PH IIIB - Embankment - Ramp Q548
IIIBR-GC100PH IIIB - Demo - Ramp G27
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P127
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle212
IIIBR-GC340PH IIIB - Demo - Ramp Q23
IIIBR-IDS40PH IIIB - Install Drilled Shafts (58-63)6131
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 162542
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)20470
IIIBR-RW100PH IIIB - Stabilization - Ramp G247
IIIBR-RW120PH IIIB - Stabilization - Ramp J24
IIIBR-RW150PH IIIB - Base - Ramp V89
IIIBR-RW160PH IIIB - Stabilization - Ramp K28
IIIBR-RW170PH IIIB - Base - Ramp K842
IIIBR-RW180PH IIIB - Stabilization - Ramp T2173
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle517
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle1019
IIIBR-RW220PH IIIB - Stabilization - Ramp Q235
IIIBR-RW230PH IIIB - Base - Ramp Q840
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T892
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T592
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)20241
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)10135
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)20333
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)1230
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)20357
IIIBR-SM610PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)20357
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)20357
IIIBR-SM630PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (D)2091
IIIBR-SP110PH IIIB - Drainage - Ramp J1031
IIIBR-TC250PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp P12
IIIBR-TC260PH IIIB - Temp Striping New Ramp Alignment - Ramp P12
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)35
IIIBWBO-ST4PH IIIB - Production Pile - WB Outside Widening Area (Bridge over International DR)11491
IIIBWBO-ST5PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over International DR)2058
IIIBWBO-ST7PH IIIB - Test Pile - WB Outside Widening Area (Bridge over universal BLVD)3204
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F24
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N26
IIICR-EW100PH IIIC - Embankment - Ramp F5538
IIICR-EW110PH IIIC - Embankment - Ramp N525
IIICR-GC160PH IIIC - Guardrail (Roadway) - Ramp N220
IIICR-RW100PH IIIC - Stabilization - Ramp F24
IIICR-RW110PH IIIC - Base - Ramp F89
IIICR-RW120PH IIIC - Stabilization - Ramp N217
IIICR-RW130PH IIIC - Base - Ramp N820
IIICR-SP100PH IIIC - Drainage - Ramp F1038
IIICR-SP110PH IIIC - Drainage - Ramp N10163
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)20137
IVEBM-TC100PH IV - Shift EB traffic to outside I-Drive through Station 312430
IVEBO-SS100PH IV - Install OT Structures - East of JYP20146
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express469
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express366
IVWBM-SP100PH IV - Drainage - Median Widening (East of 311)20134
IIAEBO-TC100PH IIA - Install Sign & Traffic Control Devices - EB Outside Widening1260
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)475
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)8193
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3204189
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332411
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening20168
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening1597
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening20109
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility5134
IIBEBO-GC100PH IIB - MISC. Demo - EB Outside Widening1060
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening25
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening2254
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening22223
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)14178
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening2276
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR15162
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)8108
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA7160
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA618
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)840
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)841
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)2076
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)20119
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)20189
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)10226
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)3154
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)2040
IIBEBO-ST180PH IIB - Wall Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)512
IIBEBO-ST220PH IIB - End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)813
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)48
IIBEBO-ST290PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge 750629 Ramp S over JYP)1516
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)59
IIBEBO-ST340PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over International DR)439
IIBEBO-ST350PH IIB - Superstructure Deck Finish Rebar\Set screed\Pouring - EB Outside Widening (Bridge 750629 Ramp S over JYP)1518
IIBEBO-ST370PH IIB - Lighting Conduit - EB Outside Widening (Bridge over International DR)19
IIBEBO-ST400PH IIB - End Bent 1 - EB Outside Widening (Bridge over universal BLVD)57
IIBEBO-ST440PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge 750629 Ramp S over JYP)1036
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)45
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)58
IIBEBO-ST570PH IIB - Superstructure Deck Pour - EB Outside Widening (Bridge over Universal BLVD)12
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)1014
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)47
IIBEBO-ST630PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over International DR)513
IIBEBO-ST640PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over universal BLVD)513
IIBEBO-ST690PH IIB - Pier 2, 3, 4 (F/R/P)(Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)2091
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)1526
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside Widening1027
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 36922186
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)16303
IIDEBO-ST160PH IID - Remove Concrete form for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over JYP)35
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)57
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)58
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)1525
IIDEBO-ST260PH IID - Concrete Slope Pavement - EB Outside Widening (Bridge over John Young PKWY)59
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)1038
IIDEBO-ST310PH IID - Pier 2, 3, 4 (F/R/P) ( Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)2052
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)1037
IIIAWBO-ST19PH IIIA - Production Pile (H Piles) (33-65) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)16246
IIIAWBO-ST22PH IIIA - Remove Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T38
IIIAWBO-ST31PH IIIA - Production Pile (H Piles) - WB Outside Widening Area (Bridge over John Young PKWY)22276
IIIAWBO-ST34PH IIIA - Remove Concrete Form for Pier 2, 3, 4(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John38
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal1837
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB25
IIIBWBO-ST10PH IIIB - Production Pile - WB Outside Widening Area (Bridge over universal BLVD)7202
IIIBWBO-ST11PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)2023
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)1048
IIIBWBO-ST28PH IIIB - Rip Rap Under Bridge - WB Outside Widening Area (Bridge over Shingle Creek)2036
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive1563
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside2234
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)754
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive1533
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman1548
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive1017
USDED-CO-002Duke Energy Distribution (B)77595
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)1052
IIIAWBO-ST160PH IIIA - Superstructure Deck - WB Outside Widening Area (Bridge over John Young PKWY)2246
IIIAWBO-ST171PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge over John Young PKWY)56
IIIAWBO-ST201PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge over John Young PKWY)35
IIIAWBO-ST580PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)1032
IIIAWBO-ST690PH IIIA - Pier 2, 3, 4 (F/R/P)(Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)1027
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)514
IIIAWBO-ST710PH IIIA - Pier 2, 3, 4 (F/R/P) (Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)2253
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)10223
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive20222
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening26
IIIBWBO-EW101PH IIIB - Surcharge/ Embankment 2 - WB Outside Widening Area1819
IIIBWBO-EW102PH IIIB - Surcharge/ Embankment 3 - WB Outside Widening Area1724
IIIBWBO-EW103PH IIIB - Surcharge/ Embankment 4 - WB Outside Widening Area1722
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area20654
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area20531
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area20128
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening15418
IIIBWBO-GC100PH IIIB - MISC. Demo - WB Outside Widening Area10194
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area20159
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area20152
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area20126
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area10175
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area10148
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area1076
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening49
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area46
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)22509
IIIBWBO-SP110PH IIIB - Drainage (Universal - International) - WB Outside Widening Area (SR528)22450
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)10136
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)4110
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)5200
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)586
IIIBWBO-ST100PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over Universal BLVD)1530
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)34
IIIBWBO-ST180PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over universal BLVD)23
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)716
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)1554
IIIBWBO-ST350PH IIIB - Superstructure Deck SIB & Start Rebar - WB Outside Widening (Area Bridge over Universal BLVD)2021
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)811
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)711
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)811
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)414
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)2030
IIIBWBO-ST631PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over International DR)5143
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)643
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)243
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)343
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)343
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)58
IIIBWBO-TC110PH IIIB - Set Temp Traffic Barriers - WB Outside Widening Area340
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area4111
IIICWBO-ST100PH IIIA - Demo Bridge - WB Outside Widening Area (Bridge over John Young PKWY)47

The following issues were found:

IIAR110
Finish day is Sunday
IIBR120
Finish day is Sunday
IIBR140
Finish day is Sunday
IIBR170
Finish day is Sunday
IIICR140
Starts on a day off: Sunday 18-Mar-18 00:00:00
IIICR160
Finish day is Sunday
IVR-ET60
Starts on a day off: Sunday 06-May-18 00:00:00
IBR-AP120
Starts and finishes at the same date and time
IBR-EW110
Starts and finishes at the same date and time
IBR-GC120
Starts and finishes at the same date and time
IBR-GC130
Starts and finishes at the same date and time
IBR-GC150
Starts and finishes at the same date and time
IBR-GC160
Starts and finishes at the same date and time
IBR-RW120
Starts and finishes at the same date and time
IBR-RW130
Starts and finishes at the same date and time
IBR-TC100
Starts and finishes at the same date and time
IBR-TC110
Starts and finishes at the same date and time
IIIC-CP10
Starts and finishes at the same date and time
TF-CO-014
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-018
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-019
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-020
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-024
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-025
Finish day is Sunday
IIBEBO-ST4
Starts on a day off: Sunday 01-May-16 00:00:00
IIBR-AP110
Finish day is Sunday
IIBR-AP140
Starts on a day off: Sunday 29-Oct-17 00:00:00
IIBR-AP150
Finish day is Saturday
IIBR-AP160
Starts and finishes at the same date and time
IIBR-AP170
Starts and finishes at the same date and time
IIBR-AP180
Finish day is Sunday
IIBR-EW130
Finish day is Sunday
IIBR-EW140
Finish day is Sunday
IIBR-EW180
Starts and finishes at the same date and time
IIBR-GC150
Starts and finishes at the same date and time
IIBR-GC240
Starts and finishes at the same date and time
IIBR-GC300
Starts and finishes at the same date and time
IIBR-GC340
Starts and finishes at the same date and time
IIBR-GC390
Starts and finishes at the same date and time
IIBR-GC400
Starts and finishes at the same date and time
IIBR-ITS40
Finish day is Sunday
IIBR-RW120
Finish day is Sunday
IIBR-RW130
Finish day is Sunday
IIBR-RW210
Starts and finishes at the same date and time
IIBR-RW230
Starts and finishes at the same date and time
IIBR-RW290
Starts and finishes at the same date and time
IIBR-SM400
Finish day is Sunday
IIBR-SM410
Finish day is Sunday
IIBR-SM420
Finish day is Sunday
IIBR-SM430
Finish day is Sunday
IIBR-SM470
Finish day is Sunday
IIBR-SP140
Starts and finishes at the same date and time
IIBR-SP170
Starts and finishes at the same date and time
IIBR-SP180
Starts and finishes at the same date and time
IIBR-SP190
Starts and finishes at the same date and time
IIBR-SP200
Starts and finishes at the same date and time
IIBR-SP250
Starts and finishes at the same date and time
IIBR-TC230
Starts and finishes at the same date and time
IIBR-TC250
Starts and finishes at the same date and time
IIBR-TC280
Starts and finishes at the same date and time
IIBR-TC290
Starts and finishes at the same date and time
IIBR-TC300
Starts and finishes at the same date and time
IIBR-TC310
Starts and finishes at the same date and time
IIBR-TC320
Starts and finishes at the same date and time
IIBR-TC330
Starts and finishes at the same date and time
IIBR-TC340
Finish day is Sunday
IIBR-TC360
Starts and finishes at the same date and time
IIBR-TC370
Starts and finishes at the same date and time
IIBR-TC380
Starts and finishes at the same date and time
IIBR-TC390
Starts and finishes at the same date and time
IIBR-TC400
Starts and finishes at the same date and time
IIBR-TC410
Starts and finishes at the same date and time
IIBR-TC450
Starts and finishes at the same date and time
IICR-EW100
Finish day is Sunday
IICR-GC110
Starts and finishes at the same date and time
IICR-SP100
Finish day is Sunday
IICR-SP120
Starts on a day off: Saturday 08-Jul-17 00:00:00
IICR-TC140
Starts and finishes at the same date and time
IICR-TC160
Starts on a day off: Saturday 16-Dec-17 00:00:00
Finish day is Sunday
IICR-TC170
Finish day is Sunday
IIDR-TC100
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBR-ET40
Finish day is Sunday
PRE-FA-037
Starts and finishes at the same date and time
PRE-RA-037
Starts and finishes at the same date and time
IBEBM-AP100
Finish day is Sunday
IBEBM-AP120
Starts and finishes at the same date and time
IBEBM-RW240
Starts and finishes at the same date and time
IBEBM-RW250
Starts and finishes at the same date and time
IBEBM-RW260
Starts and finishes at the same date and time
IBEBM-RW270
Starts and finishes at the same date and time
IBEBM-ST550
Finish day falls on a holiday
IBEBM-ST580
Starts and finishes at the same date and time
IBEBM-ST660
Finish day is Saturday
IBEBM-ST770
Starts and finishes at the same date and time
IBEBM-ST860
Starts and finishes at the same date and time
IBEBM-TC220
Finish day is Sunday
IBEBO-EW120
Starts and finishes at the same date and time
IBEBO-EW150
Finish day is Sunday
IBEBO-EW160
Start day falls on a holiday
Finish day is Sunday
IBEBO-EW170
Start day falls on a holiday
Finish day is Sunday
IBWBM-RW130
Finish day is Sunday
IBWBM-RW160
Starts and finishes at the same date and time
IBWBM-RW170
Starts and finishes at the same date and time
IBWBM-RW190
Starts and finishes at the same date and time
IBWBM-RW200
Starts and finishes at the same date and time
IBWBM-RW230
Finish day is Sunday
IBWBM-SP120
Finish day is Sunday
IBWBM-ST390
Finish day falls on a holiday
IBWBM-ST430
Starts and finishes at the same date and time
IBWBM-ST560
Finish day is Saturday
IBWBM-ST650
Finish day is Sunday
IBWBM-ST680
Starts and finishes at the same date and time
IBWBM-TC150
Finish day is Sunday
IIBEBO-ST23
Finish day falls on a holiday
IIBEBO-W110
Finish day is Sunday
IIBEBO-W120
Finish day is Sunday
IIIBR-EW120
Finish day is Sunday
IIIBR-GC100
Finish day is Sunday
IIIBR-RW160
Finish day is Sunday
IIIBR-SM600
Finish day is Saturday
IIIBR-SM610
Finish day is Saturday
IIIBR-SM620
Finish day is Saturday
IIIBR-SM630
Finish day is Saturday
IIIBR-SP120
Starts and finishes at the same date and time
IIIBR-SP130
Starts and finishes at the same date and time
IIIBR-SP140
Starts and finishes at the same date and time
IIIBR-SP160
Starts on a day off: Sunday 21-Jan-18 00:00:00
Finish day is Sunday
IIIBR-SP180
Finish day is Saturday
IIIBR-TC160
Starts and finishes at the same date and time
IIIBR-TC170
Starts on a day off: Sunday 14-Jan-18 00:00:00
Finish day is Sunday
IIIBR-TC200
Starts and finishes at the same date and time
IIIBR-TC270
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBR-TC280
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBWBO-ST2
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBWBO-ST4
Starts on a day off: Sunday 01-May-16 00:00:00
IIIBWBO-ST8
Finish day is Sunday
IIICR-AP110
Finish day is Saturday
IIICR-EW110
Finish day is Sunday
IIICR-GC160
Starts on a day off: Saturday 02-Jun-18 00:00:00
IIICR-RW130
Finish day is Sunday
IIICR-TC120
Finish day is Saturday
IIAEBO-TC100
Starts on a day off: Sunday 20-Sep-15 00:00:00
Finish day is Sunday
IIBEBO-AP140
Finish day is Sunday
IIBEBO-EW100
Finish day is Sunday
IIBEBO-EW112
Finish day is Sunday
IIBEBO-GC100
Finish day is Sunday
IIBEBO-SP110
Finish day is Sunday
IIBEBO-SP120
Finish day is Sunday
IIBEBO-SP140
Finish day is Sunday
IIBEBO-ST160
Starts on a day off: Saturday 02-Dec-17 00:00:00
IIBEBO-ST190
Finish day is Sunday
IIBEBO-ST220
Finish day is Sunday
IIBEBO-ST370
Finish day is Sunday
IIBEBO-ST390
Finish day is Sunday
IIBEBO-ST500
Finish day is Sunday
IIBEBO-ST560
Starts on a day off: Saturday 30-Sep-17 00:00:00
Finish day is Saturday
IIBEBO-ST700
Finish day is Sunday
IIDEBO-ST240
Starts on a day off: Sunday 03-Jun-18 00:00:00
IIIAWBO-ST24
Finish day is Sunday
IIIBWBO-ST14
Starts and finishes at the same date and time
IIIAWBO-ST201
Finish day is Sunday
IIIAWBO-ST420
Finish day falls on a holiday
IIIAWBO-ST600
Starts on a day off: Saturday 23-Sep-17 00:00:00
Finish day is Saturday
IIIBWBO-SP110
Finish day is Sunday
IIIBWBO-ST400
Finish day is Sunday
IIIBWBO-ST440
Finish day is Sunday
IIIBWBO-ST680
Finish day is Sunday
IIIBWBO-ST690
Starts on a day off: Sunday 08-Jul-18 00:00:00
IIIBWBO-ST750
Start day falls on a holiday

We noticed that 551 activities took longer than it was originally anticipated. The following table compares original and actual durations for some of the completed activities. This table should be used as a tool to review the durations for similar activities not yet started.

Activity IDActivity DescriptionOriginal DurationActual Duration
IIAR100PH IIA - Construct Ramp O Diversion - Ramp O925
IIAR110PH IIA - Construct Ramp O Diversion - Ramp O (Tie in to EB)518
IIBR100PH IIB - Construct Ramp E Diversion - Ramp E1856
IIBR110PH IIB - Construct Ramp I-1 Diversion - Ramp I-12063
IIBR120PH IIB - Construct Ramp R-1 Diversion - Ramp R-120138
IIBR140PH IIB - Construct Ramp R-2 Diversion - Ramps R-22025
IIBR150PH IIB - Construct Ramp H Diversion - Ramp H2057
IIBR151PH IIB - Construct Ramp L Diversion - Ramp L20117
IICR100PH IIC - Construct Ramp S-2 Diversion - Ramp S-220212
IICR120PH IIC - Construct Ramp M Diversion - Ramp M2093
IIIAR100PH IIIA - Construct Ramp Diversion P - Ramp P (STA 2013+84 to 2005+50)15194
IIIAR110PH IIIA - Construct Ramp T Diversion - Ramps T628
IIIBR110PH IIIB - Construct Ramp J Diversion/Temp Pavement - Ramp J2032
IIIBR140PH IIIB - Construct Ramp Q Diversion/Temp Pavement - Ramp Q2021
IIICR110PH IIIC - Construct Ramp N Diversion - Ramp N20109
IIICR140PH IIIC - Remove Diversion / Construct Ramp Shoulder/Gore - Ramp J1214
IVR-ET50PH IV - Erect Trusses (9-17)1824
IVR-ET60PH IV - Erect Trusses (18-24)14101
GC-GCN220Written Suspend order - FOC related to pending change5091
IAI-TC120PH IA - Set Temp Traffic Barriers - Interchanges Roads John Young PKW134
IAR-TC130PH IA - Set Temp Traffic Barriers for Phase IB - WB Median Widening514
IAR-TC140PH IA - Set Temp Traffic Barriers for Phase IB - EB Median Widening525
IBR-IDS10PH IB - Install Drilled Shafts (1-13)13135
IBR-RW110PH IB - Base - Ramp B/C Gore45
IIBR-EC10PH IIB - Erect Cantilevers (1-3)318
TF-CO-003Begin Electrical (Stub Outs & Site Electrical)2031
TF-CO-014Pull Wire & Install Light Fixtures1545
TF-CO-018Install Lighting2245
TF-CO-019Install Security System2245
TF-CO-020Install Lightning Protection1045
TF-CO-023Erect Truss57
TF-CO-024Wall Treatments (Ply)2245
TF-CO-027Cont. HVAC2580
TF-FA-001Fabricate and Deliver Precast Erection20148
IAEBO-W100PH IA - Noise/Sound Wall Prep Work (W-1) - EB Outside Widening2050
IAEBO-W200PH IA - Install Panels (128000-160000 SF) - EB Outside Widening2023
IBEBM-W100PH IB - Median Wall - Grading (JYP to TPK)20238
IBEBM-W110PH IB - Median Wall - FFP Footing/Stem (JYP to TPK)15233
IBEBM-W130PH IB - Wire (mse) Retaining Wall TW 18 - EB Median Widening (SR528)1636
IBEBM-W140PH IB - Wire (mse) Retaining Wall TW 20 - EB Median Widening (SR528)1623
IBR-IHM300PH IB - Install High Mast/Service (1-3)10490
IBWBM-W100PH IB - Median Wall - Construct/ slip Top (JYP to TPK)15208
IBWBM-W120PH IB - Wire (mse) Retaining Wall TW 19 - WB Median Widening (SR528)1636
IBWBM-W140PH IB - Wire (mse) Retaining Wall TW 21 - WB Median Widening (SR528)1623
IIAR-AP100PH IIB - Asphalt - Structural - Ramp O413
IIAR-EW100PH IIB - Embankment - Ramp O20347
IIAR-GC100PH IIB - Performance Turf, SOD - Ramp O110
IIAR-RW100PH IIB - Stabilization - Ramp O46
IIAR-RW110PH IIB - Base - Ramp O830
IIAR-SP100PH IIA - Jack & Bore (42" (Sta 351+00 near Duke energy access platform) - Ramp O35
IIAR-SP110PH IIB - Drainage - Ramp O20194
IIBEBO-ST2PH IIB - Test Pile - EB Outside Widening (Bridge over International DR)337
IIBEBO-ST4PH IIB - Production Pile - EB Outside Widening (Bridge over International DR)11375
IIBEBO-ST5PH IIB - Pier 2, (F/R/P) (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over International DR)1539
IIBEBO-ST7PH IIB- Removal of Concrete Forms for Pier 2, (Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Internatio12
IIBR-AP110PH IIB - Asphalt - Structural - Ramp E263
IIBR-AP120PH IIB - Asphalt - Structural - Ramp C4114
IIBR-AP130PH IIB - Asphalt - Structural - Ramp I-123
IIBR-AP140PH IIB - Asphalt - Structural - Ramp H273
IIBR-AP150PH IIB - Asphalt - Structural - Ramp R-2262
IIBR-AP180PH IIB - Asphalt - Structural - Ramp U2109
IIBR-EW110PH IIB - Embankment - Ramp E5300
IIBR-EW120PH IIB - Embankment - Ramp S-15205
IIBR-EW122PH IIB - Embankment - Ramp A523
IIBR-EW130PH IIB - Embankment - Ramp R-15108
IIBR-EW140PH IIB - Embankment - Ramp C447
IIBR-EW160PH IIB - Embankment - Ramp H586
IIBR-EW170PH IIB - Embankment - Ramp R-2519
IIBR-EW200PH IIB - Embankment - Ramp U5321
IIBR-GC330PH IIB - Performance Turf, SOD - Ramp R12
IIBR-IDS20PH IIB - Install Drilled Shafts (14-35)22156
IIBR-IDS30PH IIB - Install Drilled Shafts (36-57)22124
IIBR-ITS30PH IIB - Install Conduit/Boxes (Univ to JYP)20353
IIBR-ITS40PH IIB - Install Conduit/Boxes (JYP to TPK)20365
IIBR-ITS50PH IIB - Install ITS Poles (1-20)2077
IIBR-ITS60PH IIB - Install ITS Poles (21-41)2069
IIBR-ITS70PH IIB - Install CCTV's (1-8)1691
IIBR-ITS80PH IIB - Install CCTV's (9-16)1491
IIBR-ITS90PH IIB - Install CCTV's (17-22)1029
IIBR-RW120PH IIB - Stabilization - Ramp E254
IIBR-RW130PH IIB - Base - Ramp E841
IIBR-RW140PH IIB - Stabilization - Ramp C1228
IIBR-RW141PH IIB - Stabilization - Ramp A26
IIBR-RW150PH IIB - Stabilization - Ramp I-124
IIBR-RW151PH IIB - Base - Ramp A814
IIBR-RW160PH IIB - Base - Ramp C2242
IIBR-RW180PH IIB - Stabilization - Ramp H253
IIBR-RW190PH IIB - Base - Ramp H827
IIBR-RW200PH IIB - Stabilization - Ramp R-223
IIBR-RW220PH IIB - Base - Ramp R-2837
IIBR-RW240PH IIB - Stabilization - Ramp L27
IIBR-RW260PH IIB - Stabilization - Ramp U24
IIBR-RW270PH IIB - Base - Ramp U830
IIBR-SM380PH IIB - Shoulder Mount Light Pole/Service (I-4 to International) (14 EA)1489
IIBR-SM390PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (A)20354
IIBR-SM400PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)20242
IIBR-SM410PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (C)20221
IIBR-SM420PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (14 EA)14100
IIBR-SM430PH IIB - Shoulder Mount Light Pole/Service (International to Univ.) (7 EA)7100
IIBR-SM440PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (A)18236
IIBR-SM450PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (19 EA)19249
IIBR-SM460PH IIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (18 EA) (B)18243
IIBR-SM470PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)20305
IIBR-SM480PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)20293
IIBR-SM490PH IIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)20123
IIBR-SP110PH IIB - Drainage - Ramp E1012
IIBR-SP130PH IIB - Drainage - Ramp I-11065
IIBR-SP150PH IIB - Drainage - Ramp C1041
IIBR-SP240PH IIB - Drainage - Ramp R-1725
IICR-AP100PH IIC - Asphalt - Structural - Ramp S-224
IICR-EW100PH IIC - Embankment - Ramp S-25344
IICR-EW120PH IIC - Embankment - Ramp M5147
IICR-GC190PH IIC - Variable Height Barrier Wall - Ramp S-21043
IICR-RW100PH IIC - Stabilization - Ramp S-2214
IICR-RW140PH IIC - Base - Ramp M826
IICR-RW150PH IIC - Stabilization - Ramp M222
IICR-RW330PH IIC - Complete Widening - Ramp E828
IICR-RW340PH IIC - Complete Widening - Ramp H854
IICR-RW360PH IIC - Complete Widening - Ramp L843
IICR-SP100PH IIC - Drainage - Ramp S-25148
IICR-SP120PH IIC - Drainage - Ramp M10212
IICR-SP130PH IIC - Remove Ramp O Diversion - Construct EB Roadway Tie-In1525
IIIBR-EC20PH IIIB - Erect Cantilevers (4-9)679
IIIBR-ET40PH IIIB - Erect Trusses (1-8)16154
ITS10-1030Plan Revision 10 - Review and Procurement1430
IVEBM-W230PH IV - Median Wall - Excavate - Station 311 to 33223
IVEBM-W260PH IV - Median Wall - Excavate - Station 335 to 35247
PRE-FA-007Fabricate and Deliver 400 Concrete Structures (Bearing Pads)3058
PRE-FA-008Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750088 & 750215- I-Drive)20235
PRE-FA-009Fabricate and Deliver 450 Precast Prestressed Florida I Beam 45" (Structures 750089, & 750216- Universal/Orangewood)20233
PRE-FA-010Fabricate and Deliver 450 Precast Prestressed Beams TY II (Structures 750631-Shingle Creek)2092
PRE-FA-011Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750091 & 750218- JYP)20219
PRE-FA-012Fabricate and Deliver 450 Precast Prestressed Florida I Beam 36" (Structures 750629 Ramp S JYP & 750630 Ramp T JYP)20443
PRE-FA-013Fabricate and Deliver 455 Auger Cast Piles (w/noise wall submittal)5694
PRE-FA-014Fabricate and Deliver 534 Noise and Perimeter Walls5688
PRE-FA-015Fabricate and Deliver 548 Retaining/MSE Wall Systems42634
PRE-FA-016Fabricate and Deliver 641 Prestressed Concrete Poles35325
PRE-FA-017Fabricate and Deliver 646 Aluminum Pedestal Poles5659
PRE-FA-018Fabricate and Deliver 650 Traffic Signals56143
PRE-FA-019Fabricate and Deliver 700 Highway Signing (Single, Multi, Panel, and Overhead)126442
PRE-FA-020Fabricate and Deliver 992 Under deck Lighting56453
PRE-FA-021Fabricate and Deliver 05500 Metal Fabrications140154
PRE-FA-022Fabricate and Deliver 133420 Pre-Engineered Precast Concrete Structure84120
PRE-FA-023Fabricate and Deliver 263213 Engine Generator84213
PRE-FA-024Fabricate and Deliver 633 Communication Cable42575
PRE-FA-025Fabricate and Deliver 635 Pull, Splice, & Junction Boxes42511
PRE-FA-027Fabricate and Deliver 663 Signal Priority and Preemption Systems3095
PRE-FA-031Fabricate and Deliver 081100 Metal Doors and Frames56217
PRE-FA-032Fabricate and Deliver 099100 Painting Product Data and Sample42162
PRE-FA-034Fabricate and Deliver 231113 Fuel Oil Piping70206
PRE-FA-035Fabricate and Deliver 231323 Aboveground Diesel Storage Tank and Piping84216
PRE-FA-038Fabricate and Deliver 238119 Packaged Air Conditioners42216
PRE-FA-039Fabricate and Deliver 260536 Cable Trays42111
PRE-FA-041Fabricate and Deliver 682 CCTV Camera42511
PRE-FA-042Fabricate and Deliver 781 DMS56105
PRE-FA-044Fabricate and (Ready to) Deliver 783 ITS Fiber Optic Cable56624
PRE-FA-045Fabricate and Deliver 786 ITS Vehicle Detection System5680
PRE-FA-046Fabricate and Deliver 784 ITS Managed Ethernet Hub Switch42789
PRE-FA-049Fabricate and Deliver 262913 ITS Standby Generator Product Data and Shop Drawing70498
PRE-FA-050Fabricate and Deliver 400 Concrete Structures (SIP Metal Forms)42142
PRE-PS-001Prepare and Submit 506 Bridge Drainage System28164
PRE-PS-002Prepare and Submit 455 Pile Installation Plan (Structures 750089 & 750216-Universal/Orangewood)7129
PRE-PS-006Prepare and Submit Precast Erection28223
PRE-PS-007Prepare and Submit 400 Concrete Structures (Bearing Pads)2851
PRE-PS-013Prepare and Submit 455 Auger Cast Piles (w/noise wall submittal)2843
PRE-PS-014Prepare and Submit 534 Noise and Perimeter Walls2848
PRE-PS-015Prepare and Submit 548 Retaining/MSE Wall Systems28114
PRE-PS-016Prepare and Submit 641 Prestressed Concrete Poles28407
PRE-PS-018Prepare and Submit 650 Traffic Signals28402
PRE-PS-019Prepare and Submit 700 Highway Signing (Single, Multi, Panel, and Overhead)28421
PRE-PS-021Prepare and Submit 05500 Metal Fabrications28123
PRE-PS-022Prepare and Submit 133420 Pre-Engineered Precast Concrete Structure28223
PRE-PS-023Prepare and Submit 263213 Engine Generator2875
PRE-PS-024Prepare and Submit 633 Communication Cable28455
PRE-PS-025Prepare and Submit 635 Pull, Splice, & Junction Boxes28239
PRE-PS-027Prepare and Submit 663 Signal Priority and Preemption Systems28594
PRE-PS-029Prepare and Submit 033000 Cast-In-Place Concrete2830
PRE-PS-030Prepare and Submit 042200 Masonry28120
PRE-PS-033Prepare and Submit 101400 Signage2830
PRE-PS-034Prepare and Submit 231113 Fuel Oil Piping2867
PRE-PS-035Prepare and Submit 231323 Aboveground Diesel Storage Tank and Piping2843
PRE-PS-037Prepare and Submit 233113 Ductwork Product Data and Shop Drawing2891
PRE-PS-041Prepare and Submit 682 CCTV Camera28205
PRE-PS-044Prepare and Submit 783 ITS Fiber Optic Cable28169
PRE-PS-045Prepare and Submit 660 ITS Vehicle Detection System28240
PRE-PS-049Prepare and Submit 639 ITS Standby Generator Product Data and Shop Drawing28372
PRE-PS-050Prepare and Submit 400 Concrete Structures (SIP Metal Forms)28184
PRE-RA-013Review and Approve 455 Auger Cast Piles (w/noise wall submittal)4552
PRE-RA-014Review and Approve 534 Noise and Perimeter Walls4597
PRE-RA-015Review and Approve 548 Retaining/MSE Wall Systems45124
PRE-RA-016Review and Approve 641 Prestressed Concrete Poles45434
PRE-RA-019Review and Approve 700 Highway Signing (Single, Multi, Panel, and Overhead)45469
PRE-RA-021Review and Approve 05500 Metal Fabrications45100
PRE-RA-023Review and Approve 263213 Engine Generator45110
PRE-RA-024Review and Approve 633 Communication Cable45478
PRE-RA-025Review and Approve 635 Pull, Splice, & Junction Boxes45346
PRE-RA-027Review and Approve 663 Signal Priority and Preemption Systems45591
PRE-RA-029Review and Approve 033000 Cast-In-Place Concrete45224
PRE-RA-041Review and Approve 682 CCTV Camera45210
PRE-RA-042Review and Approve 781 DMS45266
PRE-RA-044Review and Approve 633 ITS Fiber Optic Cable45226
PRE-RA-045Review and Approve 660 ITS Vehicle Detection System45309
PRE-RA-049Review and Approve 639 ITS Standby Generator Product Data and Shop Drawing45363
PRE-RA-050Review and Approve 400 Concrete Structures (SIP Metal Forms)45121
USS-CO-001Summit2236
IAEBO-AP100PH IA - Overbuild Shoulder - EB Outside Widening (SR528)725
IAEBO-EW100PH IA - Embankment(Duke energy access Poles) - EB Outside Widening34
IAEBO-GC100PH IA - Set Erosion Control Devices - EB Outside Widening2055
IAEBO-GC110PH IA - Clear & Grub - EB Outside Widening1777
IAEBO-GC130PH IA - Clear & Grub - EB Outside Widening (I-4 to Ramp H)34
IAEBO-TC110PH IA - Temp Striping for Phase IB - EB Outside Widening (SR528)542
IAWBO-AP100PH IA - Overbuild Shoulder - WB Outside Widening Area (SR528)720
IAWBO-GC100PH IA - Set Erosion Control Devices - WB Outside Widening Area2055
IAWBO-GC110PH IA - Clear & Grub - WB Outside Widening Area20101
IAWBO-TC100PH IA - Install Advance Sign & Traffic Control Devices - WB Outside Widening Area35
IAWBO-TC110PH IA - Temp Striping for Phase IB - WB Outside Widening Area (SR528)436
IBEBM-AP110PH IB - Asphalt - Structural - EB Median Widening (I-Drive to Univ)36
IBEBM-GC100PH IB - Median Clearing and Grubbing - EB Median Widening578
IBEBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10222
IBEBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10247
IBEBM-RW280PH IB - Base (I4-International Drive) - EB Median Widening8150
IBEBM-RW310PH IB - Guard Rail Removal - EB Median Widening3299
IBEBM-RW320PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10193
IBEBM-RW330PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - EB Median Widening10188
IBEBM-ST100PH IB - Construct Crane Access - EB Median Widening (Bridge over Shingle Creek)35
IBEBM-ST110PH IB - DemoTraffic Rail / End Bents - EB Median Widening (Bridge over Shingle Creek)863
IBEBM-ST130PH IB - Demo Traffic Rails - EB Median Widening (Bridge over John Young PKWY)434
IBEBM-ST150PH IB - Demo Traffic Rails - EB Median Widening (Bridge over International DR)297
IBEBM-ST160PH IB - Test Pile (Concrete) - EB Median Widening (Bridge over Shingle Creek)531
IBEBM-ST190PH IB - Production Pile (Concrete) - EB Median Widening (Bridge over Shingle Creek)2068
IBEBM-ST210PH IB - Temp Sheet Pile - EB Median Widening (Bridge over John Young PKWY)375
IBEBM-ST220PH IB - Drive Production Pile (H Piles) - EB Median Widening (Bridge over John Young PKWY)20122
IBEBM-ST230PH IB - Production Pile - EB Median Widening (Bridge over International DR)232
IBEBM-ST250PH IB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Median Widening (Bridge over International DR)1049
IBEBM-ST260PH IB - Demo Traffic Rails - EB Median Widening (Bridge over universal BLVD)273
IBEBM-ST270PH IB - Test Pile - EB Median Widening (Bridge over universal BLVD)215
IBEBM-ST280PH IB - Temp Sheet Pile - EB Median Widening (Bridge over universal BLVD)236
IBEBM-ST290PH IB - Production Pile - EB Median Widening (Bridge over universal BLVD)2112
IBEBM-ST330PH IB - Wall Bent 1 - EB Median Widening (Bridge over International DR)521
IBEBM-ST340PH IB - Rip Rap Under Bridge - EB Median Widening (Bridge over Shingle Creek)1044
IBEBM-ST350PH IB - Pier 2 & 3 (F/R/P)( Pile Cap) - EB Median Widening (Bridge over Shingle Creek)1519
IBEBM-ST360PH IB - Pier 2, 3, 4(F/R/P) ( Pier Cap) - EB Median Widening (Bridge over John Young PKWY)2261
IBEBM-ST370PH IB - End Bent 1 - EB Median Widening (Bridge over International DR)519
IBEBM-ST380PH IB - Wall Bent 3 - EB Median Widening (Bridge over International DR)58
IBEBM-ST400PH IB - Remove Concrete Form for Pier 2, 3, (Pile Cap) - EB Median Widening (Bridge over Shingle Creek)13
IBEBM-ST430PH IB - End Bent 1 - EB Median Widening (Bridge over Shingle Creek)1012
IBEBM-ST450PH IB - Set Beams - EB Median Widening (Bridge over International Drive)13
IBEBM-ST460PH IB - Superstructure Deck - EB Median Widening (Bridge over International Drive)1526
IBEBM-ST470PH IB - Remove Concrete Forms for Pier 2, 3, 4 (Footer, Column & Pier Cap) - EB Median Widening (Bridge over John Young374
IBEBM-ST480PH IB - Temp Sheet Pile Removal - EB Median Widening (Bridge over John Young PKWY)358
IBEBM-ST520PH IB - Wall Bent 5 - EB Median Widening (Bridge over John Young PKWY)528
IBEBM-ST540PH IB - Pier 2,(F/R/P) (Footer, Column & Pier Cap) - EB Median Widening (Bridge over Universal BLVD)1039
IBEBM-ST570PH IB - End Bent 5 - EB Median Widening (Bridge over John Young PKWY)828
IBEBM-ST660PH IB - Set Beams - EB Median Widening (Bridge over John Young PKWY)34
IBEBM-ST670PH IB - Superstructure Deck - EB Median Widening (Bridge over John Young PKWY)2234
IBEBM-ST690PH IB - Superstructure Deck- EB Median Widening (Bridge over Shingle Creek)2231
IBEBM-ST710PH IB - End Bent 3 - EB Median Widening (Bridge over universal BLVD)512
IBEBM-ST740PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over John Young PKWY)34
IBEBM-ST750PH IB - Set Beams - EB Median Widening (Bridge over Universal BLVD)27
IBEBM-ST760PH IB - Superstructure Deck - EB Median Widening Bridge over Universal BLVD)1549
IBEBM-ST850PH IB - Concrete Slope Pavement - EB Median Widening (Bridge over universal BLVD)34
IBEBM-ST890PH IB - Demo Bridge Deck - EB Median Widening (Bridge over International DR)597
IBEBM-ST900PH IB - Demo Bridge Deck - EB Median Widening (Bridge over universal BLVD)573
IBEBM-ST950PH IB - Demo Bridge Deck - EB Median Widening (Bridge over John Young PKWY)1242
IBEBM-ST960PH IB - Pier 2, 3, 4(F/R/P) (Footer, Column) - EB Median Widening (Bridge over John Young PKWY)2289
IBEBM-TC210PH IB - Construct Diversion at Shingle Creek- EB Median Widening2255
IBEBM-TC220PH IIIA - Construct Diversion at Shingle Creek - WB Median Widening1532
IBEBO-EW110PH IB - Pond Excav/Embank JYP to TPK - EB Outside Widening20191
IBEBO-EW130PH IB - Pond Excav/Embank JYP to Universal - WB Outside Widening20567
IBEBO-EW140PH IB - Pond Excav/Embank Universal to Int. Dr. - WB Outside Widening20566
IBEBO-EW150PH IB - Pond Excav/Embank Universal to Int. Dr. - EB Outside Widening20546
IBEBO-EW160PH IB - Pond Excav/Embank Universal to JYP - EB Outside Widening20538
IBEBO-EW170PH IB - Pond Excav/Embank Int. Dr. to I-4 - WB Outside Widening20171
IBEBO-SP150PH IB - Drainage (Pond 5C @ John Young) - EB Outside Widening (Ponds)15343
IBWBM-AP100PH IB - Asphalt - Structural - WB Median Widening776
IBWBM-GC100PH IB - Median Clearing and Grubbing - WB Median Widening579
IBWBM-RW110PH IB - Grade for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10255
IBWBM-RW111PH IB - Stabilization for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10283
IBWBM-RW180PH IB - Base (Universal-International Drv.) - WB Median Widening842
IBWBM-RW210PH IB - Base (International Drv.-I4) - WB Median Widening841
IBWBM-RW220PH IB - Base for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10237
IBWBM-RW230PH IB - Pavement for Permanent Shoulder Construction (JYP-TRP) - WB Median Widening10226
IBWBM-SP100PH IB - Drainage for JYP Interchange (Sta 354 +04)20149
IBWBM-SP110PH IB - Drainage for JYP to STA 39020181
IBWBM-SP120PH IB - Drainage for JYP to Int. Dr. (Sta 354+04 to 234+50)20136
IBWBM-ST120PH IB - Demo Traffic Rail - WB Median Widening (Bridge over International DR)297
IBWBM-ST130PH IB - Test Pile H-Piles - WB Median Widening (Bridge over International DR)112
IBWBM-ST150PH IB - Production Pile - WB Median Widening (Bridge over International DR)232
IBWBM-ST170PH IB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Median Widening (Bridge over International DR)1049
IBWBM-ST180PH IB - Demo Traffic Rail / End Bents - WB Median Widening (Bridge over universal BLVD)273
IBWBM-ST190PH IB - Test Pile Concrete - WB Median Widening (Bridge over universal BLVD)12
IBWBM-ST200PH IB - Temp Sheet Pile - WB Median Widening (Bridge over universal BLVD)217
IBWBM-ST210PH IB - Production Pile Concrete - WB Median Widening (Bridge over universal BLVD)4109
IBWBM-ST240PH IB - Demo Traffic Rails - WB Median Widening (Bridge over John Young PKWY)434
IBWBM-ST250PH IB - Test Pile (H Piles) - WB Median Widening (Bridge over John Young PKWY)5147
IBWBM-ST280PH IB - Wall Bent 1 - WB Median Widening (Bridge over International DR)521
IBWBM-ST290PH IB - End Bent 1 - WB Median Widening (Bridge over International DR)519
IBWBM-ST300PH IB - Temp Sheet Pile - WB Median Widening (Bridge over John Young PKWY)393
IBWBM-ST310PH IB - Production Pile (H Piles) - WB Median Widening (Bridge over John Young PKWY)15122
IBWBM-ST320PH IB - Wall Bent 3 - WB Median Widening (Bridge over International DR)58
IBWBM-ST340PH IB - Pier 2, 3, 4(F/R/P) (Footer, Column & Pier Cap) - WB Median Widening (Bridge over John Young PKWY)20103
IBWBM-ST350PH IB - Set Beams - WB Median Widening (Bridge over International Drive)23
IBWBM-ST360PH IB - Superstructure Deck - WB Median Widening (Bridge over International Drive)1550
IBWBM-ST380PH IB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Median Widening (Bridge over Universal BLVD)1038
IBWBM-ST400PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over International DR)19
IBWBM-ST450PH IB - Temp Sheet Pile Removal - WB Median Widening (Bridge over John Young PKWY)358
IBWBM-ST490PH IB - Wall Bent 5 - WB Median Widening (Bridge over John Young PKWY)528
IBWBM-ST530PH IB - End Bent 5 - WB Median Widening (Bridge over John Young PKWY)828
IBWBM-ST560PH IB - Set Beams - WB Median Widening (Bridge over John Young PKWY)34
IBWBM-ST570PH IB - End Bent 3 - WB Median Widening (Bridge over universal BLVD)512
IBWBM-ST580PH IB - Superstructure Deck - WB Median Widening (Bridge over John Young PKWY)2242
IBWBM-ST590PH IB - Set Beams - WB Median Widening (Bridge over Universal BLVD)27
IBWBM-ST600PH IB - Superstructure Deck - WB Median Widening Bridge over Universal BLVD)1533
IBWBM-ST660PH IB - Concrete Slope Pavement - WB Median Widening (Bridge over universal BLVD)310
IBWBM-ST710PH IB - Demo Bridge Deck- WB Median Widening (Bridge over universal BLVD)557
IBWBM-ST720PH IB - Demo Bridge Deck - WB Median Widening (Bridge over John Young PKWY)1242
IBWBM-ST730PH IB - Demo Bridge Deck - WB Median Widening (Bridge over International DR)597
IBWBO-SP100PH IB - Jack & Bore JYP Interchange (Sta 354 +04)20149
IBWBO-SP130PH IB - Jack & Bore JYP to TPK (East of Sta 354+04 to 415+33)2041
IBWBO-SP140PH IB - Jack & Bore JYP to Int. Dr. (Sta 354+04 to 234+50)2093
IBWBO-SP160PH IB - Drainage Outfalls (Pond 4A @ John Young) - WB Outside Widening Area (Ponds)20256
IBWBO-SP190PH IB - Drainage Outfalls (Pond 5A @ John Young) - WB Outside Widening Area (Ponds)2054
IIBEB-TC110PH II B - Shift EB traffic to outside across I-Drive17
IIBEBO-IE20PH IIB - Install 2 Ea Mast Arms at Jyp1077
IIBEBO-ST10PH IIB - Test Pile - EB Outside Widening (Bridge over universal BLVD)3162
IIBEBO-ST12PH IIB - Production Pile - EB Outside Widening (Bridge over universal BLVD)7157
IIBEBO-ST14PH IIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over Universal BLVD)1023
IIBEBO-ST20PH IIB - Test Pile (H Piles) - EB Outside Widening (Bridge 750629 Ramp S over JYP)523
IIBEBO-ST21PH IIB - Temp Sheet Pile - EB Outside Widening (Bridge 750629 Ramp S over JYP)683
IIBEBO-ST22PH IIB - Production Pile (H Piles) (1-31) - EB Outside Widening (Bridge 750629 Ramp S over JYP)849
IIBEBO-ST23PH IIB - Production Pile (H Piles) (32-62) -EB Outside Widening (Bridge 750629 Ramp S over JYP)8187
IIBEBO-ST24PH IIB - Pier 2, 3, 4 (F/R/P)(Footer, Column) - EB Outside Widening (Bridge 750629 Ramp S over JYP)22100
IIBEBO-ST26PH IIB - Remove of Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S ov343
IIBEBO-ST28PH IIB - Construct Crane Access - EB Outside Widening (Bridge over Shingle Creek)24
IIBEBO-ST30PH IIB - Production Pile (Concrete) - EB Outside Widening (Bridge over Shingle Creek)2241
IIBEBO-ST31PH IIB - Gravity Wall @ Shingle Creek - EB Outside Widening (Bridge over Shingle Creek)10193
IIBEBO-ST32PH IIB - Rip Rap Under Bridge - EB Outside Widening (Bridge over Shingle Creek)20106
IIBEBO-W100PH IIB - Concrete FACED SHEET Pile Wall Work - Demo Portion of Existing Walls - SE and SW Corners @ I-Drive15126
IIBEBO-W110PH IIB - Concrete FACED SHEET Pile Wall (RW-4A) - SE Corner @ I-Drive15118
IIBEBO-W120PH IIB - Concrete FACED SHEET Pile Wall (RW-3) - SW Corner @ I-Drive1582
IIBEBO-W130PH IIB - Gravity Wall - EB Outside Widening (SR528)10136
IIBEBO-W140PH IIB - MSE Wall RW5 (Level Pads/ Set Panels) - EB Outside Widening (SR528)2283
IIBEBO-W150PH IIB - MSE Wall RW5 (Set coping/ barrier/ moment slab) - EB Outside Widening2237
IIBEBO-W160PH IIIC - MSE Wall RW-1 (Coping/ barrier/ moment slab) - WB Outside1014
IIBR-EHM340PH IIB - Existing High Mast Removal (1-8)1846
IIBR-EHM350PH IIB - Existing High Mast Removal (9-18)1822
IIBR-EHM360PH IIB - Existing High Mast Removal (19-27)18237
IIBR-IHM310PH IIB - Install High Mast/Service (4-6)10391
IIBR-RES120PH IIB - Remove Existing Sign Structures (2-4)618
IICR-TC1000PH IIC - Set Temp Traffic Barriers (Shoulder) - Ramp M12
IIIBR-AP140PH III C - Asphalt - Structural - WB outside 337-340 + old Ramp T344
IIIBR-AP150PH IIIB - Asphalt - Structural - Ramp P to Shingle214
IIIBR-AP160PH IIIB - Asphalt - Structural - Ramp Q23
IIIBR-EW100PH IIIB - Embankment - Ramp G512
IIIBR-EW110PH IIIB - Embankment - Ramp J511
IIIBR-EW130PH IIIB - Embankment - Ramp K551
IIIBR-EW140PH IIIB - Embankment - Ramp T5547
IIIBR-EW150PH IIIB - Embankment - Ramp P to Shingle521
IIIBR-EW160PH IIIB - Embankment - Ramp Q548
IIIBR-GC100PH IIIB - Demo - Ramp G27
IIIBR-GC300PH IIIB - Performance Turf, SOD - Ramp P127
IIIBR-GC320PH IIIB - Guardrail (Roadway) - Ramp P to Shingle212
IIIBR-GC340PH IIIB - Demo - Ramp Q23
IIIBR-IDS40PH IIIB - Install Drilled Shafts (58-63)6131
IIIBR-IDS50PH IIIB - Redo/ repair on drilled shafts OHT-11, OHT 162542
IIIBR-ITS80PH IIIB - Install Conduit/Boxes (JYP to TPK)20470
IIIBR-RW100PH IIIB - Stabilization - Ramp G247
IIIBR-RW120PH IIIB - Stabilization - Ramp J24
IIIBR-RW150PH IIIB - Base - Ramp V89
IIIBR-RW160PH IIIB - Stabilization - Ramp K28
IIIBR-RW170PH IIIB - Base - Ramp K842
IIIBR-RW180PH IIIB - Stabilization - Ramp T2173
IIIBR-RW200PH IIIB - Stabilization - Ramp P to Shingle517
IIIBR-RW210PH IIIB - Base - Ramp P to Shingle1019
IIIBR-RW220PH IIIB - Stabilization - Ramp Q235
IIIBR-RW230PH IIIB - Base - Ramp Q840
IIIBR-RW260PH III C - Base - WB outside 337-340 + old Ramp T892
IIIBR-RW270PH III C - Stabilization - WB outside 337-340 + old Ramp T592
IIIBR-SM530PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA)20241
IIIBR-SM550PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (10 EA)10135
IIIBR-SM570PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (20 EA)20333
IIIBR-SM590PH IIIB - Shoulder Mount Light Pole/Service (Univ. to JYP) (12 EA)1230
IIIBR-SM600PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (A)20357
IIIBR-SM610PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (B)20357
IIIBR-SM620PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (C)20357
IIIBR-SM630PH IIIB - Shoulder Mount Light Pole/Service (JYP to TPK) (20 EA) (D)2091
IIIBR-SP110PH IIIB - Drainage - Ramp J1031
IIIBR-TC250PH IIIB - Set Temp Traffic Barriers (Shoulder) - Ramp P12
IIIBR-TC260PH IIIB - Temp Striping New Ramp Alignment - Ramp P12
IIIBWBO-ST2PH IIIB - Test Pile - WB Outside Widening Area (Bridge over International DR)35
IIIBWBO-ST3PH IIIB - Temp Sheet Pile - WB Outside Widening Area (Bridge over International DR)314
IIIBWBO-ST4PH IIIB - Production Pile - WB Outside Widening Area (Bridge over International DR)11491
IIIBWBO-ST5PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over International DR)2058
IIIBWBO-ST7PH IIIB - Test Pile - WB Outside Widening Area (Bridge over universal BLVD)3204
IIICR-AP100PH IIIC - Asphalt - Structural - Ramp F24
IIICR-AP110PH IIIC - Asphalt - Structural - Ramp N26
IIICR-EW100PH IIIC - Embankment - Ramp F5538
IIICR-EW110PH IIIC - Embankment - Ramp N525
IIICR-GC160PH IIIC - Guardrail (Roadway) - Ramp N220
IIICR-RW100PH IIIC - Stabilization - Ramp F24
IIICR-RW110PH IIIC - Base - Ramp F89
IIICR-RW120PH IIIC - Stabilization - Ramp N217
IIICR-RW130PH IIIC - Base - Ramp N820
IIICR-SP100PH IIIC - Drainage - Ramp F1038
IIICR-SP110PH IIIC - Drainage - Ramp N10163
IVEBM-SP100PH IV - Drainage - Median Widening (West of 311)20137
IVEBM-TC100PH IV - Shift EB traffic to outside I-Drive through Station 312430
IVEBO-SS100PH IV - Install OT Structures - East of JYP20146
IVWBM-RW120PH IV - Grade for road - Station 259+50 to 311 WB Express469
IVWBM-RW160PH IV - Stabilization - Station 259+50 to 311 WB Express366
IVWBM-SP100PH IV - Drainage - Median Widening (East of 311)20134
PRE-FA-0111Fabricate and Deliver 455 Temp Sheet Pile/Critical1483
IIAEBO-TC100PH IIA - Install Sign & Traffic Control Devices - EB Outside Widening1260
IIBEBO-AP110PH IIB - Asphalt - Structural - EB Outside Widening (I-4 to I-Drive)475
IIBEBO-AP120PH IIB - Asphalt - Structural - EB Outside Widening (I-Drive to Univ)8193
IIBEBO-AP130PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 291 to 3204189
IIBEBO-AP140PH IIB - Asphalt - Structural - EB Outside Widening (Univ to JYP) - STA 320 to 332411
IIBEBO-EW100PH IIB - Embankment (I4-Int. Drive) - EB Outside Widening20168
IIBEBO-EW101PH IIB - Embankment (Int. Drive - Universal) - EB Outside Widening1597
IIBEBO-EW102PH IIB - Embankment (Universal - JYP) - EB Outside Widening20109
IIBEBO-EW112PH IIB - Embankment (Int. Drive - Universal) - at Toll Facility5134
IIBEBO-GC100PH IIB - MISC. Demo - EB Outside Widening1060
IIBEBO-GC120PH IIB - Guardrail (Roadway) - EB Outside Widening25
IIBEBO-RW110PH IIB - Stabilization (I4-Int. Drive) - EB Outside Widening2254
IIBEBO-RW111PH IIB - Stabilization (Int. Drive - Universal) - EB Outside Widening22223
IIBEBO-RW112PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 291 to 320)14178
IIBEBO-RW120PH IIB - Base (I4-Int. Drive) - EB Outside Widening2276
IIBEBO-RW130PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - LR15162
IIBEBO-RW140PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 291 to 304)8108
IIBEBO-RW150PH IIB - Base (Int. Drive - Universal)- EB Outside Widening - RCA7160
IIBEBO-RW160PH IIB - Base (Universal - JYP) - EB Outside Widening - RCA618
IIBEBO-RW170PH IIB - Stabilization (Universal - JYP) - EB Outside Widening - (STA 320 to 332)840
IIBEBO-RW180PH IIB - Base (Universal - JYP) - EB Outside Widening - LR - (STA 320 to 332)841
IIBEBO-SP100PH IIB - Drainage (I4-Int. Drive) - EB Outside Widening (SR528)2076
IIBEBO-SP110PH IIB - Drainage (Int. Drive - Universal) - EB Outside Widening (SR528)20119
IIBEBO-SP120PH IIB - Drainage (Universal - JYP) - EB Outside Widening (SR528)20189
IIBEBO-SP130PH IIB - Gutter Drainage - STA 228 - 248 (EB Outside)10226
IIBEBO-SP140PH IIB - Gutter Drainage - STA 280 - 299 (EB Outside)3154
IIBEBO-ST170PH IIB - Pier 2, 3, (F/R/P)(Pile Cap) - EB Outside Widening (Bridge over Shingle Creek)2040
IIBEBO-ST180PH IIB - Wall Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)512
IIBEBO-ST220PH IIB - End Bent 5 - EB Outside Widening (Bridge 750629 Ramp S over JYP)813
IIBEBO-ST240PH IIB - Wall Bent 1 - EB Outside Widening (Bridge over Shingle Creek)48
IIBEBO-ST290PH IIB - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge 750629 Ramp S over JYP)1516
IIBEBO-ST330PH IIB - Approach Slabs - EB Outside Widening (Bridge over International DR)59
IIBEBO-ST340PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over International DR)439
IIBEBO-ST350PH IIB - Superstructure Deck Finish Rebar\Set screed\Pouring - EB Outside Widening (Bridge 750629 Ramp S over JYP)1518
IIBEBO-ST370PH IIB - Lighting Conduit - EB Outside Widening (Bridge over International DR)19
IIBEBO-ST400PH IIB - End Bent 1 - EB Outside Widening (Bridge over universal BLVD)57
IIBEBO-ST440PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge 750629 Ramp S over JYP)1036
IIBEBO-ST510PH IIB - Grind and Groove - EB Outside Widening (Bridge 750629 Ramp S over JYP)45
IIBEBO-ST540PH IIB - Concrete Slope Pavement - EB Outside Widening (Bridge over universal BLVD)58
IIBEBO-ST570PH IIB - Superstructure Deck Pour - EB Outside Widening (Bridge over Universal BLVD)12
IIBEBO-ST590PH IIB - Approach Slabs - EB Outside Widening (Bridge over Shingle Creek)1014
IIBEBO-ST620PH IIB - Grind and Groove - EB Outside Widening (Bridge over Shingle Creek)47
IIBEBO-ST630PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over International DR)513
IIBEBO-ST640PH IIB - Demo Bridge Deck - EB Outside Widening (Bridge over universal BLVD)513
IIBEBO-ST690PH IIB - Pier 2, 3, 4 (F/R/P)(Pier Cap) - EB Outside Widening (Bridge 750629 Ramp S over JYP)2091
IIBEBO-ST700PH IIB - Superstructure Deck (Finish Rebar\Set Screed\Pour) - EB Outside Widening (Bridge over Shingle Creek)1526
IIBEBO-TC130PH IIB - Set Temp Traffic Barriers - EB Outside Widening1027
IIDEBO-RW150PH IID - Construct EB Outside Widening STA 346 to STA 36922186
IIDEBO-ST120PH IID - Temp Sheet Pile - EB Outside Widening (Bridge over John Young PKWY)383
IIDEBO-ST130PH IID - Production Pile (H Piles) - EB Outside Widening (Bridge over John Young PKWY)16303
IIDEBO-ST140PH IID - Pier 2, 3, 4 (F/R/P) (Footer & Column) - EB Outside Widening (Bridge over John Young PKWY)22100
IIDEBO-ST160PH IID - Remove Concrete form for Pier 2, 3, 4(Footer, Column & Pier Cap) - EB Outside Widening (Bridge over JYP)35
IIDEBO-ST170PH IID - Temp Sheet Pile Removal - EB Outside Widening (Bridge over John Young PKWY)667
IIDEBO-ST190PH II D - Wall Bent 1 - EB Outside Widening (Bridge over John Young PKWY)57
IIDEBO-ST210PH II D - Wall Bent 5 - EB Outside Widening (Bridge over John Young PKWY)58
IIDEBO-ST240PH II D - Superstructure Deck SIP & Start Rebar - EB Outside Widening (Bridge over John Young PKWY)1525
IIDEBO-ST260PH IID - Concrete Slope Pavement - EB Outside Widening (Bridge over John Young PKWY)59
IIDEBO-ST300PH II D - Demo Bridge Deck remove slabs - EB Outside Widening (Bridge over John Young PKWY)1038
IIDEBO-ST310PH IID - Pier 2, 3, 4 (F/R/P) ( Pier Cap) - EB Outside Widening (Bridge over John Young PKWY)2052
IIDEBO-ST320PH IID - Demo Bridge Deck hand demo - EB Outside Widening (Bridge over John Young PKWY)1037
IIIAWBO-ST16PH IIIA - Test Pile (H Piles) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)5155
IIIAWBO-ST17PH IIIA - Temp Sheet Pile - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)360
IIIAWBO-ST19PH IIIA - Production Pile (H Piles) (33-65) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)16246
IIIAWBO-ST20PH IIIA - Pier 2, 3, 4 (F/R/P)(Footer, Column) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)2067
IIIAWBO-ST22PH IIIA - Remove Concrete Form Pier 2, 3, 4 (Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T38
IIIAWBO-ST30PH IIIA - Temp Sheet Pile - WB Outside Widening Area (Bridge over John Young PKWY)532
IIIAWBO-ST31PH IIIA - Production Pile (H Piles) - WB Outside Widening Area (Bridge over John Young PKWY)22276
IIIAWBO-ST32PH IIIA - Pier 2, 3, 4 (F/R/P)(Footer, Column) - WB Outside Widening Area (Bridge over John Young PKWY)2251
IIIAWBO-ST34PH IIIA - Remove Concrete Form for Pier 2, 3, 4(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over John38
IIIBR-RES130PH IIIB - Remove Existing Sign Structures (5-13) I-4 to Universal1837
IIIBWB-TC100PH IIIB - Shift WB traffic to EB and Ramp F traffic to inside WB25
IIIBWBO-ST10PH IIIB - Production Pile - WB Outside Widening Area (Bridge over universal BLVD)7202
IIIBWBO-ST11PH IIIB - Pier 2, (F/R/P)(Footer, Column & Pier Cap) - WB Outside Widening Area (Bridge over Universal BLVD)2023
IIIBWBO-ST26PH IIIB - Production Pile (11-30)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)1048
IIIBWBO-ST28PH IIIB - Rip Rap Under Bridge - WB Outside Widening Area (Bridge over Shingle Creek)2036
IIIBWBO-W100PH IIIB - Concrete faced sheet pile Wall - Demo Portion of Existing Walls - NE and NW Corners @ I-Drive1563
IIIBWBO-W110PH IIIB - MSE Wall RW-1 (Leveling Pad/ Set Panels) - WB Outside2234
IIIBWBO-W111PH IIIB - Gravity Wall - WB Outside Widening Area (Bridge over International DR)754
IIIBWBO-W120PH IIIB - Concrete FACED SHEET Pile Wall (RW-4B) - NE Corner @ I-Drive1533
IIIBWBO-W130PH IIIB - Sheet Pile Wall (RW-2) - Drive sheets place walers, deadman1548
IIIBWBO-W140PH IIIB - Concrete facing on Wall (RW-2) - NW Corner @ I-Drive1017
PRE-FA-00123Fabricate and Deliver 455 Structure Foundations Prestressed Concrete Piling 18" (Structures 750089 & 750216)2024
PRE-FA-00132Fabricate and Deliver 455 Structure Foundations Prestressed Concrete Piling 24" (Structure 750631-Shingle Creek)2026
PRE-FA-00145Fabricate and Deliver 455 Structure Foundations Steel Pile HP 14X89 (Structures 750088 and 750215 I-Drive)1463
USDED-CO-001Duke Energy Distribution (A)6139
USDED-CO-002Duke Energy Distribution (B)77595
IIIAWBO-SP100PH IIIA - Jack & Bore - WB Outside Widening Area (SR528)1052
IIIAWBO-ST160PH IIIA - Superstructure Deck - WB Outside Widening Area (Bridge over John Young PKWY)2246
IIIAWBO-ST171PH IIIA - Approach Slabs - WB Outside Widening Area (Bridge over John Young PKWY)56
IIIAWBO-ST201PH IIIA - Traffic Railing (32") - WB Outside Widening Area (Bridge over John Young PKWY)35
IIIAWBO-ST580PH IIIA - Concrete Slope Pavement - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)1032
IIIAWBO-ST690PH IIIA - Pier 2, 3, 4 (F/R/P)(Pier Cap) - WB Outside Widening Area (Bridge 750630 Ramp T over JYP)1027
IIIAWBO-ST700PH IIIA - Production Pile (1-10)(Concrete) - WB Outside Widening Area (Bridge over Shingle Creek)514
IIIAWBO-ST710PH IIIA - Pier 2, 3, 4 (F/R/P) (Pier Cap) - WB Outside Widening Area (Bridge over John Young PKWY)2253
IIIBR-ITS1010PH IIIB - Install Conduit/Boxes ( International to Univ)10223
IIIBWBO-AP100PH IIIB - Asphalt - Structural - WB Outside JYP to I-Drive20222
IIIBWBO-AP120PH IIIB - Asphalt - Structural - (At Wall RW-1) WB Outside Widening26
IIIBWBO-EW101PH IIIB - Surcharge/ Embankment 2 - WB Outside Widening Area1819
IIIBWBO-EW102PH IIIB - Surcharge/ Embankment 3 - WB Outside Widening Area1724
IIIBWBO-EW103PH IIIB - Surcharge/ Embankment 4 - WB Outside Widening Area1722
IIIBWBO-EW110PH IIIB - Embankment (JYP-Universal) - WB Outside Widening Area20654
IIIBWBO-EW120PH IIIB - Embankment (Universal - International) - WB Outside Widening Area20531
IIIBWBO-EW130PH IIIB - Embankment (I-4 to STa 227) - WB Outside Widening Area20128
IIIBWBO-EW140PH IIIB - Pond Excav/Embank JYP to Universal - WB Outside Widening15418
IIIBWBO-GC100PH IIIB - MISC. Demo - WB Outside Widening Area10194
IIIBWBO-RW100PH IIIB - Stabilization (Shingle - Universal) - WB Outside Widening Area20159
IIIBWBO-RW110PH IIIB - Stabilization (Ramp G - International) - WB Outside Widening Area20152
IIIBWBO-RW120PH IIIB - Stabilization ( I4 to Sta 227) - WB Outside Widening Area20126
IIIBWBO-RW140PH IIIB - Base (Shingle - Universal) - WB Outside Widening Area10175
IIIBWBO-RW150PH IIIB - Base (Ramp G - International) - WB Outside Widening Area10148
IIIBWBO-RW160PH IIIB - Base (I4 to Sta 227) - WB Outside Widening Area1076
IIIBWBO-RW170PH IIIB - Stabilization (At RW-1) - WB Outside Widening49
IIIBWBO-RW180PH IIIB - Base (At Wall RW-1) - WB Outside Widening Area46
IIIBWBO-SP100PH IIIB - Drainage (Shingle - Universal) - WB Outside Widening Area (SR528)22509
IIIBWBO-SP110PH IIIB - Drainage (Universal - International) - WB Outside Widening Area (SR528)22450
IIIBWBO-SP130PH IIIB - Gutter Drainage - STA 352 - 342 (WB Outside)10136
IIIBWBO-SP150PH IIIB - Gutter Drainage - STA 301 - 280 (WB Outside)4110
IIIBWBO-SP160PH IIIB - Gutter Drainage - STA 248 - 236 (WB Outside)5200
IIIBWBO-SP170PH III C - Shoulder Gutter - STA 341 - 355 (WB Outside)586
IIIBWBO-ST100PH IIIB - Superstructure Deck Finish Rebar\Set Screed\Pour - WB Outside Widening Area (Bridge over Universal BLVD)1530
IIIBWBO-ST140PH IIIB - Traffic Railing (32") - WB Outside Widening Area (Bridge over Shingle Creek)34
IIIBWBO-ST180PH IIIB - Demo Traffic Rail - WB Outside Widening Area (Bridge over universal BLVD)23
IIIBWBO-ST250PH IIIB - End Bent 1 - WB Outside Widening Area (Bridge over International DR)716
IIIBWBO-ST270PH IIIB - Pier 2, 3, (F/R/P) ( Pile Cap) - WB Outside Widening Area (Bridge over Shingle Creek)1554
IIIBWBO-ST350PH IIIB - Superstructure Deck SIB & Start Rebar - WB Outside Widening (Area Bridge over Universal BLVD)2021
IIIBWBO-ST370PH IIIB - Wall Bent 1 - WB Outside Widening Area (Bridge over Shingle Creek)811
IIIBWBO-ST410PH IIIB - Curing for End Bent 3 - WB Outside Widening Area (Bridge over International DR)711
IIIBWBO-ST450PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over universal BLVD)811
IIIBWBO-ST560PH IIIB - Set Beams - WB Outside Widening Area (Bridge over Shingle Creek)414
IIIBWBO-ST610PH IIIB - Superstructure Deck SIP & Start Rebar - WB Outside Widening Area (Bridge over Shingle Creek)2030
IIIBWBO-ST631PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over International DR)5143
IIIBWBO-ST650PH IIIB - Demo Bridge Deck - WB Outside Widening Area (Bridge over Shingle Creek)643
IIIBWBO-ST660PH IIIB - Remove Beams - WB Outside Widening Area (Bridge over Shingle Creek)243
IIIBWBO-ST670PH IIIB - Demo Pile Cap - WB Outside Widening Area (Bridge over Shingle Creek)343
IIIBWBO-ST680PH IIIB - Extract Pile - WB Outside Widening Area (Bridge over Shingle Creek)343
IIIBWBO-ST750PH IIIB - Gravity Wall @ Shingle Creek - WB Outside Widening (Bridge over Shingle Creek)58
IIIBWBO-TC110PH IIIB - Set Temp Traffic Barriers - WB Outside Widening Area340
IIIBWBO-TC120PH IIIB - Temp Striping for Phase - WB Outside Widening Area4111
IIICWBO-ST100PH IIIA - Demo Bridge - WB Outside Widening Area (Bridge over John Young PKWY)47

The following issues were found:

IIAR100
Finish day is Sunday
IIAR110
Finish day is Sunday
IIBR120
Finish day is Sunday
IIBR140
Finish day is Sunday
IIBR170
Finish day is Sunday
IIICR140
Starts on a day off: Sunday 18-Mar-18 00:00:00
IIICR160
Finish day is Sunday
IVR-ET60
Starts on a day off: Sunday 06-May-18 00:00:00
IAI-TC100
Starts and finishes at the same date and time
IAI-TC110
Starts and finishes at the same date and time
IAI-TC120
Finish day is Sunday
IAR-AP110
Starts and finishes at the same date and time
IAR-AP130
Starts and finishes at the same date and time
IAR-AP140
Starts and finishes at the same date and time
IAR-GC100
Starts and finishes at the same date and time
IAR-TC100
Starts on a day off: Sunday 25-Oct-15 00:00:00
IAR-TC130
Starts on a day off: Sunday 01-Nov-15 00:00:00
Finish day is Saturday
IBR-AP120
Starts and finishes at the same date and time
IBR-EW110
Starts and finishes at the same date and time
IBR-GC120
Starts and finishes at the same date and time
IBR-GC130
Starts and finishes at the same date and time
IBR-GC150
Starts and finishes at the same date and time
IBR-GC160
Starts and finishes at the same date and time
IBR-RW120
Starts and finishes at the same date and time
IBR-RW130
Starts and finishes at the same date and time
IBR-TC100
Starts and finishes at the same date and time
IBR-TC110
Starts and finishes at the same date and time
IIIC-CP10
Starts and finishes at the same date and time
TF-CO-014
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-018
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-019
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-020
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-024
Starts on a day off: Sunday 12-Nov-17 00:00:00
Finish day is Sunday
TF-CO-025
Finish day is Sunday
IAEBO-W110
Finish day is Sunday
IAEBO-W170
Finish day falls on a holiday
IIAR-TC140
Starts and finishes at the same date and time
IIBEBO-ST1
Starts and finishes at the same date and time
IIBEBO-ST3
Starts and finishes at the same date and time
IIBEBO-ST4
Starts on a day off: Sunday 01-May-16 00:00:00
IIBEBO-ST9
Starts and finishes at the same date and time
IIBR-AP110
Finish day is Sunday
IIBR-AP140
Starts on a day off: Sunday 29-Oct-17 00:00:00
IIBR-AP150
Finish day is Saturday
IIBR-AP160
Starts and finishes at the same date and time
IIBR-AP170
Starts and finishes at the same date and time
IIBR-AP180
Finish day is Sunday
IIBR-EW130
Finish day is Sunday
IIBR-EW140
Finish day is Sunday
IIBR-EW180
Starts and finishes at the same date and time
IIBR-GC150
Starts and finishes at the same date and time
IIBR-GC191
Starts and finishes at the same date and time
IIBR-GC240
Starts and finishes at the same date and time
IIBR-GC300
Starts and finishes at the same date and time
IIBR-GC340
Starts and finishes at the same date and time
IIBR-GC390
Starts and finishes at the same date and time
IIBR-GC400
Starts and finishes at the same date and time
IIBR-ITS40
Finish day is Sunday
IIBR-RW120
Finish day is Sunday
IIBR-RW130
Finish day is Sunday
IIBR-RW210
Starts and finishes at the same date and time
IIBR-RW230
Starts and finishes at the same date and time
IIBR-RW290
Starts and finishes at the same date and time
IIBR-SM400
Finish day is Sunday
IIBR-SM410
Finish day is Sunday
IIBR-SM420
Finish day is Sunday
IIBR-SM430
Finish day is Sunday
IIBR-SM470
Finish day is Sunday
IIBR-SP121
Starts and finishes at the same date and time
IIBR-SP140
Starts and finishes at the same date and time
IIBR-SP170
Starts and finishes at the same date and time
IIBR-SP180
Starts and finishes at the same date and time
IIBR-SP190
Starts and finishes at the same date and time
IIBR-SP200
Starts and finishes at the same date and time
IIBR-SP250
Starts and finishes at the same date and time
IIBR-TC230
Starts and finishes at the same date and time
IIBR-TC250
Starts and finishes at the same date and time
IIBR-TC280
Starts and finishes at the same date and time
IIBR-TC290
Starts and finishes at the same date and time
IIBR-TC300
Starts and finishes at the same date and time
IIBR-TC310
Starts and finishes at the same date and time
IIBR-TC320
Starts and finishes at the same date and time
IIBR-TC330
Starts and finishes at the same date and time
IIBR-TC340
Finish day is Sunday
IIBR-TC360
Starts and finishes at the same date and time
IIBR-TC370
Starts and finishes at the same date and time
IIBR-TC380
Starts and finishes at the same date and time
IIBR-TC390
Starts and finishes at the same date and time
IIBR-TC400
Starts and finishes at the same date and time
IIBR-TC410
Starts and finishes at the same date and time
IIBR-TC450
Starts and finishes at the same date and time
IICR-EW100
Finish day is Sunday
IICR-GC110
Starts and finishes at the same date and time
IICR-SP100
Finish day is Sunday
IICR-SP120
Starts on a day off: Saturday 08-Jul-17 00:00:00
IICR-TC140
Starts and finishes at the same date and time
IICR-TC160
Starts on a day off: Saturday 16-Dec-17 00:00:00
Finish day is Sunday
IICR-TC170
Finish day is Sunday
IIDR-TC100
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBR-ET40
Finish day is Sunday
PRE-FA-037
Starts and finishes at the same date and time
PRE-RA-037
Starts and finishes at the same date and time
IAEBO-AP100
Starts on a day off: Sunday 20-Sep-15 00:00:00
Finish day is Saturday
IAEBO-GC120
Starts and finishes at the same date and time
IAEBO-TC110
Starts on a day off: Sunday 27-Sep-15 00:00:00
Finish day falls on a holiday
IAWBO-GC120
Starts and finishes at the same date and time
IAWBO-TC100
Starts on a day off: Sunday 20-Sep-15 00:00:00
Finish day is Sunday
IBEBM-AP100
Finish day is Sunday
IBEBM-AP120
Starts and finishes at the same date and time
IBEBM-GC100
Finish day is Saturday
IBEBM-RW240
Starts and finishes at the same date and time
IBEBM-RW250
Starts and finishes at the same date and time
IBEBM-RW260
Starts and finishes at the same date and time
IBEBM-RW270
Starts and finishes at the same date and time
IBEBM-ST110
Starts on a day off: Sunday 22-Nov-15 00:00:00
IBEBM-ST120
Starts and finishes at the same date and time
IBEBM-ST130
Finish day is Saturday
IBEBM-ST160
Finish day is Sunday
IBEBM-ST190
Start day falls on a holiday
IBEBM-ST210
Starts on a day off: Sunday 06-Mar-16 00:00:00
IBEBM-ST240
Starts on a day off: Sunday 21-Feb-16 00:00:00
Finish day is Sunday
IBEBM-ST430
Finish day is Sunday
IBEBM-ST550
Finish day falls on a holiday
IBEBM-ST580
Starts and finishes at the same date and time
IBEBM-ST660
Finish day is Saturday
IBEBM-ST770
Starts and finishes at the same date and time
IBEBM-ST860
Starts and finishes at the same date and time
IBEBM-ST910
Starts on a day off: Sunday 22-Nov-15 00:00:00
Finish day is Sunday
IBEBM-ST930
Starts on a day off: Sunday 20-Dec-15 00:00:00
IBEBM-ST940
Starts on a day off: Saturday 30-Jan-16 00:00:00
IBEBM-ST990
Finish day is Sunday
IBEBM-TC110
Starts and finishes at the same date and time
IBEBM-TC130
Starts and finishes at the same date and time
IBEBM-TC220
Finish day is Sunday
IBEBO-EW120
Starts and finishes at the same date and time
IBEBO-EW150
Finish day is Sunday
IBEBO-EW160
Start day falls on a holiday
Finish day is Sunday
IBEBO-EW170
Start day falls on a holiday
Finish day is Sunday
IBWBM-RW130
Finish day is Sunday
IBWBM-RW160
Starts and finishes at the same date and time
IBWBM-RW170
Starts and finishes at the same date and time
IBWBM-RW190
Starts and finishes at the same date and time
IBWBM-RW200
Starts and finishes at the same date and time
IBWBM-RW230
Finish day is Sunday
IBWBM-RW240
Starts and finishes at the same date and time
IBWBM-SP120
Finish day is Sunday
IBWBM-ST160
Starts on a day off: Sunday 21-Feb-16 00:00:00
IBWBM-ST230
Finish day is Sunday
IBWBM-ST240
Finish day is Saturday
IBWBM-ST300
Starts on a day off: Sunday 06-Mar-16 00:00:00
Finish day is Sunday
IBWBM-ST390
Finish day falls on a holiday
IBWBM-ST430
Starts and finishes at the same date and time
IBWBM-ST560
Finish day is Saturday
IBWBM-ST620
Finish day is Sunday
IBWBM-ST650
Finish day is Sunday
IBWBM-ST680
Starts and finishes at the same date and time
IBWBM-TC150
Finish day is Sunday
IIBEBO-ST19
Starts and finishes at the same date and time
IIBEBO-ST20
Finish day is Sunday
IIBEBO-ST22
Finish day is Sunday
IIBEBO-ST23
Finish day falls on a holiday
IIBEBO-ST27
Starts and finishes at the same date and time
IIBEBO-W110
Finish day is Sunday
IIBEBO-W120
Finish day is Sunday
IIIBR-EW120
Finish day is Sunday
IIIBR-GC100
Finish day is Sunday
IIIBR-RW160
Finish day is Sunday
IIIBR-SM600
Finish day is Saturday
IIIBR-SM610
Finish day is Saturday
IIIBR-SM620
Finish day is Saturday
IIIBR-SM630
Finish day is Saturday
IIIBR-SP120
Starts and finishes at the same date and time
IIIBR-SP130
Starts and finishes at the same date and time
IIIBR-SP140
Starts and finishes at the same date and time
IIIBR-SP160
Starts on a day off: Sunday 21-Jan-18 00:00:00
Finish day is Sunday
IIIBR-SP180
Finish day is Saturday
IIIBR-TC160
Starts and finishes at the same date and time
IIIBR-TC170
Starts on a day off: Sunday 14-Jan-18 00:00:00
Finish day is Sunday
IIIBR-TC200
Starts and finishes at the same date and time
IIIBR-TC270
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBR-TC280
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBWBO-ST1
Starts and finishes at the same date and time
IIIBWBO-ST2
Starts on a day off: Sunday 18-Mar-18 00:00:00
Finish day is Sunday
IIIBWBO-ST3
Finish day is Sunday
IIIBWBO-ST4
Starts on a day off: Sunday 01-May-16 00:00:00
IIIBWBO-ST8
Finish day is Sunday
IIICR-AP110
Finish day is Saturday
IIICR-EW110
Finish day is Sunday
IIICR-GC160
Starts on a day off: Saturday 02-Jun-18 00:00:00
IIICR-RW130
Finish day is Sunday
IIICR-TC120
Finish day is Saturday
IIAEBO-TC100
Starts on a day off: Sunday 20-Sep-15 00:00:00
Finish day is Sunday
IIAEBO-TC120
Starts and finishes at the same date and time
IIBEBO-AP140
Finish day is Sunday
IIBEBO-EW100
Finish day is Sunday
IIBEBO-EW112
Finish day is Sunday
IIBEBO-GC100
Finish day is Sunday
IIBEBO-SP110
Finish day is Sunday
IIBEBO-SP120
Finish day is Sunday
IIBEBO-SP140
Finish day is Sunday
IIBEBO-ST160
Starts on a day off: Saturday 02-Dec-17 00:00:00
IIBEBO-ST190
Finish day is Sunday
IIBEBO-ST220
Finish day is Sunday
IIBEBO-ST370
Finish day is Sunday
IIBEBO-ST390
Finish day is Sunday
IIBEBO-ST500
Finish day is Sunday
IIBEBO-ST560
Starts on a day off: Saturday 30-Sep-17 00:00:00
Finish day is Saturday
IIBEBO-ST700
Finish day is Sunday
IIDEBO-ST240
Starts on a day off: Sunday 03-Jun-18 00:00:00
IIIAWBO-ST16
Finish day is Sunday
IIIAWBO-ST17
Finish day is Sunday
IIIAWBO-ST20
Starts on a day off: Sunday 08-May-16 00:00:00
IIIAWBO-ST23
Finish day is Sunday
IIIAWBO-ST24
Finish day is Sunday
IIIBWBO-ST14
Starts and finishes at the same date and time
IIIAWBO-ST201
Finish day is Sunday
IIIAWBO-ST420
Finish day falls on a holiday
IIIAWBO-ST600
Starts on a day off: Saturday 23-Sep-17 00:00:00
Finish day is Saturday
IIIBWBO-SP110
Finish day is Sunday
IIIBWBO-ST400
Finish day is Sunday
IIIBWBO-ST440
Finish day is Sunday
IIIBWBO-ST680
Finish day is Sunday
IIIBWBO-ST690
Starts on a day off: Sunday 08-Jul-18 00:00:00
IIIBWBO-ST750
Start day falls on a holiday

The following 97 activities should have started during this schedule period but have not as of October 21, 2018 data date.

Legend

Activities with negative total float

Activity IDActivity DescriptionPlanned Start DateTotal Float
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)05-Dec-16-13
IIBR-GC100PH IIB - Demo - Ramp B09-Dec-16-39
IIBR-EW100PH IIB - Embankment - Ramp B06-Jan-17-39
IIBR-RW100PH IIB - Stabilization - Ramp B08-Feb-17-39
IIBR-RW110PH IIB - Base - Ramp B16-Feb-17-39
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I27-Feb-17-3
IIBR-RW280PH IIB - Shoulder Gutter - Ramp B16-Mar-17-39
IIBR-AP100PH IIB - Asphalt - Structural - Ramp B30-Mar-17-39
IIBR-GC160PH IIB - Guardrail (Roadway) - Ramp B05-Apr-17-39
IIBR-GC120PH IIB - Performance Turf, SOD - Ramp B17-Apr-17-39
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B18-Apr-17-39
IIIBR-GC210PH III C - Demo - old temp Ramp T gore03-May-17-22
IIIBWBO-ST500PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over International DR)05-Jun-17-34
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T08-Jun-17-22
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T12-Jun-17-22
IVR-SM660PH IV - Install Underdeck Lighting/Service (2 EA, OCCC Flyover)25-Sep-17-9
TF-CO-021Install Bollards29-Sep-17-26
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)05-Oct-17-9
IIBEBM-GC110PH IV - Rumble Strips - EB Median09-Oct-17-15
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F19-Oct-17-33
IIICR-GC100PH IIIC - Demo - Old Ramp F20-Oct-17-7
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)21-Nov-17-35
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area21-Nov-17-33
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K28-Nov-17-3
TF-CO-028F+1 Tolling Cabinets + Frames29-Nov-17-26
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F04-Dec-17-32
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)21-Dec-17-35
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)01-Feb-18-73
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)15-Feb-18-73
IVR-IPM70PH IV - Install Post Mount Signs (1-70)22-Feb-18-36
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening22-Feb-18-12
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge22-Feb-18-41
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express28-Feb-18-35
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)01-Mar-18-73
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 21707-Mar-18-30
IVR-IPM80PH IV - Install Post Mount Signs (71-145)08-Mar-18-36
IVEBM-W150PH IV - Median Wall - FFP Stem Station 207 to 21709-Mar-18-30
TF-CO-032Toll Facility CO09-Mar-18-26
IIIBR-ITS180PH IIIB - Pull FOC (JYP to TPK)15-Mar-18-73
NA-GC100TEC Install and Test16-Mar-18-34
IVR-IPM90PH IV - Install Post Mount Signs (146-230)22-Mar-18-36
IVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 21723-Mar-18-30
IIIBR-ITS190PH IIIB - Splice/Terminate FOC29-Mar-18-73
IVWBM-RW110PH IV - Grade for road - Station 207 to 217 WB Express30-Mar-18-30
IVWBM-RW200PH IV - Grade for road - Station 207 to 217 EB Express30-Mar-18-29
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express04-Apr-18-30
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express04-Apr-18-29
IVR-IPM100PH IV - Install Post Mount Signs (231-349)05-Apr-18-36
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB Express06-Apr-18-21
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express06-Apr-18-30
IIIBR-IBM110PH IIIB - Install Bridge Mount Signs19-Apr-18-36
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas26-Apr-18-130
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+5007-May-18-41
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+5021-May-18-41
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+5005-Jun-18-41
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express13-Jun-18-25
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express13-Jun-18-41
IVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express20-Jun-18-25
IVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express20-Jun-18-41
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express26-Jun-18-25
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express26-Jun-18-41
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express09-Jul-18-41
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express10-Jul-18-25
IVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening13-Jul-18-41
GC-GCN210PH MS - Punch List/Acceptance14-Jul-18-190
IVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening16-Jul-18-25
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D17-Jul-18-36
IVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening17-Jul-18-25
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C18-Jul-18-42
IVWBO-PM110PH IV - Pavement Markings (Final) - WB Outside Widening Area26-Jul-18-31
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening27-Jul-18-31
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C Gore26-Sep-160
IIBR-RW310PH IIB - Base - Ramp D15-Dec-161
IIBR-AP151PH IIB - Asphalt - Structural - Ramp D23-Dec-161
IIBR-GC470PH IIB - Performance Turf, SOD - Ramp D27-Dec-161
IBR-AP110PH IB - Asphalt - Structural - Ramp B/C Gore10-Jan-172
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore01-Feb-170
IIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E14-Feb-1721
IIBR-GC430PH IIB - Guardrail (Roadway) - Ramp L13-Mar-174
IIBR-GC370PH IIB - Performance Turf, SOD - Ramp L15-Mar-174
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U20-Mar-1711
IIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C19-Apr-172
IIBR-GC360PH IIB - Guardrail (Roadway) - Ramp H20-Apr-174
IIBR-GC320PH IIB - Performance Turf, SOD - Ramp H24-Apr-174
IIIBR-GC120PH IIIB - Guardrail (Roadway) - Ramp G07-Jul-173
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G11-Jul-173
IIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q13-Sep-172
IIIBR-GC360PH IIIB - Guardrail (Roadway) - Ramp Q13-Sep-171
IIIBR-GC160PH IIIB - Guardrail (Roadway) - Ramp J15-Sep-175
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q15-Sep-171
USDET-CO-002Duke Energy Transmission Phase 418-Sep-1746
IIIBR-GC230PH IIIB - Guardrail (Roadway) - Ramp V11-Oct-1710
IIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V13-Oct-1710
IIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening17-Nov-1712
IIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F06-Dec-174
IIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N07-Dec-176
IVR-RES140PH IV - Remove Existing Sign Structures (14-16)22-Feb-182

The following 96 activities should have started during this schedule period but have not as of October 21, 2018 data date.

Legend

Activities with negative total float

Activity IDActivity DescriptionPlanned Start DateTotal Float
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)05-Dec-16-13
IIBR-GC100PH IIB - Demo - Ramp B09-Dec-16-39
IIBR-EW100PH IIB - Embankment - Ramp B06-Jan-17-39
IIBR-RW100PH IIB - Stabilization - Ramp B08-Feb-17-39
IIBR-RW110PH IIB - Base - Ramp B16-Feb-17-39
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I27-Feb-17-3
IIBR-RW280PH IIB - Shoulder Gutter - Ramp B16-Mar-17-39
IIBR-AP100PH IIB - Asphalt - Structural - Ramp B30-Mar-17-39
IIBR-GC160PH IIB - Guardrail (Roadway) - Ramp B05-Apr-17-39
IIBR-GC120PH IIB - Performance Turf, SOD - Ramp B17-Apr-17-39
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B18-Apr-17-39
IIIBR-GC210PH III C - Demo - old temp Ramp T gore03-May-17-22
IIIBWBO-ST500PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over International DR)05-Jun-17-34
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T08-Jun-17-22
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T12-Jun-17-22
IVR-SM660PH IV - Install Underdeck Lighting/Service (2 EA, OCCC Flyover)25-Sep-17-9
TF-CO-021Install Bollards29-Sep-17-26
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)05-Oct-17-9
IIBEBM-GC110PH IV - Rumble Strips - EB Median09-Oct-17-15
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F19-Oct-17-33
IIICR-GC100PH IIIC - Demo - Old Ramp F20-Oct-17-7
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)21-Nov-17-35
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area21-Nov-17-33
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K28-Nov-17-3
TF-CO-028F+1 Tolling Cabinets + Frames29-Nov-17-26
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F04-Dec-17-32
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)21-Dec-17-35
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)01-Feb-18-73
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)15-Feb-18-73
IVR-IPM70PH IV - Install Post Mount Signs (1-70)22-Feb-18-36
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening22-Feb-18-12
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge22-Feb-18-41
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express28-Feb-18-35
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)01-Mar-18-73
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 21707-Mar-18-30
IVR-IPM80PH IV - Install Post Mount Signs (71-145)08-Mar-18-36
IVEBM-W150PH IV - Median Wall - FFP Stem Station 207 to 21709-Mar-18-30
TF-CO-032Toll Facility CO09-Mar-18-26
IIIBR-ITS180PH IIIB - Pull FOC (JYP to TPK)15-Mar-18-73
NA-GC100TEC Install and Test16-Mar-18-34
IVR-IPM90PH IV - Install Post Mount Signs (146-230)22-Mar-18-36
IVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 21723-Mar-18-30
IIIBR-ITS190PH IIIB - Splice/Terminate FOC29-Mar-18-73
IVWBM-RW110PH IV - Grade for road - Station 207 to 217 WB Express30-Mar-18-30
IVWBM-RW200PH IV - Grade for road - Station 207 to 217 EB Express30-Mar-18-29
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express04-Apr-18-30
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express04-Apr-18-29
IVR-IPM100PH IV - Install Post Mount Signs (231-349)05-Apr-18-36
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB Express06-Apr-18-21
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express06-Apr-18-30
IIIBR-IBM110PH IIIB - Install Bridge Mount Signs19-Apr-18-36
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas26-Apr-18-130
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+5007-May-18-41
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+5021-May-18-41
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+5005-Jun-18-41
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express13-Jun-18-25
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express13-Jun-18-41
IVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express20-Jun-18-25
IVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express20-Jun-18-41
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express26-Jun-18-25
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express26-Jun-18-41
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express09-Jul-18-41
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express10-Jul-18-25
IVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening13-Jul-18-41
GC-GCN210PH MS - Punch List/Acceptance14-Jul-18-190
IVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening16-Jul-18-25
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D17-Jul-18-36
IVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening17-Jul-18-25
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C18-Jul-18-42
IVWBO-PM110PH IV - Pavement Markings (Final) - WB Outside Widening Area26-Jul-18-31
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening27-Jul-18-31
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C Gore26-Sep-160
IIBR-RW310PH IIB - Base - Ramp D15-Dec-161
IIBR-AP151PH IIB - Asphalt - Structural - Ramp D23-Dec-161
IIBR-GC470PH IIB - Performance Turf, SOD - Ramp D27-Dec-161
IBR-AP110PH IB - Asphalt - Structural - Ramp B/C Gore10-Jan-172
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore01-Feb-170
IIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E14-Feb-1721
IIBR-GC430PH IIB - Guardrail (Roadway) - Ramp L13-Mar-174
IIBR-GC370PH IIB - Performance Turf, SOD - Ramp L15-Mar-174
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U20-Mar-1711
IIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C19-Apr-172
IIBR-GC360PH IIB - Guardrail (Roadway) - Ramp H20-Apr-174
IIBR-GC320PH IIB - Performance Turf, SOD - Ramp H24-Apr-174
IIIBR-GC120PH IIIB - Guardrail (Roadway) - Ramp G07-Jul-173
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G11-Jul-173
IIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q13-Sep-172
IIIBR-GC360PH IIIB - Guardrail (Roadway) - Ramp Q13-Sep-171
IIIBR-GC160PH IIIB - Guardrail (Roadway) - Ramp J15-Sep-175
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q15-Sep-171
IIIBR-GC230PH IIIB - Guardrail (Roadway) - Ramp V11-Oct-1710
IIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V13-Oct-1710
IIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening17-Nov-1712
IIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F06-Dec-174
IIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N07-Dec-176
IVR-RES140PH IV - Remove Existing Sign Structures (14-16)22-Feb-182

The following 137 activities should have completed during this schedule period but have not as of October 21, 2018 data date.

Legend

Activities with negative total float

Activity IDActivity DescriptionPlanned Finish DateTotal Float
IBWBO-EW100PH IB - Pond Excav/Embank JYP to TPK - WB Outside Widening13-Oct-16-36
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)14-Oct-16-73
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)19-Oct-16-16
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)02-Nov-16-16
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)14-Nov-16-73
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B09-Dec-16-39
IIBR-GC100PH IIB - Demo - Ramp B21-Dec-16-39
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)04-Jan-17-13
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)04-Jan-17-16
IIBR-SP100PH IIB - Drainage - Ramp B06-Jan-17-39
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)27-Jan-17-72
IIBR-EW100PH IIB - Embankment - Ramp B08-Feb-17-39
IIBR-RW100PH IIB - Stabilization - Ramp B16-Feb-17-39
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E16-Feb-17-36
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-102-Mar-17-3
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)08-Mar-17-41
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I13-Mar-17-3
IIBR-RW110PH IIB - Base - Ramp B16-Mar-17-39
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)21-Mar-17-34
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)24-Mar-17-72
IIBR-RW280PH IIB - Shoulder Gutter - Ramp B30-Mar-17-39
IIBR-AP100PH IIB - Asphalt - Structural - Ramp B05-Apr-17-39
IIBR-GC160PH IIB - Guardrail (Roadway) - Ramp B17-Apr-17-39
IIBR-GC120PH IIB - Performance Turf, SOD - Ramp B18-Apr-17-39
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B19-Apr-17-39
IIIBR-GC210PH III C - Demo - old temp Ramp T gore04-May-17-22
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)16-May-17-32
IIIBR-RW190PH IIIB - Base - Ramp T06-Jun-17-22
IIIBWBO-ST500PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over International DR)07-Jun-17-34
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T12-Jun-17-22
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T13-Jun-17-22
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)15-Jun-17-32
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware03-Jul-17-73
IIIBR-RW110PH IIIB - Base - Ramp G03-Jul-17-36
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G06-Jul-17-36
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)12-Jul-17-11
IVR-SM660PH IV - Install Underdeck Lighting/Service (2 EA, OCCC Flyover)04-Oct-17-9
TF-CO-021Install Bollards06-Oct-17-26
IIBEBM-GC110PH IV - Rumble Strips - EB Median12-Oct-17-15
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F19-Oct-17-33
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening20-Oct-17-34
IIICR-GC100PH IIIC - Demo - Old Ramp F23-Oct-17-7
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)25-Oct-17-53
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)26-Oct-17-9
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)20-Nov-17-35
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)27-Nov-17-53
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area28-Nov-17-33
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F06-Dec-17-32
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K11-Dec-17-3
TF-CO-029Install Conduit/Raceways12-Dec-17-18
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)20-Dec-17-35
TF-CO-026Cont. Lightning02-Jan-18-23
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)02-Jan-18-53
TF-CO-028F+1 Tolling Cabinets + Frames05-Jan-18-26
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)16-Jan-18-3
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)22-Jan-18-35
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)31-Jan-18-53
TF-CO-030Pull Wire07-Feb-18-23
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)13-Feb-18-3
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)14-Feb-18-73
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening22-Feb-18-12
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge22-Feb-18-41
IVWBM-TC100PH IV - Set Temp Traffic Barriers - WB Median Widening27-Feb-18-30
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)28-Feb-18-73
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express06-Mar-18-35
IVWBM-GC100PH IV - Demo Temporary - WB Express06-Mar-18-30
IVR-IPM70PH IV - Install Post Mount Signs (1-70)07-Mar-18-36
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 21708-Mar-18-30
TF-CO-031Toll Facility Finishes and Punchlist09-Mar-18-26
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)14-Mar-18-73
TF-CO-032Toll Facility CO16-Mar-18-26
IVR-IPM80PH IV - Install Post Mount Signs (71-145)21-Mar-18-36
IVEBM-W150PH IV - Median Wall - FFP Stem Station 207 to 21722-Mar-18-30
IIIBR-ITS180PH IIIB - Pull FOC (JYP to TPK)28-Mar-18-73
IVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 21729-Mar-18-30
IVWBM-RW110PH IV - Grade for road - Station 207 to 217 WB Express03-Apr-18-30
IVWBM-RW200PH IV - Grade for road - Station 207 to 217 EB Express03-Apr-18-29
IVR-IPM90PH IV - Install Post Mount Signs (146-230)04-Apr-18-36
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express05-Apr-18-30
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express05-Apr-18-29
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB Express12-Apr-18-21
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express12-Apr-18-30
NA-GC100TEC Install and Test16-Apr-18-34
IVR-IPM100PH IV - Install Post Mount Signs (231-349)18-Apr-18-36
IIIBR-IBM110PH IIIB - Install Bridge Mount Signs24-Apr-18-36
IIIBR-ITS190PH IIIB - Splice/Terminate FOC25-Apr-18-73
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+5018-May-18-41
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+5004-Jun-18-41
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas07-Jun-18-130
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+5012-Jun-18-41
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express19-Jun-18-25
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express19-Jun-18-41
IVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express25-Jun-18-25
IVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express25-Jun-18-41
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express06-Jul-18-41
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express09-Jul-18-25
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express12-Jul-18-41
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express13-Jul-18-25
IVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening16-Jul-18-41
IVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening17-Jul-18-25
IVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening17-Jul-18-25
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C25-Jul-18-42
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D26-Jul-18-36
IVWBO-PM110PH IV - Pavement Markings (Final) - WB Outside Widening Area01-Aug-18-31
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening02-Aug-18-31
GC-GCN210PH MS - Punch List/Acceptance12-Aug-18-190
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C Gore14-Oct-160
IIBR-RW310PH IIB - Base - Ramp D20-Dec-161
IIBR-RW320PH IIB - Stabilization - Ramp D23-Dec-161
IIBR-AP151PH IIB - Asphalt - Structural - Ramp D27-Dec-161
IIBR-GC470PH IIB - Performance Turf, SOD - Ramp D28-Dec-161
IBR-AP110PH IB - Asphalt - Structural - Ramp B/C Gore17-Jan-172
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore06-Feb-170
IIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E20-Feb-1721
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M21-Feb-177
IIBR-GC430PH IIB - Guardrail (Roadway) - Ramp L15-Mar-174
IIBR-GC370PH IIB - Performance Turf, SOD - Ramp L16-Mar-174
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U22-Mar-1711
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp C19-Apr-172
IIBR-GC360PH IIB - Guardrail (Roadway) - Ramp H21-Apr-174
IIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C24-Apr-172
IIBR-GC320PH IIB - Performance Turf, SOD - Ramp H24-Apr-174
IIIBR-GC120PH IIIB - Guardrail (Roadway) - Ramp G10-Jul-173
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G11-Jul-173
IIIBR-GC360PH IIIB - Guardrail (Roadway) - Ramp Q14-Sep-171
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q15-Sep-171
IIIBR-GC160PH IIIB - Guardrail (Roadway) - Ramp J18-Sep-175
IIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q19-Sep-172
USDET-CO-002Duke Energy Transmission Phase 402-Oct-1746
IIIBR-GC230PH IIIB - Guardrail (Roadway) - Ramp V12-Oct-1710
IIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V13-Oct-1710
IIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening22-Nov-1712
IIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F07-Dec-174
IIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N07-Dec-176
IVR-EC30PH IV - Erect Cantilevers (10-15)01-Mar-187
IVR-RES140PH IV - Remove Existing Sign Structures (14-16)01-Mar-182
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area22-Mar-183

The following 136 activities should have completed during this schedule period but have not as of October 21, 2018 data date.

Legend

Activities with negative total float

Activity IDActivity DescriptionPlanned Finish DateTotal Float
IBWBO-EW100PH IB - Pond Excav/Embank JYP to TPK - WB Outside Widening13-Oct-16-36
IIBR-ITS10PH IIB - Install Conduit/Boxes (I-4 to International)14-Oct-16-73
IIBR-IHM320PH IIB - Install High Mast/Service (7-9)19-Oct-16-16
IIIBR-IHM330PH IIIB - Install High Mast/Service (10-13)02-Nov-16-16
IIBR-ITS20PH IIB - Install Conduit/Boxes ( International to Univ)14-Nov-16-73
IIBR-TC160PH IIB - Set Temp Traffic Barriers (Shoulder) - Ramp B09-Dec-16-39
IIBR-GC100PH IIB - Demo - Ramp B21-Dec-16-39
IIAR-TC130PH IIB - Construct variable Widening on I-4 (Ramp B to WB I-4)04-Jan-17-13
IIBR-EHM370PH IIB - Existing High Mast Removal (28-33)04-Jan-17-16
IIBR-SP100PH IIB - Drainage - Ramp B06-Jan-17-39
IIIBR-ITS1000PH IIIB - Install Conduit/Boxes (I-4 to International)27-Jan-17-72
IIBR-EW100PH IIB - Embankment - Ramp B08-Feb-17-39
IIBR-RW100PH IIB - Stabilization - Ramp B16-Feb-17-39
IIBR-GC190PH IIB - Performance Turf, SOD - Ramp E16-Feb-17-36
IIBR-GC210PH IIB - Performance Turf, SOD - Ramp I-102-Mar-17-3
IIIBR-SM510PH IIIB - Shoulder Mount Light Pole/Service (I-4 to International) (15)08-Mar-17-41
IIBR-CP10PH IIB - Construct Ped Signalization at Ramp I13-Mar-17-3
IIBR-RW110PH IIB - Base - Ramp B16-Mar-17-39
IIIBR-SM520PH IIIB - WB Shoulder Mount Light Pole/Service (I-4 to International) (9)21-Mar-17-34
IIIBR-ITS1020PH IIIB - Install Conduit/Boxes (Univ to JYP)24-Mar-17-72
IIBR-RW280PH IIB - Shoulder Gutter - Ramp B30-Mar-17-39
IIBR-AP100PH IIB - Asphalt - Structural - Ramp B05-Apr-17-39
IIBR-GC160PH IIB - Guardrail (Roadway) - Ramp B17-Apr-17-39
IIBR-GC120PH IIB - Performance Turf, SOD - Ramp B18-Apr-17-39
IIBR-TC420PH IIB - MOT Shift for Final Alignment - Ramp B19-Apr-17-39
IIIBR-GC210PH III C - Demo - old temp Ramp T gore04-May-17-22
IIIBR-SM540PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (20 EA) (B)16-May-17-32
IIIBR-RW190PH IIIB - Base - Ramp T06-Jun-17-22
IIIBWBO-ST500PH IIIB - Concrete Slope Pavement - WB Outside Widening Area (Bridge over International DR)07-Jun-17-34
IIIBR-GC290PH IIIB - Guardrail (Roadway) - Ramp T12-Jun-17-22
IIIBR-GC280PH IIIB - Performance Turf, SOD - Ramp T13-Jun-17-22
IIIBR-SM560PH IIIB - Shoulder Mount Light Pole/Service (International to Univ.) (11 EA)15-Jun-17-32
IIIBR-ITS90PH IIIB - Install ITS Cabinets/Hardware03-Jul-17-73
IIIBR-RW110PH IIIB - Base - Ramp G03-Jul-17-36
IIIBR-AP100PH IIIB - Asphalt - Structural - Ramp G06-Jul-17-36
IIBR-SM500PH IIB - Bridge Mount Light Poles/Service (1-10)12-Jul-17-11
IVR-SM660PH IV - Install Underdeck Lighting/Service (2 EA, OCCC Flyover)04-Oct-17-9
TF-CO-021Install Bollards06-Oct-17-26
IIBEBM-GC110PH IV - Rumble Strips - EB Median12-Oct-17-15
IIICR-TC130PH IIIC - Temp Striping New Ramp Alignment - Ramp F19-Oct-17-33
IIBEBO-GC110PH IIB - Performance Turf, SOD - EB Outside Widening20-Oct-17-34
IIICR-GC100PH IIIC - Demo - Old Ramp F23-Oct-17-7
IIIBR-ITS100PH IIIB - Install Vehicle Detection Systems (1-11)25-Oct-17-53
IVR-SM670PH IV - Install Underdeck Lighting/Service (4 EA, I-Drive)26-Oct-17-9
IVR-SM680PH IV - Install Underdeck Lighting/Service (4 EA, Universal)20-Nov-17-35
IIIBR-ITS110PH IIIB - Install Vehicle Detection Systems (12-22)27-Nov-17-53
IIIBWBO-GC110PH IIIB - Performance Turf, SOD - WB Outside Widening Area28-Nov-17-33
IIICR-GC140PH IIIC - Guardrail (Roadway) - Ramp F06-Dec-17-32
IIIBR-CP10PH IIIB - Construct Ped Signalization at Ramp K11-Dec-17-3
TF-CO-029Install Conduit/Raceways12-Dec-17-18
IVR-SM690PH IV - Install Underdeck Lighting/Service (8 EA, JYP)20-Dec-17-35
TF-CO-026Cont. Lightning02-Jan-18-23
IIIBR-ITS130PH IIIB - Install Digital Message Signs (1-12)02-Jan-18-53
TF-CO-028F+1 Tolling Cabinets + Frames05-Jan-18-26
IIIBR-SM640PH IIIB - Shoulder Mount Light Pole/Service (WB around JYP) (9 EA)16-Jan-18-3
IVR-SM700PH IV - Install Underdeck Lighting/Service (4 EA, Consulate Drive)22-Jan-18-35
IIIBR-ITS140PH IIIB - Install Digital Message Signs (13-23)31-Jan-18-53
TF-CO-030Pull Wire07-Feb-18-23
IIIBR-SM650PH IIIB - Bridge Mount Light Poles/Service (11-21)13-Feb-18-3
IIIBR-ITS150PH IIIB - Pull FOC (I-4 to International)14-Feb-18-73
IVEBO-TC100PH IV - Reconfigure & Remove MOT Devices - EB Outside Widening22-Feb-18-12
IVWBO-TC100PH IV - Shift WB traffic to outside over new WB I-Drive Bridge22-Feb-18-41
IVWBM-TC100PH IV - Set Temp Traffic Barriers - WB Median Widening27-Feb-18-30
IIIBR-ITS160PH IIIB - Pull FOC (International to Univ)28-Feb-18-73
IVEBM-GC100PH IV - Demo Temporary pavement - EB Express06-Mar-18-35
IVWBM-GC100PH IV - Demo Temporary - WB Express06-Mar-18-30
IVR-IPM70PH IV - Install Post Mount Signs (1-70)07-Mar-18-36
IVEBM-W140PH IV - Median Wall - Excavate - Station 207 to 21708-Mar-18-30
TF-CO-031Toll Facility Finishes and Punchlist09-Mar-18-26
IIIBR-ITS170PH IIIB - Pull FOC (UNIV to JYP)14-Mar-18-73
TF-CO-032Toll Facility CO16-Mar-18-26
IVR-IPM80PH IV - Install Post Mount Signs (71-145)21-Mar-18-36
IVEBM-W150PH IV - Median Wall - FFP Stem Station 207 to 21722-Mar-18-30
IIIBR-ITS180PH IIIB - Pull FOC (JYP to TPK)28-Mar-18-73
IVEBM-W160PH IV - Median Wall - Rebar/ slip Top Station 207 to 21729-Mar-18-30
IVWBM-RW110PH IV - Grade for road - Station 207 to 217 WB Express03-Apr-18-30
IVWBM-RW200PH IV - Grade for road - Station 207 to 217 EB Express03-Apr-18-29
IVR-IPM90PH IV - Install Post Mount Signs (146-230)04-Apr-18-36
IVWBM-RW180PH IV - Stabilization for road - Station 207 to 217 WB Express05-Apr-18-30
IVWBM-RW210PH IV - Stabilization - Station 207 to 217 EB Express05-Apr-18-29
IVWBM-RW190PH IV - Base for road - Station 207 to 217 WB Express12-Apr-18-21
IVWBM-RW220PH IV - Base - Station 207 to 217 EB Express12-Apr-18-30
NA-GC100TEC Install and Test16-Apr-18-34
IVR-IPM100PH IV - Install Post Mount Signs (231-349)18-Apr-18-36
IIIBR-IBM110PH IIIB - Install Bridge Mount Signs24-Apr-18-36
IIIBR-ITS190PH IIIB - Splice/Terminate FOC25-Apr-18-73
IVEBM-W200PH IV - Median Wall - Excavate - Station 217 to 259+5018-May-18-41
IVEBM-W210PH IV - Median Wall - FFP Stem - Station 217 to 259+5004-Jun-18-41
NA-GC110PH PW - ITS Testing and Commissioning - Critical Areas07-Jun-18-130
IVEBM-W220PH IV - Median Wall - Rebar/ slip Top - Station 217 to 259+5012-Jun-18-41
IVWBM-RW130PH IV - Grade for road Station 217 to 259+50 WB Express19-Jun-18-25
IVWBM-RW260PH IV - Subgrade Station 217 to 259+50 EB Express19-Jun-18-41
IVWBM-RW140PH IV - Stabilization - Station 217 to 259+50 WB Express25-Jun-18-25
IVWBM-RW270PH IV - Stabilization for Station 217 to 259+50 EB Express25-Jun-18-41
IVWBM-RW280PH IV - Base - Station 217 to 259+50 EB Express06-Jul-18-41
IVWBM-RW150PH IV - Base - Station 217 to 259+50 WB Express09-Jul-18-25
IVEBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 EB Express12-Jul-18-41
IVWBM-AP100PH IV - Asphalt - Structural - Station 207 to 259+50 WB Express13-Jul-18-25
IVEBM-TC110PH IV - Remove Temp Barrier - EB Median Widening16-Jul-18-41
IVWBM-TC110PH IV - Remove Temp barrier - WB Median Widening17-Jul-18-25
IVWBM-TC120PH IV - MOT Shift for Phase - WB Median Widening17-Jul-18-25
IVWBO-AP100PH IV - Asphalt - Friction - WB Outside Incl Ramp B,C25-Jul-18-42
IVEBO-AP100PH IV - Asphalt - Friction - EB Outside to JYP incl Ramp A,D26-Jul-18-36
IVWBO-PM110PH IV - Pavement Markings (Final) - WB Outside Widening Area01-Aug-18-31
IVEBO-PM110PH IV - Pavement Markings (Final) - EB Outside Widening02-Aug-18-31
GC-GCN210PH MS - Punch List/Acceptance12-Aug-18-190
IBR-GC100PH IB - Clear & Grub/Demo - Ramp B/C Gore14-Oct-160
IIBR-RW310PH IIB - Base - Ramp D20-Dec-161
IIBR-RW320PH IIB - Stabilization - Ramp D23-Dec-161
IIBR-AP151PH IIB - Asphalt - Structural - Ramp D27-Dec-161
IIBR-GC470PH IIB - Performance Turf, SOD - Ramp D28-Dec-161
IBR-AP110PH IB - Asphalt - Structural - Ramp B/C Gore17-Jan-172
IBR-GC110PH IB - Performance Turf, SOD - Ramp B/C Gore06-Feb-170
IIBR-IB10PH IIB - Install Bores/Loops/Boxes at Ramp E20-Feb-1721
IICR-GC180PH IIC - Guardrail (Roadway) - Ramp M21-Feb-177
IIBR-GC430PH IIB - Guardrail (Roadway) - Ramp L15-Mar-174
IIBR-GC370PH IIB - Performance Turf, SOD - Ramp L16-Mar-174
IIBR-GC460PH IIB - Guardrail (Roadway) - Ramp U22-Mar-1711
IIBR-GC200PH IIB - Grade ditch and SOD - Ramp C19-Apr-172
IIBR-GC360PH IIB - Guardrail (Roadway) - Ramp H21-Apr-174
IIBR-TC430PH IIB - MOT Shift for Final Alignment - Ramp C24-Apr-172
IIBR-GC320PH IIB - Performance Turf, SOD - Ramp H24-Apr-174
IIIBR-GC120PH IIIB - Guardrail (Roadway) - Ramp G10-Jul-173
IIIBR-GC110PH IIIB - Performance Turf, SOD - Ramp G11-Jul-173
IIIBR-GC360PH IIIB - Guardrail (Roadway) - Ramp Q14-Sep-171
IIIBR-GC350PH IIIB - Performance Turf, SOD - Ramp Q15-Sep-171
IIIBR-GC160PH IIIB - Guardrail (Roadway) - Ramp J18-Sep-175
IIIBR-CP170PH IIIB - Construct Ped Signalization at Ramp Q19-Sep-172
IIIBR-GC230PH IIIB - Guardrail (Roadway) - Ramp V12-Oct-1710
IIIBR-GC200PH IIIB - Performance Turf, SOD - Ramp V13-Oct-1710
IIIBWBM-GC110PH IIIB - Rumble Strip (Widening) - WB Median Widening22-Nov-1712
IIICR-GC120PH IIIC - Performance Turf, SOD - Ramp F07-Dec-174
IIICR-GC130PH IIIC - Performance Turf, SOD - Ramp N07-Dec-176
IVR-EC30PH IV - Erect Cantilevers (10-15)01-Mar-187
IVR-RES140PH IV - Remove Existing Sign Structures (14-16)01-Mar-182
IVWBO-SS100PH IV - Install Overhead Signs Structures - WB Outside Widening Area22-Mar-183

Project Costs

The numbers in this report should not be relied upon, excercise caution and double-check the values.
This table represents monthly costs in E8P02 Update No 36

MonthActualActual CumulRemaining EarlyRemaining Early CumulRemaining LateRemaining Late Cumul
Aug-2015$5,906,772.92$5,906,772.920000
Sep-2015$2,471,526.40$8,378,299.320000
Oct-2015$4,010,141.75$12,388,441.070000
Nov-2015$1,370,791.46$13,759,232.530000
Dec-2015$1,087,352.39$14,846,584.930000
Jan-2016$665,835.32$15,512,420.250000
Feb-2016$1,013,974.26$16,526,394.500000
Mar-2016$635,461.93$17,161,856.430000
Apr-2016$695,096.93$17,856,953.360000
May-2016$1,841,865.56$19,698,818.920000
Jun-2016$2,133,459.20$21,832,278.120000
Jul-2016$2,666,571.77$24,498,849.890000
Aug-2016$1,556,235.15$26,055,085.040000
Sep-2016$1,375,097.31$27,430,182.350000
Oct-2016$1,187,196.19$28,617,378.540000
Nov-2016$1,080,977.50$29,698,356.040000
Dec-2016$3,493,958.18$33,192,314.220000
Jan-2017$2,518,687.26$35,711,001.480000
Feb-2017$2,206,879.69$37,917,881.170000
Mar-2017$2,866,857.38$40,784,738.550000
Apr-2017$1,820,613.08$42,605,351.630000
May-2017$1,500,322.86$44,105,674.490000
Jun-2017$1,810,796.01$45,916,470.500000
Jul-2017$1,537,190.48$47,453,660.980000
Aug-2017$2,251,744.38$49,705,405.360000
Sep-2017$1,742,718.15$51,448,123.500000
Oct-2017$2,515,027.06$53,963,150.560000
Nov-2017$2,682,347.93$56,645,498.490000
Dec-2017$2,525,253.10$59,170,751.600000
Jan-2018$2,699,943.26$61,870,694.860000
Feb-2018$2,229,196.52$64,099,891.380000
Mar-2018$2,788,612.63$66,888,504.010000
Apr-2018$2,425,962.04$69,314,466.050000
May-2018$2,718,592.52$72,033,058.570000
Jun-2018$1,373,138.22$73,406,196.800000
Jul-2018$1,138,335.30$74,544,532.1000$564,508.81$564,508.81
Aug-2018$1,493,678.52$76,038,210.6100$1,079,669.61$1,644,178.42
Sep-2018$1,370,812.93$77,409,023.5400$2,109,514.81$3,753,693.23
Oct-2018$2,073,235.13$79,482,258.67$4,777,943.78$4,777,943.78$5,262,603.90$9,016,297.13
Nov-201800$3,228,161.84$8,006,105.62$3,985,463.06$13,001,760.18
Dec-201800$2,770,242.78$10,776,348.40$517,954.15$13,519,714.33
Jan-201900$2,028,299.43$12,804,647.830$13,519,714.33
Feb-201900$76,163.63$12,880,811.460$13,519,714.33
Mar-2019000$12,880,811.460$13,519,714.33
Apr-201900$3,793.00$12,884,604.460$13,519,714.33
May-201900$36,505.54$12,921,110.000$13,519,714.33
Jun-201900$404,873.56$13,325,983.560$13,519,714.33
Jul-2019000$13,325,983.560$13,519,714.33

Charts

The numbers in this report should not be relied upon, excercise caution and double-check the values.
This chart represents monthly costs in E8P02 Update No 36